1.0 Introduction

Seakeeper 2

Installation Manual

90488, Rev 4

This document is intended to give details and guidance to a boat builder or equipment installer to install the Seakeeper 2 (Serial 2-232-1564 to Current).

Reference Documents:

1.1 Precautions

  1. The Seakeeper must only be lifted from the supplied lifting eyes (see Section: Transport and Unpacking).
  2. The Seakeeper flywheel is supported by precision bearings. While unpacking and lifting the Seakeeper assembly DO NOT drop or impart mechanical shock as damage to bearings could result.
  3. While handling / installing the Seakeeper assembly, protect exposed hydraulic brake cylinder rods (see figure 1) from scratches or damage as this could lead to premature seal failure and oil leaks.
  4. While handling / installing the Seakeeper assembly, do not allow electrical fittings that exit bottom of the Seakeeper enclosure to come in contact with any surface or object as this could damage the fittings and potentially affect the vacuum integrity of the enclosure.
  5. Exercise care to protect the painted finish as damage to finish could lead to early appearance degradation of the installed Seakeeper.

1.1.1 Safety

There is a large torque about the gimbal axis when the Seakeeper is precessing. Seakeeper cover panels are provided to prevent personnel or equipment from contacting the Seakeeper while it is in operation. These covers should not be stepped on or have anything placed on top. The covers should always be in place during operation.

_________________________________________________________________________________________

If it is ever necessary to access the Seakeeper while the flywheel is spinning, the Seakeeper must be locked at the display to stop the Seakeeper from precessing.

_________________________________________________________________________________________

Stand clear of the Seakeeper and all moving components during operation.

_________________________________________________________________________________________

Unit may be started remotely. Assume it could move without warning.

_________________________________________________________________________________________

The following must be true before accessing the Seakeeper:
• Input power must be disconnected for at least 10 minutes
Seakeeper must be locked
• Flywheel must be at zero speed


1.2 Transport and Unpacking

Reference Documents:

1.2.1 Transport

  1. Use a Seakeeper provided shipping crate for transport, P/N 11851. Overall dimensions of a fully packed crate are 36.25 L x 35.75 W x 38 H in. (0.92 L x 0.91 W x 0.97 H m) with a weight of 482 lbs (219 kg).
  2. Seakeeper 2 crates can be stacked up to two (2) units high. Only like units should be stacked, i.e., Seakeeper 2 on top of a Seakeeper 2
  3. Both Air and Ground transport are acceptable.
  4. Seakeeper shipping crates must be transported in environmental conditions between -4°F and 140°F (-20°C and 60°C).

1.2.2 Unpacking Crate

  1. Reference Seakeeper Drawing No. 90469 – Seakeeper 2 Hardware Scope of Supply, for items that ship with the corresponding Seakeeper model.
  2. Remove covers, electrical components, display, cables, and misc. items and set aside.
  3. Remove packing materials that secure Seakeeper assembly inside the crate.
  4. Attach spreader bar (P/N 11766; available for purchase) to the two lifting eyes located on the top of the Seakeeper enclosure. Stay clear of any other parts on the Seakeeper. The Seakeeper 2 weighs 414 lbs (188 kg). See Figure 1 below.
Figure 1 – Seakeeper 2 Lifting Arrangement