Seakeeper 26 Installation Manual (90265-8); S/N 26-233-0690 to Current
5.1 Installation Requirements Introduction
This section describes the first start up of the Seakeeper.
Reference Documents & Drawings:
Link to Seakeeper manuals
- 90266 – Seakeeper 26 Operation Manual

- Previous sections for mechanical, electrical and cooling installation must be completed before this start up sequence is initiated.
- Before continuing, covers must be installed unless the Seakeeper is inaccessible and there is no risk to injury. Also, the area around the Seakeeper must be clear of personnel and equipment.