Seakeeper 2 Installation Manual (90488-4); S/N 2-232-1564 to Current
5.3 Tools Required for Installation
List of Common Tools That May Be Required for Installation
Item | Description | Use |
1 | Hoist, Forklift, or Crane | Unpacking and lifting Seakeeper 3 into position |
2 | Transfer Punch Kit | Locate foundation hole penetrations |
3 | Drill / Drill Press | Bolt hole penetrations |
4 | Threaded Insert Installation Kit | Tap and install threaded inserts (M14-2 X 1.5) |
5 | Flexible Extendable Magnet, McMaster P/N: 3838A42 or similar | Lowering foundation bolts into place |
6 | 1/2″ Drive Torque Wrench | Foundation Bolts (155 ft-lbs/210 Nm) |
7 | 12 – 18″ Extension, 1/2″ Drive | Foundation Bolts |
8 | 24mm Socket, 1/2″ Drive | Foundation Bolts |
9 | Utility Knife | Scoring Cable Jackets |
10 | Wire cutter | DC Power cables |
11 | Wire stripper | DC Power cables |
12 | Greenlee K05-Synchro Crimp Tool or equivalent | 12 VDC High-Current Input Cables, 2AWG Ground Cable, 4 AWG |
13 | Heat Gun | For cables 1, 2, and 6 heat shrink |
14 | ¼ in. (7mm) Nut Driver / Flat Head Screwdriver | Hose clamps |
15 | Fish Tape | Cable Pulls |
16 | Hole Saw | Thru-hull fittings |