5.3 Tools Required for Installation

List of Common Tools That May Be Required for Installation

ItemDescriptionUse
1Hoist, Forklift, or CraneUnpacking and lifting Seakeeper 3 into position
2Transfer Punch KitLocate foundation hole penetrations
3Drill / Drill PressBolt hole penetrations
4Threaded Insert Installation KitTap and install threaded inserts (M14-2 X 1.5)
5Flexible Extendable Magnet, McMaster P/N: 3838A42 or similarLowering foundation bolts into place
61/2″ Drive Torque WrenchFoundation Bolts (155 ft-lbs/210 Nm)
712 – 18″ Extension, 1/2″ DriveFoundation Bolts
824mm Socket, 1/2″ DriveFoundation Bolts
9Utility KnifeScoring Cable Jackets
10Wire cutterDC Power cables
11Wire stripperDC Power cables
12Greenlee K05-Synchro Crimp Tool or equivalent12 VDC High-Current Input Cables, 2AWG Ground Cable, 4 AWG
13Heat GunFor cables 1, 2, and 6 heat shrink
14¼ in. (7mm) Nut Driver / Flat Head ScrewdriverHose clamps
15Fish TapeCable Pulls
16Hole SawThru-hull fittings