This section explains how to connect the 2nd Operator Station Kit.
Reference Documents & Drawings
- 90467 – Helm Display 2nd Operator Station Kit
- 90288 – Seakeeper 35/30HD Cable Block Diagram (includes detail of 2nd Operator Station)
Determine Location of 2nd Operator Station
- The desired location of the 2nd Operator Station must be determined with respect to the 1st Operator Station and the vessel arrangement.
- Typical locations include:
- Flybridge
- Engine room
Determine Cabling Arrangement
- Figure 10 below shows the entire serial communications link for 2 Operator Stations. The Terminator must be installed on the Tee Adapter farthest from the Seakeeper.

- The Operator Station nearest the Seakeeper should be connected to Cable 3.
Route 2nd Operator Station Cable
- A second CAN Cable Assembly (P/N 30243), also a 25 m shielded cable, and the largest connector is a molded plug with maximum outer diameter of .58 in. (14.8 mm).
- The additional CAN Cable Assembly must be routed in the vessel from the 1st Operator Station (female end) to the 2nd (male end) Operator Station.
Install 2nd Operator Station Equipment
- The 2nd Operator Station equipment is installed at the determined location using instructions found in Section: Electrical Equipment Mounting.
Connect 2nd Operator Station Equipment
- The 2nd Operator Station equipment is connected in accordance with Drawing No. 90288 – Seakeeper 35/30HD Cable Block Diagram.