5.1 Start Up Introduction

This section describes the first start up of the Seakeeper.

Reference Documents & Drawings:
Link to Seakeeper 5/6 Reference Documents

  • 90403 – Seakeeper 6 / 5 Operation Manual
  • Previous sections for mechanical, electrical and cooling installation must be completed before this start up sequence is initiated.
  • Before continuing, covers must be installed and the area around the Seakeeper must be clear of personnel and equipment!