Seakeeper 5 / 6 Installation Manual (90402-5) 6/5-233-5847 to Current
6.2 Installation Checklist
Please Complete Checklist and E-mail to support@seakeeper.com.
6.1.1 Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)
- Seakeeper foundation installed in hull
- Foundation bolts torqued to specification
6.1.2 Electrical Checklist
(Reference Seakeeper Drawing No. 90396 – Seakeeper 5/6 Cable Block Diagram & Installation Manual Section: Electrical Installation)
Mount Components
- Display (near helm)
Connect Customer Supplied Cables
- Cable 3 (Customer Supplied)
- Install lugs on both ends of customer-supplied 10 AWG ground cable
- Connect one end of Cable 3 to nearest vessel ground and other end to Seakeeper rear brace
Connect Seakeeper Supplied Cables
- Cable 1 (Seakeeper Supplied)
- Connect other end of Cable 1 to 12 VDC power at customer-supplied connection box or directly to circuit breaker
- Plug connector of Cable 1 into mating connector on Seakeeper wire harness
- Cable 9 (Seakeeper Supplied)
- Connect Cable 9 from SW PUMP VDC IN directly to circuit breaker
- Cable 5 (Seakeeper Supplied)
- Connect Cable 5 from SW PUMP VDC OUT to customer-supplied 12 VDC seawater pump
- Cable 4 (Seakeeper Supplied)
- Connect female end of CAN communications Cable 3 to mating connector on Seakeeper wire harness
- Route CAN communications Cable 3 from Seakeeper to helm (male end goes to helm)
- Connect male end of CAN communications Cable 4 at helm to CAN Tee Adapter
- Connect Display and Seakeeper-supplied Cable 4 to CAN Tee Adapter with CAN Terminator
6.1.3 Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)
- Verify coolant level just below filler neck in heat exchanger coolant reservoir.
- Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump.
- Verify 2.5 GPM (9.5 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.
6.1.4 Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)
- Remove lifting bolts and install cover panels
- Turn on 12 VDC circuit breakers (one for power and one for 12 VDC SW Pump)
- Turn on 110-230 VAC circuit breaker
- Verify display works and no ALARMS are present
- Follow instructions in Installation Manual Section: Start Up Instructions to turn on the Seakeeper
- Verify seawater pump eventually turns on when the Seakeeper is ON
- Verify that no ALARMS are present
- Follow instructions in Installation Manual Section: Start Up Instructions to turn off the Seakeeper
- AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the Seakeeper in LOCK mode and turning the Seakeeper off
- Seakeeper takes 4 or more hours to coast down to 0 RPM from full speed