5.1 Installation Checklist

Please Complete Checklist and E-mail to
customerservice@seakeeper.com or telefax to +1.410.326.1199

5.1.1 Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)

_____ Seakeeper foundation installed in hull

_____ Foundation bolts torqued to specification

5.1.2 Electrical Checklist
(Reference Seakeeper Drawing No. 90257 – Seakeeper 9 Cable Block Diagram & Installation Manual Section: Electrical Installation)

Mount Components

_____ Display (near helm)

Connect Customer Supplied Cables

Cable 6 (Customer supplied)

_____ Install lugs on both ends of customer-supplied 10 AWG ground cable

_____ Connect one end of Cable 6 to nearest vessel ground and other end to Seakeeper 9 rear brace

Connect Seakeeper Supplied Cables

Cable 1

_____ Connect Cable 1 from Seakeeper to 24 VDC power at customer-supplied connection box or directly
to circuit breaker

_____ Plug connector of Cable 1 into mating connector on Seakeeper wire harness

Cable 2

_____ Connect Cable 2 from Drive Box to 230 VAC single phase at customer-supplied connection box
or directly to circuit breaker

Cable 8

_____ Connect Cable 8 from Seakeeper to 24 VDC /10 A power at customer-supplied connection box
or directly to circuit breaker

_____ Plug connector of Cable 8 into mating connector on Seakeeper wire harness at DC SW Pump In

Cable 5

_____ Connect Cable 5 from DC SW Pump Out to 24 VDC seawater pump

Cable 3

_____ Connect female end of CAN communications Cable 3 to mating connector on Seakeeper wire
harness

_____ Route CAN communications Cable 3 from Seakeeper to helm (male end goes to helm)

_____ Connect male end of CAN communications Cable 3 at helm to CAN Tee Adapter

_____ Connect Display and Seakeeper-supplied Cable 4 to CAN Tee Adapter with CAN Terminator

5.1.3 Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)

_____ Verify coolant level in heat exchanger coolant reservoir (2/3 maximum)

_____ Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump

_____ Verify 4 GPM (15 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat
heat exchanger under all operating conditions of the boat

5.1.4 Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)

_____ Remove lifting eyebolts and install cover panels

_____ Turn on 24 VDC circuit breakers

_____ Turn on 230 VAC circuit breaker

_____ Verify display works and no ALARMS are present

_____ If display does not work, turn off both circuit breakers immediately

_____ Check polarity of 24 VDC power per Section 2.2.5

_____ Follow instructions in Installation Manual Section: Start Up Instructions to turn on the Seakeeper

_____ Verify seawater pump turns on while the Seakeeper is turned ON

_____ Verify no ALARMS are present

_____ Follow instructions in Installation Manual Section: Startup Instructions to turn off the Seakeeper

_____ AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the
Seakeeper in LOCK mode and turning the Seakeeper off

_____ Seakeeper 9 takes 4+ hours to coast down to 0 RPM from full speed