Seakeeper 26 Installation Manual (90265-8); S/N 26-233-0690 to Current
6.1 Installation and Start Up Introduction
Reference Documents & Drawings
- 90271 – Seakeeper 26 Bolt-In Installation Details
- 90272 – Seakeeper 26 Bond-In Installation Details
- 90310 – Seakeeper 26 Cable Block Diagram
- 90320 – Seakeeper 26 Cooling Water Schematic
- 90437 – Seakeeper Commissioning Form
- SWI-105 – Commissioning Checklist
The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completing the installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the Commissioning Form.
All Seakeeper stabilizers should be commissioned to verify that installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Commissioning Form, all the items in the Installation Checklist, and verification of operation without alarms or abnormal behavior.
Please Complete Checklist and E-mail to support@seakeeper.com.