Seakeeper 5 / 6 Installation Manual (90402-4) 6/5-222-5365 to 6/5-233-5846

1.0 Introduction

Seakeeper 6 / 5

Installation Manual

90402, Revision 4

*THIS MANUAL ALSO COVERS THE SEAKEEPER 5 MODEL*

Applicable to model serial number 6-222-5365 to 6-2333-5846.

This document is intended to give details and guidance to a boat builder or equipment installer to install the Seakeeper 5 and Seakeeper 6 Stabilization Systems.

Reference Documents

1.1 Precautions

  1. Seakeeper must only be lifted from the supplied lifting eyes (see Section: Transport and Unpacking).
  2. Seakeeper flywheel is supported by precision bearings. Make certain while unpacking and lifting Seakeeper assembly to NOT drop or impart mechanical shock as damage to bearings could result.
  3. While handling / installing Seakeeper assembly, protect exposed hydraulic brake cylinder rods (See Figure 1) from scratches or damage as this could lead to premature seal failure and oil leaks.
  4. While handling / installing Seakeeper assembly, do not allow electrical fittings that exit bottom of Seakeeper enclosure to come in contact with any surface or object as this could damage the fittings and potentially affect the vacuum integrity of the enclosure.
  5. Exercise care to protect the painted finish as damage to finish could lead to early appearance degradation of installed Seakeeper.
Figure 1 Seakeeper 6

1.1.1 Safety

There is a large torque about the gimbal axis when the Seakeeper is precessing. Seakeeper cover panels are provided to prevent personnel or equipment from contacting the Seakeeper while it is in operation. These covers should not be stepped on or have anything placed on top. The covers should always be in place during operation.

_____________________________________________________________________________________________________

If it is ever necessary to access the Seakeeper while the flywheel is spinning, the Seakeeper must be locked at the display to stop the Seakeeper from precessing.

_____________________________________________________________________________________________________

Stand clear of the Seakeeper and all moving components.

_____________________________________________________________________________________________________

The unit may be started remotely. Assume it could move without warning.

_____________________________________________________________________________________________________

The following must be true before accessing the Seakeeper:
* Input power must be disconnected for at least 10 minutes
* It must be locked
* Flywheel must be at zero speed

1.2 Transport & Unpacking

Reference Documents

1.2.1 Transport

  1. Use a Seakeeper provided shipping crate for transport, P/N 10977. Overall dimensions of a fully packed crate are 43.5 L x 41.5 W x 36.25 H in. (1.10 L x 1.05 W x 0.921 H m) with a weight of 1100 lbs (500 kg).
  2. Do not stack Seakeeper shipping crates.
  3. Both Air and Ground transport are acceptable.
  4. Seakeeper shipping crates must be transported in environmental conditions between 32°F and 140°F (0°C and 60°C).

1.2.2 Unpacking Crate

  1. Reference Seakeeper Drawing No. 90389 – Seakeeper 6 Hardware Scope of Supply, for items that ship with the Seakeeper.
  2. Remove electrical components, cables, and misc. items and set aside.
  3. Remove packing materials that secure Seakeeper assembly inside the crate.
  4. Remove top and angled face cover panels to access lifting eyes.
  5. Attach spreader bar (P/N 80067) to the two lifting eyes located on the top of the Seakeeper enclosure. Stay clear of any other parts on the Seakeeper. The Seakeeper 6 weighs 870 lbs (395 kg). See Figure 2 below.
Figure 2 Seakeeper 6 Lifting Arrangement
P/N 80067 – Seakeeper 6 Low Profile Lifting Bar

2.0 Mechanical Installation

2.1 Mechanical Installation Introduction

The Seakeeper 6 is capable of producing loads up to 3820 lbs (17 kN) at each of the four mounts. These forces should be considered to be acting simultaneously, fully reversing, and will repeat an infinite number of times. Careful consideration should be given to foundation design to ensure it is capable of transferring these loads into the hull. These loads do NOT include vessel motion accelerations, such as vertical slam loads which can be significant for higher speed vessels. The responsible party for designing the supporting structure (boat builder, installer, or hired sub-contractor) must accommodate the above forces plus a reasonable factor of safety. Seakeeper recommends a minimum safety factor of 3.0 (yielding a Safety Margin of 2.0).

There are two methods of installing the Seakeeper 6:
1. Bolt-In Installation
2. Saddle Installation

It is assumed that the installer is familiar with bonding using high strength adhesives or mechanical fasteners to marine structures and has performed structural analysis to assure the structure to which the Seakeeper mounts can properly transfer the loads the Seakeeper creates into the hull structure. If the installer has any doubt about the ability of the structure to transfer the loads to the hull then a licensed naval architect or marine engineer should be contacted to do a structural analysis.

The installer should review the following list of reference drawings to ensure the installation procedure is fully understood.

Reference Documents & Drawings:

2.2 Selection of Installation Location

Seakeeper can only assess installation location regarding its impact on Seakeeper operation and serviceability. Seakeeper cannot determine how the installation location will affect the vessel static or directional stability other than cyclic roll reduction. The Installer is responsible for considering the Seakeeper‘s effect on the CG location, trim, overall stability, and performance of the vessel.

Selection of mounting location of Seakeeper should consider the following desirable features:

  1. Overhead access or sufficient clearance for removal / re-installation of the Seakeeper for overhaul in future years. Provide adequate clearance for maintenance, as shown in Figure 1 and 2 below.
  2. The Seakeeper should be installed in a dry space to minimize effects of corrosion.
  3. Installed near vessel’s longitudinal center of gravity (LCG) to minimize effects on trim and performance in various loading conditions.

VIEWS SHOWING RECOMMENDED CLEARANCES AROUND THE SEAKEEPER FOR USE OF HANDTOOLS, EASE OF MAINTENANCE, INSTALLATION, AND PROPER OPERATION.

Figure 1 Seakeeper 6 Installed Clearance Considerations

Figure 2 Seakeeper 6 Transverse Beams Clearance Considerations

Refer to Figure 2 for recommended clearances to transverse beams. If a transverse beam is located under the forward brace, it must be 4 in. (102 mm) from the edge of the saddle beams to provide the necessary clearance for the swing of the motor power cable during precession. Clearances aft of the Seakeeper are shown to provide access for maintenance.

2.2.1 Noise/Soundproofing

Seakeeper noise has been measured under steady state conditions (no wave load) in Seakeeper‘s Engineering Lab and in our Factory Demo Boat. The steady state noise is typically <72 dBC at 1 meter. As the frequencies emitting the highest sound pressures are low (like other marine machinery), it is recommended that the Seakeeper be installed in a machinery space that is already treated with soundproofing.

2.3 Selection of Installation Method

The Seakeeper 6 can be affixed to the hull structure using two methods 1) Bolt-In installation or 2) Saddle installation. See figures below.

Figure 3 Option 1- Direct Fastening of Seakeeper Foundation to Ships Structure

Option 1 would be applied when a metal structure is available for attachment. The foundation would fasten directly to hull structure using isolation gaskets and sixteen M12-1.75 fasteners. Depending on the structure to which the Seakeeper is fastened, blind threaded holes or thru-bolting can be utilized.

Figure 4 Option 2- Saddle Installation (4 Places)

Option 2 would be most commonly used on a hull constructed of glass reinforced plastic (GRP) or fiberglass. For this option, four 7.5 in. (191 mm) long by 3.38 in. (85.7 mm) deep saddles are bonded to properly spaced and prepared structural members that are an integral part of the hull structure. Seakeeper recommends using a structural adhesive with a lap shear strength of 2000 psi (13.8 MPa) or greater. Careful consideration should be exercised by the installer while selecting the appropriate adhesive. Compatibility with the Seakeeper’s cast aluminum A356- T6 saddles, hull structure and pot life are three important factors to consider. Proper surface preparation in accordance with adhesive manufacturer’s recommendations prior to installation is very important.

2.4 Bolt-In Installation

2.4.1 Preparation of Vessel Structure

Seakeeper provided mounting hardware is intended to apply to typical installation arrangements. However, each installation, especially custom aftermarket foundations, should be thoroughly reviewed to ensure the provided hardware meets the required thread engagement for the Seakeeper unit being installed. The mounting bolt thread engagement requirements are outlined in the Installation Manuals and Installation Details Drawings for each Seakeeper model. This also applies to Seakeeper model adapter kits and OEM built frames where the bolt hole depth should be checked to ensure the bolts will not bottom, preventing the bolts from achieving the intended preload.

The Seakeeper supporting structure should be parallel to the vessel waterline, with up to 2 degrees allowance for trim.

In addition, the four areas on top of the beams on which the feet of the Seakeeper foundation and isolation gaskets will rest need to be co-planar within .06 in. (1.5 mm) to minimize potential distortion of Seakeeper support frame when installed. The isolation gaskets are only used when the Seakeeper 6 is mounted to a dissimilar metal structure.

When the Seakeeper provided hardware is not appropriate, the bolt specification (diameter and thread pitch) and grade should be matched in the required length and used with the Seakeeper provided washers. Mounting bolts should always be torqued to the Seakeeper specification. All Seakeeper provided bolts are metric course thread. Hardware specifications are also listed in the Installation Manuals and Installation Details Drawings.

Refer to Seakeeper Drawing No. 90398 – Seakeeper 5/6 Bolt-In Installation Details. Important dimensional and load information is given in this drawing that will impact the design details of the structure that will receive the Seakeeper. It is assumed that a proper structural analysis has been performed for the hull structure to which the Seakeeper will be fastened to ensure proper strength margins for the loads the Seakeeper will create during operation.

Seakeeper provides an installation template kit, P/N 90392, which contains four plates that mimic the mating surfaces of the four feet located on the Seakeeper’s foundation. These plates have 4 holes located at the same centers as the mounting holes on the Seakeeper. The fixture locates the hole patterns at the proper spacing both in the forward-aft direction and the port-starboard direction. See Figure 5 below. Once assembled, the fixture can be used to check clearances and alignment of the hull structure.

Note: Do NOT use the installation fixture to establish Seakeeper envelope dimensions. Refer to Drawing No. 90398 – Seakeeper 6 Bolt-In Installation Details, for envelope dimensions. A 3-D model of the Seakeeper is available on the Seakeeper website (www.seakeeper.com) to aid in designing the Seakeeper foundation and the space around the Seakeeper.

NOTE: MAKE SURE NO OBSTRUCTIONS FROM THE HULL STRUCTURE CAN BE SEEN WITHIN THE INSIDE OF THE INSTALLATION TEMPLATE KIT (INSIDE THE MARKED RED LINES). REFERENCE SEAKEEPER DRAWING NO. 90398 – SEAKEEPER 6 BOLT-IN INSTALLATION DETAILS.

Figure 5 Installation Template Kit, P/N 90392
Figure 6 Seakeeper 6 Bolt-In Clearance Dimensions

CAUTION: Tight clearances from cable guide bands and brake side gimbal shaft to hull structure. See below for brake side gimbal shaft clearance. See above figure for dimensions and reference Seakeeper Drawing No. 90398 – Seakeeper 6 Bolt-In Installation Details, for complete Seakeeper envelope.

Figure 7 Brake Side Gimbal Shaft Clearance

2.4.2 Transfer of Holes to Boat Structure

  1. Lower assembled fixture onto hull structure.
  2. The four areas where the feet of the Seakeeper will rest should be coplanar to within .06 in. (1.5 mm). See figure below.
  3. Align fixture in desired location and transfer holes from fixture plate to the foundation structure. Note that holes in fixture plate are ø0.487 in. (12 mm). A transfer punch is supplied with installation template kit, P/N 90392.

Figure 8 Bolt-In Hole Transfer Fixture

2.4.2.1 Blind Hole Installation

  1. Remove Template Fixture and drill sixteen(16) 0.49 in. (12.5 mm) holes perpendicular to the vessel structure to a minimum depth of 0.94 in. (24 mm). Take special care to drill perpendicular to mounting surface. A drill guide is recommended. Remove any impeding obstructions.
  2. Tap drilled holes for helical thread inserts per documentation accompanying helical threaded inserts.
  3. Install sixteen (16) M12-1.75 X 18 mm threaded inserts into holes in hull structure at drilled and tapped locations using threaded insert manufacturer provided installation tool.
  4. Remove threaded insert prong / tang after threaded inserts are installed.
Example threaded insert
M12-1.75 X 18 mm

2.4.2.2 Through-Bolt Installation

  1. Remove Template Fixture and drill sixteen (16) 0.512 in. (13 mm) ø holes perpendicular to the vessel structure. Take special care to drill perpendicular to mounting surface. A drill guide is recommended.

2.4.3 Installation of Seakeeper

  1. Locate and position four foundation spacers (P/N 11241) onto hull structure.
    1. For dissimilar metal foundations, locate and position four isolation gaskets (P/N 11145) onto foundation beams and apply a small bead of marine sealant (SILI-THANE 803 or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and the Seakeeper.
  2. Lower Seakeeper into position onto foundation beams and align over drilled holes.
  3. Install Mounting Bolts:
    1. For Blind-Hole installations (P/N 90400 – Seakeeper 6 / 5 Bolt-In Kit), install the Seakeeper supplied M12-1.75 fasteners to maintain a minimum thread engagement of 0.71 in. (18 mm). Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 11.
    2. For Through-Bolt installations (P/N 90660 – Seakeeper 6 / 5 Through-Bolt Kit), install the Seakeeper supplied M12-1.75 fasteners to maintain a minimum of 2 threads protruding past nut. Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 12.
  4. Torque all fasteners to 95 ft-lbs (129 N-m).
    1. New bolts, matching the Seakeeper specification, must be used for each installation and reinstallation that meet the requirements listed above.
  5. Proceed to electrical and cooling portion of the installation.
Figure 9 Seakeeper 6 Bolt-In Installation
Figure 10 Seakeeper 6 Stack Arrangement
Figure 11 – Blind Hole Details
Figure 12 – Thru-Bolt Details

2.5 Saddle Installation

2.5.1 Saddle Installation Introduction

Seakeeper recommended adhesives are listed in TB-90382 – Structural Adhesives Recommendations. Seakeeper recommends using a structural adhesive with a lap shear strength of 2000 psi (13.8 MPa) or greater. Careful consideration should be exercised by the installer when selecting the appropriate adhesive, such as working time, material compatibility, and surface preparation are three important factors to consider. Proper surface preparation in accordance with the adhesive manufacturer’s recommendations prior to installation is critically important. Information regarding pot-life, structural properties and material compatibility can be found on the adhesive product’s technical data sheet (TDS). An etching/cleaning primer compatible with the adhesive should be used on all aluminum surfaces if recommended by the manufacturer. Typically, two-part methacrylate based adhesives are the best options for bond-in installations such as Plexus MA590 and Sci-Grip SG300, which provide compatibility with aluminum and FRP substrates, adequate working time, and exceed the strength requirements. See Sheet 5 of Seakeeper Drawing No. 90399 – Seakeeper 5/6 Bond-In Installation Details, for loads information and recommended adhesive properties.

2.5.2 Preparation of Hull Structure

Refer to Seakeeper Drawing No. 90399 – Seakeeper 5/6 Bond-In Installation Details. Important dimensional and load information is given in this drawing that will impact the design details of the structure that will receive the Seakeeper as well as selection of the adhesive to bond the Seakeeper into the hull.

The foundation “saddles” of the Seakeeper are designed to be bonded directly to the composite hull structure of the vessel to effectively distribute gyroscopic loads. Complete coverage of the saddles and the hull structure surfaces is required for bond-in installations. Seakeeper recommends having a minimum of 1.6 L / 0.41 gal of adhesive, on hand for installation. Number of cartridges required is determined by dividing total volume by cartridge volume. Some adhesives require etching primer for aluminum surfaces (Plexus MA590 requires PC120 primer). Both manual and pneumatic application guns are available from adhesive manufacturers. Two workers should apply the adhesive at the same time to finish the installation before the adhesive starts to cure. To aid in determining the quantity of adhesive required, the interior surface area (bonding surfaces) of each saddle is 58.2 in.2 (375 cm2) for a total bonded surface area for all four saddles of 232.5 in.2 (1500 cm2).

The hull structure supporting the Seakeeper should be installed so the Seakeeper is parallel to the waterline. The four areas on top of the beams that the saddles will bond to need to be co-planar within .13 in. (3 mm) for consistent adhesive bond gap. In addition, the four areas on top of the saddles on which the feet of the Seakeeper foundation will rest need to be co-planar within .06 in. (1.5 mm) to minimize potential distortion of Seakeeper support frame when installed.

Note that any paint or gel-coat present in bond area should be removed so that adhesive will bond directly to laminate fibers and resin. Fiberglass and aluminum surfaces should be sanded in a cross-hatch pattern with 80 grit sandpaper and thoroughly cleaned prior to adhesive application.

Seakeeper provides an installation fixture template, P/N 90392, that locates the saddles at the proper spacing both in the forward-aft direction and the port-starboard direction. See Figures 13 & 14 below. Once assembled with the provided saddle fittings, the fixture can be used to check saddle clearances and alignment of the hull structure. The fixture will allow the builder / installer to lay-up and adjust the foundation dimensions to create a low-clearance fit between the Seakeeper foundation saddles and the hull structure. Shear strength of the adhesive will be maximized if the cured thickness between the vessel structure and Seakeeper saddles is at the thinner end of the adhesive manufacturer’s recommended range. Therefore, the fixture should be used to confirm that the overall dimensions of the foundations are square and level and that the adhesive gap is within Seakeeper’s maximum recommended thickness of .13 in. or 3 mm.

Note: Do NOT use the installation fixture to establish Seakeeper envelope dimensions. Refer to Drawing No. 90399 – Seakeeper 5/6 Bond-In Installation Details, for envelope dimensions. A 3-D model of the Seakeeper is available on the Seakeeper website (www.seakeeper.com) to aid in designing the Seakeeper foundation and the space around the Seakeeper.

NOTE: MAKE SURE NO OBSTRUCTIONS FROM THE HULL STRUCTURE CAN BE SEEN WITHIN THE INSIDE OF THE INSTALLATION TEMPLATE KIT (INSIDE THE MARKED RED LINES). SEE DRAWING NO. 90399 – SEAKEEPER 5/6 BOND-IN INSTALLATION DETAILS.

Figure 13 Exploded View of Saddle Installation Fixture
Figure 14 Saddle Installation Fixture on Notional Hull Structure

2.5.3 Fiberglass Hull Preparation

  1. Position installation fixture (Figure 15) on hull girders noting recommended clearances for maintenance from Figure 2 (in Section: Selection of Installation Location). Check that the screws fastening the saddles to the installation fixture are tight (Figure 13).
Figure 15 Installing Fixture on Hull
  1. Mask hull area (Figure 16) around foundation saddles for easy clean-up and to create outline of surface area to receive adhesive (Figure 15). Ensure that the bond gap is within Seakeeper’s recommended thickness, or 3 mm if using Plexus MA590 or Sci-Grip SG300.
Figure 16 Masking Perimeter of Saddles
  1. Raise fixture clear of foundation. Check all four mounting areas are co-planar to within .06 in. (1.5 mm) to each other, as well as parallel to the water line plane, as shown in Figure 17.
Figure 17 Coplanar Properties of Foundation
  1. Thoroughly clean with alcohol or acetone all areas of girders to be bonded to remove any contaminates. Use new paper towels for cleaning, not shop rags.
  2. Remove any paint or gel-coat from bond surfaces so that adhesive will bond directly to laminate fibers and resin as shown in Figure 13.
  3. Thoroughly sand girder bond surfaces with 80 grit sandpaper in a cross-hatch pattern. (IMPORTANT – BOND STRENGTH MAY BE REDUCED IF THIS STEP IS SKIPPED.)
  4. Wipe surfaces clean from dust with alcohol or acetone using new paper towels, not shop rags.
  5. Re-position installation fixture on girders and double-check that the adhesive gap is within the adhesive manufacturer’s maximum recommended thickness. Seakeeper recommends a maximum gap of 3 mm if using Plexus MA590 or Sci-Grip SG300.

Note: If bonding saddles to a metal structure, follow adhesive manufacturer instructions for metal substrates.

2.5.4 Seakeeper Saddle Preparation

  1. Ensure that screws fastening saddles to the installation fixture are tight (Figure 13).
  2. Check that each saddle contains 2 plastic screws which will ensure an adhesive gap of .080 in. (2 mm) on top surface of hull as shown in Figure 18.
Figure 18 Saddle Cleaning

3. Thoroughly sand all saddle inside surfaces with 80 grit sandpaper. (IMPORTANT – BOND STRENGTH MAY
BE REDUCED IF THIS STEP IS SKIPPED.)

4. Wipe surfaces clean from dust with alcohol or acetone using new paper towels, not shop rags.

5. If using Plexus MA590 adhesive, apply Plexus PC-120 surface conditioner to inside surfaces of Seakeeper
foundation saddles in accordance with manufacturer instructions. These instructions are located at the end
of this section. If using an alternate adhesive, check with manufacturer if any surface conditioner/etch is
required for the aluminum saddles.

2.5.5 Bonding Saddles to Hull

Note: If using Plexus MA590 adhesive, the Seakeeper saddles should be installed when PC-120 is confirmed dry.

  1. Assemble Plexus cartridge into either the manual or pneumatic gun as shown. Remove cap on cartridge and attach mixing tip. For pneumatic gun, start with low air pressure and increase until desired flow rate is achieved.
  1. Cut tip of mixing wand as shown in photo below.
  1. Prepare a second mixing wand as shown in photo below by attaching the simple flexible nozzle to the end of the mixing tip. Set aside for now as this will be used to inject adhesive into the sides of each saddle after the fixture / saddles are in position.
  1. Install provided rubber plugs in six holes of each saddle. The plugs will limit the adhesive being forced out of the injection holes in step 6 below.
  1. Apply large bead of Plexus adhesive to the hull structure as shown in the image below. Apply approximately 1/3 to 1/2 of a cartridge (150 – 200 mL) at each of the four locations. Work deliberate and fast as it takes some time to apply the adhesive to the structure. MA590 has a 90-minute working time at room temperature (73°F / 23°C). This working time can reduce to 40-50 minutes at elevated temperatures. Two workers should apply the adhesive at the same time to finish the installation before the adhesive starts to cure.
  1. Lower fixture and saddles over the hull structure and apply light downward pressure to each of the four saddles until the two nylon screws rest on the hull structure (see Figure 12). The adhesive will be forced towards the forward and aft ends of each saddle and partially down the sides of the foundation beams.
  2. Insert full adhesive cartridge along with mixing wand / nozzle assembled in Step 3 above into gun.
  3. Begin to inject adhesive into the six holes provided on each side of each of the four saddles. Follow the numbered sequence shown until the adhesive pushes out the edges of the saddle perimeter. The intent is to pump in the adhesive working from the top down and from the middle to the ends to fill the gaps and displace any air.

A complete bond is required – excess adhesive will be needed to make sure all bond gaps are filled.

  1. Repeat above steps on both sides of all four saddles.
  2. When gaps have been completely filled, clean off excess adhesive, remove plugs, and remove masking tape.
  3. Allow adhesive to cure per manufacturer’s recommendations. Follow adhesive guidelines for curing time versus temperature prior to removing the fixture.
  4. Bonding of Seakeeper saddles onto the hull is now complete. Remove installation fixture.

2.5.6 Installation of Seakeeper

  1. The four areas where the feet of the Seakeeper will rest should be coplanar to within .06 in. (1.5 mm). See figure below.

    NOTE: DO NOT INSTALL SEAKEEPER WITH 1/2 IN. SPACERS WITH SADDLE KIT.
  2. Rig Seakeeper for lifting and lower into position onto top surface of four saddles.
  3. Apply a small bead (approximately 4 mm wide) of sealant or caulk to the mating surfaces between the saddles and the Seakeeper foundation. Adjust position of Seakeeper until alignment is achieved for the 16 fasteners that will attach Seakeeper foundation frame to saddles.
  4. Install Seakeeper supplied M12-1.75 X 65 mm fasteners – apply a moderate coat of removable thread locker to the threads of each bolt and include a small bead of sealant under each washer before installation.
  5. Torque all fasteners to 65 ft-lbs (88 N-m).
  6. Proceed to electrical and cooling portion of the installation.

3.0 Electrical Installation

3.1 Electrical Installation Introduction

This section for electrical installation explains how to mount the electrical equipment and how to connect the electrical cables.

Reference Documents & Drawings:

12 VDC Power Connector, Cable 1
P/N 20248
Terminator, Female – P/N 30249
Tee Adapter – P/N 30244
Touch Screen Display – P/N 30298
USB Extension, Cable 7 – P/N 30300
CAN, Cable 4, 2 ft – P/N 30301
CAN, Cable 3, 25 m – P/N 30332
DC Pump Power Out, Cable 5
P/N 20334
DC Pump Power In, Cable 8
P/N30327

Figure 1 Electrical Equipment for Seakeeper 6

3.2 Electrical Equipment Power Connections

3.2.1 AC Input Power Source Requirements

  1. Either of two AC input voltages are acceptable:
    1. 110 – 120 VAC (nominal) (+/- 10%), 1 Phase, 50/60 Hz, 30 A
    2. 208 – 230 VAC (nominal) (+/- 10%), 1 Phase, 50/60 Hz, 20 A
  2. A separate circuit breaker should be used for each Seakeeper Drive Box.

3.2.2 Drive Box AC Power Input Connection Instructions

  1. Cable: 3 x 10 AWG (3 x 6mm2 CSA), 10 ft (3 m) length, Seakeeper supplied pre-installed.
    1. Locate Cable 2 for AC power input to the Drive Box at the outward of two cable glands.

Figure 2 Drive Box AC Power Input & Output Cable Glands

3.2.3 Low Current 12 V Power Input

  1. One 12 VDC, 15 A (Customer supplied) for Seakeeper Control Power, AND
  2. One 12 VDC, 15 A OR 24 VDC, 10 A (Customer supplied) for DC Seawater Pump.
  3. A dedicated breaker should be used for Seakeeper control and Seawater Pump power for each Seakeeper unit.

3.2.4 Seakeeper DC Power Connection Instructions


Reversing polarity on the DC power input to the Seakeeper can result in damaging the electronics in the control system.

  1. 12 VDC, 15 A, 2 x 12 AWG (3 x 4 mm2 CSA) customer supplied.
    1. Install Seakeeper provided DC Power Input Cable, P/N 20248 as Cable 1 (as shown in Drawing No.90396).
      1. Route Cable 1 to DC Power Distribution Panel.
      2. Terminate positive (B+, Red) conductor through dedicated over-current protection device (customer supplied) and a dedicated Seakeeper isolation switch (customer supplied) then directly to battery plus terminal.
      3. Terminate negative (B-, Black) conductor directly to battery negative terminal or negative bus.
    2. Before connecting Cable 1 to Seakeeper, check for proper voltage and polarity with a DC multimeter using Figure 3 below.
    3. Connect Cable 1 to 12 VDC input receptacle on Seakeeper.
Figure 3 DC Power Input Connector Contact Assignments (front)

When energizing DC power the first time, if Display does not power up immediately then disconnect and inspect connector polarity.

3.2.5 DC Seawater Pump 12 VDC Power Input Connection Instructions

Connecting the DC Seawater pump in any other manner than recommended by Seakeeper may cause internal failure.

  1. Install Cable 8 (P/N: 30327) to Seakeeper 6 “SW Pump DC In” (as shown in Drawing No. 90396) with overcurrent protection corresponding to seawater pump selected.
  2. Connect the 16 AWG plus conductor (red) through dedicated overcurrent protection device (customer-supplied), maximum of 15 A, to dedicated battery isolation switch.
    • 24 VDC, 10 A max can be used for Seawater Pump power.
  3. Connect the 16 AWG minus conductor (black) directly to battery minus terminal or DC main negative bus bar.
  4. Before connecting Cable 8 to Seakeeper, check for proper voltage and polarity with a DC multimeter using Figure 4 below.
Figure 4 – 12 VDC Seawater Pump Power Input
  1. Connect Cable 8 to Seawater Pump 12 VDC In connector on the Seakeeper, DEUTSCH DT04-2P connector.

3.2.6 DC Seawater Pump 12 VDC Power Output Connection Instructions

  1. Connect Cable 5 (P/N 20334) to the Seakeeper 6 “SW Pump 12VDC Out” for DC power output to the seawater pump.
    1. Cable 5 is a 2 x 16AWG cable, 16 ft (5 m) length, with a size 16 female Deutsch plug.
  2. Pumps rated at 12 VDC, 15 A maximum (24 VDC, 10 A), customer-supplied, must be configured with a Deutsch DT series, 2-pin receptacle to mate with the connector shown in Figure 5.
Figure 5 Seawater Pump Deutsch Connector
  1. Cable 5 must be routed and installed in the vessel from the Seakeeper 6 “SW Pump 12VDC Out” Deutsch connector (pins end) to the DC seawater pump cable Deutsch connector (socket end).
  2. Connect Cable 5 plug end (socket end) to the customer-supplied receptacle end (pins end). The recommended wiring is shown in Figure 6.
  3. Contact Seakeeper if desired to install customer-supplied relay on Cable 5 to power Seawater Pump.
Figure 6 – Cable 5 – Seawater Pump

3.3 Electrical Equipment Ground Connections

Seakeeper to Vessel Ground Connection Instructions

  1. Connect the Seakeeper foundation ground to vessel ground as shown in Figure 7.
  2. Install Cable 6 (4 AWG or 22.0 mm2, Customer supplied) from the M6 brass ground stud on the Seakeeper rear brace to a suitable vessel ground.
    • EN/IEC 90204-1 Clauses 6.3.3 and 8.2.3
    • ABYC E-11 July 2018 Clauses 11.5.2 and 11.16.1.

NOTE: USE ONLY THIS LOCATION FOR GROUNDING THE SEAKEEPER TO THE VESSEL GROUND.

Figure 7 Seakeeper Ground Stud on Rear of Foundation

3. Ground connection should be made with vessel bonding system, if available. However, the ground is not
referring specifically to a bonding system but for outboard boats generally refers to the outboard engine
negative terminal. Per ABYC E-11 (2018), Clause 11.5.2.7.4: If the negative side of the DC system is to be
connected to the ground, the connection shall be made only from the engine negative terminal, or its bus, to
the DC grounding bus. This connection shall be used only as a means of maintaining the negative side of the
circuit at ground potential and is not to carry current under normal operating conditions.

4. A proper ground connection is critically important for corrosion protection and helps to ensure the
ignition protection of the unit by ensuring it does not carry any stray current.

3.4 Electrical Equipment Mounting

Precautions: Each item of electrical equipment has specific mounting instructions. These instructions
should be followed to ensure proper function of the Seakeeper.

Do NOT move Seakeeper mounted components from their
locations or incorrect Seakeeper operation will result.

3.4.1 Seakeeper 6 Display Options

The Seakeeper 6 includes a 5″ Touch Screen Display (P/N 30296) standard. The 5″ Touch Display can be integrated with compatible Multifunction Display systems, per the MFD Compatibility Technical Bulletins.

The Seakeeper MFD App provides an interface for controlling the Seakeeper 6 and viewing the Settings, Service, Info, and Alarm pages from a compatible MFD.

The following figures provide schematics of display options. The subsequent sections outline the instructions and references for connecting the Seakeeper 6 to MFD display option.

3.4.2 Connecting to an Optional Compatible MFD

  1. The Seakeeper 6 can be connected to a variety of available MFD systems. Refer to the Technical Bulletins Section of the Seakeeper Technical Library for manufacturer specific MFD compatibility technical bulletins.
    • MFD specific Technical Bulletins will be updated regularly as new MFD systems become compatible. Currently GARMIN, RAYMARINE, NAVICO (Simrad, Lowrance, B&G), and FURUNO offer compatible MFD models.
    • Once a compatible MFD has been selected, refer to the appropriate manufacturer specific Technical Bulletin for integration instructions.
  2. Connect Seakeeper-supplied Cable 9 (P/N 30330), D-Code 10 m cable to MFD manufacturer-specific Ethernet adapter cable. Custom Ethernet cables for specific MFD manufacturers are available through Seakeeper and must be purchased with the Seakeeper 6 if connecting to an MFD.

3.4.3 Installing the Seakeeper 5″ Touch Display

  1. Touch Display Mounting Instructions, Surface Mount
    1. Console space required: Approx. 5.24 W x 3.70 H in. (133 x 94 mm)
    2. Mounting Instructions, Surface Mount: See Drawing No. 90438 – 5″ Operator Display Envelope and Mounting Details, for details.
  2. CAN Communications Tee Adapter and Terminator Mounting Instructions:
    The CAN Cable Assembly (P/N 30332, Cable 4) is an 82 ft (25 m) shielded cable and the largest connector is a molded plug with maximum outer diameter of .58 in. (14.8 mm)
    1. Console space required, Rear: Approx. 4 W x 3 H in. (102 x 76 mm)
    2. Mounting Instructions: Rear mount on vessel console panel, within 1 ft (0.3 m) of Display.
    3. Hardware required: One mounting screw for .197 in. (5 mm) diameter mounting hole on Tee Adapter.
  3. USB Extension Cable Assembly Mounting Instructions:
    Cable 7 is 6.5 ft (2 m) long cable
    1. Console space required: Approx. 2 W x 2 H in. (51 x 51 mm), within 5 ft (1.5 m) from Touch Display.
    2. Mounting Instructions, Surface Mount: Use panel cutout as shown in Section: Display Installation Template. Maximum panel thickness 1/8 in. (3.2 mm).
    3. Install sealed USB connector end of the extender cable assembly in panel from rear and secure with hex jam nut (provided) on front.
    4. Connect M12 connector end of the extender cable assembly to the rear of the Touch Display on receptacle AUX.

3.5 Multifunction Display (MFD) Connection

Reference Documents & Drawings

  1. The Seakeeper can be connected to a variety of available MFD systems. Refer to the Technical Bulletins Section of the Seakeeper Technical Library for manufacturer specific MFD compatibility technical bulletins.
    1. MFD specific Technical Bulletins will be updated regularly as new MFD systems become compatible. Currently GARMIN, RAYMARINE, SIMRAD, and FURUNO offer compatible MFD models.
    2. Once a compatible MFD has been selected, refer to the appropriate manufacturer specific Technical Bulletin for integration instructions.
  2. Connect D-Code 10 m cable, P/N 30330, to MFD manufacturer-specific Ethernet adapter cable. Custom Ethernet cables for specific MFD manufacturers are available through Seakeeper and must be purchased if connecting to an MFD. Connect the D-Code cable according to Figure 10. The ethernet port on the back of the display is shown in Figure 11.
Figure 10 – Cabling for MFD
Figure 11 – Ethernet Port on Operator Station circled in red

4.0 Cooling Installation

4.1 Cooling Installation Introduction

The Seakeeper 6 is shipped with the cooling circuit filled and ready for use. Only a quick confirmation of glycol level is required.

Reference Documents & Drawings:
Link to Seakeeper 6 / 5 Reference Documents

Figure 1 Seakeeper 6

4.2 Cooling System Considerations

  1. Installer is responsible for supplying a dedicated seawater pump and associated plumbing. Seawater connections on the heat exchanger mate with ¾ in. (19 mm) hose. An optional seawater pump can be purchased through Seakeeper, P/N30331.
  2. There is no need to disconnect hose from glycol pump except to replace the pump. In this case, provision will need to be made to catch draining glycol as plumbing is disconnected. Use caution to avoid breaking plastic hose connections on pump casing.
  3. The seawater pump is powered by Cable 5, via “SW Pump 12 VDC Out” on the Seakeeper 6, as outlined in Electrical Installation Section.
    • This pump must operate on 12 VDC, 15 A OR 24 VDC, 10 A power. Pumps requiring other voltages or higher current can still be controlled by using this supply to trigger an installer-supplied contactor but a separate source of power must be provided.
  4. A dedicated through-hull fitting should be installed for each Seakeeper unit onboard the vessel to ensure sufficient seawater flow to each unit.
  5. It is recommended that the seawater pump is located below the waterline, as close to the baseline of the vessel as practically possible, to maintain positive inlet pressure on the pump in all operating conditions.
  6. A self-priming seawater pump is recommended to maintain water flow in all underway conditions. Cavitation can occur at the seawater inlet and potentially cause an air-lock condition restricting seawater flow to the heat exchanger.
  7. Vented loops are optional and should only be considered with centrifugal style pumps. Self-priming or positive displacement style pumps do not require a vented loop, this includes Seakeeper P/N 30331.
  8. Maximum seawater pressure in heat exchanger is 20 psi (1.4 bar)
  9. Seawater flow requirement through heat exchanger is 2.5 GPM (9.5 LPM) minimum and 8 GPM (30.3 LPM) maximum under all operating conditions of the boat. When sizing seawater pump, installer should factor in losses for raw water plumbing. In addition to initial operation at dock, new installations should be checked to be within the flow requirements while vessel is at speed. Flows higher than 8 GPM (30.3 LPM) could affect heat exchanger life.
Figure 2 Seakeeper 6 Cooling Components

4.3 Connecting Seawater to Heat Exchanger

4.3.2 Connecting Seawater to Heat Exchanger

Refer to Figure 4 for typical seawater plumbing arrangement.

Figure 4 – Typical Seawater Plumbing Arrangement
  1. Connect seawater pump to Seakeeper dedicated through-hull fitting. A strainer and seacock valve should generally be installed between the seawater inlet and the pump.
  2. Connect seawater from installer-supplied pump to lower ¾ in. (19 mm) hose barb on heat exchanger. Use the same practices as other below waterline seawater plumbing. Required flow rate is 2.5 GPM (9.5 LPM) minimum and 8 GPM (30.3 LPM) maximum.
  1. Connect seawater discharge (upper hose barb) to overboard drain. Use the same practices as other below waterline seawater plumbing.
  2. In addition to initial operation at dock, new installations should be checked for minimum 2.5 GPM (9.5 LPM) flow while vessel is at speed and when backing down.
    • If no other method of confirming flow is available, discharge line may be temporarily diverted to a bucket. Flow is calculated from time to fill a known volume.
    • A self-priming seawater pump (customer/installer supplied) may be required due to installation location to maintain water flow in all underway conditions where cavitation may occur and potentially cause an air-lock condition restricting seawater flow to the heat exchanger.
  3. Inspect raw water plumbing after sea trial for any signs of leakage.
  4. Heat exchanger contains removable end-caps to provide access for cleaning the tube bundle.

4.3.3 Seakeeper Optional DC Seawater Pump (P/N 30331)

  1. Seakeeper offers a self-priming DC Seawater pump as an optional addition, P/N 30331– DC Seawater Pump Assembly, shown in Figure 6.
  2. The Seakeeper Seawater Pump is a 24 VDC pump operated at 12 VDC for the Seakeeper 6.
  3. The pump assembly is pre-wired for connection to Seakeeper 6 Cable 5 and includes a seawater strainer and various fittings. The pump specifications are as follows:
Volts24 VDC (operate at 12 V for Seakeeper 6)
Rated Flow2.5 – 8 GPM (9.5 – 30.3 LPM)
Overcurrent Protection Rating15 A
Ignition ProtectionISO 8846 or equivalent
Figure 6Seakeeper 6 DC Seawater Pump (P/N 30331)

NOTE: Use only SeaFlo-provided threaded fittings for DC Seawater Pump 30331.

4.4 Adding Coolant

  1. Cooling system is filled to proper level when shipped, with a mixture of 50% ethylene glycol and 50% distilled water. The clear tube between heat exchanger and reservoir should be filled with green coolant mixture. If level has dropped, check for evidence of leaks at all connections before adding fluid as described below. If coolant is at the correct level, skip to Section: Connecting Seawater to Heat Exchanger.
Figure 3 Seakeeper 6 Coolant Level
  1. Mix 50% ethylene glycol with 50% distilled water in a clean container. Refer to Table 1 or glycol manufacturer’s literature for freezing points.
  1. Pour mixture in until level reaches two-thirds of reservoir as shown in Figure 3. Filling reservoir above this level will not cause any damage but coolant may be expelled from pressure relief port in cap due to normal thermal expansion of coolant.
  2. Connect 12 V to controller.
    1. At the Display check for any ALARMS

    2. Press the POWER ON/OFF button.
    3. The flywheel will start to spin and the glycol pump will start.
    4. Recheck glycol level with fluid circulating in coolant circuit. Sight down inside reservoir and check that coolant level is above upper port on reservoir as shown in Figure 3. Replace cap.
    5. After several minutes of running, press POWER ON/OFF button to turn power off to the flywheel and glycol pump. The glycol pump will stop and the flywheel will coast to a stop.
  3. The cooling system is self-purging. If small amounts of air are in the system, they will most likely be dislodged during the first sea trial. Re-check level after sea trial and add fluid if required.

5.0 Start Up

5.1 Start Up Introduction

This section describes the first start up of the Seakeeper.

Reference Documents & Drawings:
Link to Seakeeper 5/6 Reference Documents

  • 90403 – Seakeeper 6 / 5 Operation Manual
  • Previous sections for mechanical, electrical and cooling installation must be completed before this start up sequence is initiated.
  • Before continuing, covers must be installed and the area around the Seakeeper must be clear of personnel and equipment!

5.2 Start Up Instructions

  1. Energize 12 VDC supply at the customer-supplied electrical disconnect.
  2. Supply 110-230 VAC to Motor Drive Box at customer-supplied electrical disconnect.
  3. Turn on the boat’s DC dedicated circuit breaker that supplies power to the DC seawater pump.
  4. With system powered up check the display for any ALARMS. If there are any ALARMS present they must be corrected first.
  5. Press the Seakeeper ON/OFF Button on Display. The progress bar will appear and indicate how soon the Seakeeper will be available for stabilization. When the Seakeeper is initialized and up to minimum operating speed the STABILIZE button will appear. At this point, the Seakeeper is available for stabilization.
  1. The seawater pump will operate for two minutes after the ON/OFF button on the display was depressed. After that the seawater pump output is turned on and off based on the temperature of the Seakeeper. Confirm pump operation and flow rate, if practical. Required flow is 2.5 GPM (9.5 LPM) minimum and 8 GPM (30 LPM) maximum.
  2. Verify that there are no ALARMS present. If an ALARM is present it will be displayed.
  3. When the Seakeeper reaches its maximum operating speed where maximum stabilization is available, the progress bar will disappear and the Seakeeper is available for maximum stabilization. Press the STABILIZE button. The button will turn blue indicating that the Seakeeper is stabilizing the roll motion.
  1. Verify that there are no ALARMS. If an ALARM is present it will be displayed.
  2. Press the STABILIZE Button to turn stabilization off. Then press the Seakeeper ON/OFF Button to power the Seakeeper down.
  3. During normal operation, the Seakeeper should be stopped when stabilization is no longer required. This maximizes long term life as it allows the Seakeeper to start the coast down cycle before cooling is shutoff. Once the vessel is secured in the slip and the crew has shut down the generator and engines, the AC and DC breakers that control the Seakeeper should be switched to the OFF position. The Seakeeper will continue to spool down to 0 RPM. No cooling is required during this time. Note the Seakeeper 6 will take 4+ hours to coast down to 0 RPM from full speed. When the flywheel has stopped the service screen will indicate 0 RPM.

6.0 Installation Checklist and Required Supplies

6.1 Installation Checklist

Please Complete Checklist and E-mail to support@seakeeper.com or telefax to +1.410.326.1199

6.1.1 Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)

  • Seakeeper foundation installed in hull
  • Foundation bolts torqued to specification

6.1.2 Electrical Checklist
(Reference Seakeeper Drawing No. 90396 – Seakeeper 5/6 Cable Block Diagram & Installation Manual Section: Electrical Installation)

Mount Components

  • Display (near helm)

Connect Customer Supplied Cables

  • Cable 3 (Customer Supplied)
    • Install lugs on both ends of customer-supplied 10 AWG ground cable
    • Connect one end of Cable 3 to nearest vessel ground and other end to Seakeeper rear brace

Connect Seakeeper Supplied Cables

  • Cable 1 (Seakeeper Supplied)
    • Connect other end of Cable 1 to 12 VDC power at customer-supplied connection box or directly to circuit breaker
    • Plug connector of Cable 1 into mating connector on Seakeeper wire harness
  • Cable 9 (Seakeeper Supplied)
    • Connect Cable 9 from SW PUMP VDC IN directly to circuit breaker
  • Cable 5 (Seakeeper Supplied)
    • Connect Cable 5 from SW PUMP VDC OUT to customer-supplied 12 VDC seawater pump
  • Cable 4 (Seakeeper Supplied)
    • Connect female end of CAN communications Cable 3 to mating connector on Seakeeper wire harness
    • Route CAN communications Cable 3 from Seakeeper to helm (male end goes to helm)
    • Connect male end of CAN communications Cable 4 at helm to CAN Tee Adapter
    • Connect Display and Seakeeper-supplied Cable 4 to CAN Tee Adapter with CAN Terminator

6.1.3 Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)

  • Verify coolant level just below filler neck in heat exchanger coolant reservoir.
  • Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump.
  • Verify 2.5 GPM (9.5 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.

6.1.4 Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)

  • Remove lifting bolts and install cover panels
  • Turn on 12 VDC circuit breakers (one for power and one for 12 VDC SW Pump)
  • Turn on 110-230 VAC circuit breaker
  • Verify display works and no ALARMS are present
  • Follow instructions in Installation Manual Section: Start Up Instructions to turn on the Seakeeper
  • Verify seawater pump eventually turns on when the Seakeeper is ON
  • Verify that no ALARMS are present
  • Follow instructions in Installation Manual Section: Start Up Instructions to turn off the Seakeeper
  • AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the Seakeeper in LOCK mode and turning the Seakeeper off
  • Seakeeper takes 4 or more hours to coast down to 0 RPM from full speed

6.2 Required Supplies Needed for Seakeeper Installation

6.2.1 (Not Supplied With the Seakeeper)

ItemDescriptionQtyInstallation Manual Reference SectionOther ReferenceSystem
1Adhesive and cleaning supplies for bonding to hullMechanical InstallationMechanical
2Soundproofing ConsiderationsSelection of Installation LocationMechanical
3Spreader bar for lifting SeakeeperTransport and UnpackingMechanical
4Hose clamps for seawater plumbing to ¾ in. (19 mm) hose barb (2 per hose barb)4Connecting Seawater to Heat ExchangerCooling
5Circuit Breaker, AC, 2-Pole, (30 A to be used with 110-120 VAC, OR Nominal (± 10%), 20 A to be used with 208-230 VAC Nominal (± 10%))1Electrical Equipment Power ConnectionsDwg 90396Electrical
6Circuit Breaker, DC, 1-Pole, 15 A2Electrical Equipment Power ConnectionsDwg 90396Electrical
7M6 terminal lug for grounding Seakeeper at rear brace1Electrical Equipment Ground ConnectionsElectrical
8Cable, 10 AWG, for grounding Seakeeper at rear brace to vessel groundARElectrical Equipment Power ConnectionsDwg 90396Electrical
9Seawater pump, 12 VDC1Electrical Equipment Ground Connections Electrical
10Relay for seawater pump control (Not required if using Seakeeper output 12 VDC pump)1Electrical Equipment Power Connections Electrical

AR = As Required
Dwg = Drawing

6.2.2 List of Common Tools That May Be Required for Installation

ItemDescriptionUse
1Wire cutterDC Power, AC Power cables
2Wire stripperDC Power, AC Power cables
313 mm Socket WrenchCover Panels
4Phillips head screwdriver, 5/64 inchCover Panels
5Slot screwdriver, 5/64 inchField assembly connectors
6¼ in. nut driverHose clamps
7Terminal or quick disconnect crimperPower cables
8Utility knifeScoring cable jackets
910 mm Socket WrenchGround Stud

7.0 Revision History