Start Up Introduction

This section describes the first start up of the Seakeeper.

Reference Documents & Drawings:
Link to Seakeeper 35/30HD Reference Documents

  • 90269 – Seakeeper 35/30HD Operation Manual
  • Previous sections for mechanical, electrical and cooling installation must be completed before this start up sequence is initiated.
  • Before continuing, covers must be installed unless the Seakeeper is inaccessible and there is no risk to injury. Also, the area around the Seakeeper must be clear of personnel and equipment.