3.1 Electrical Installation Introduction

This section for electrical installation explains how to mount the electrical equipment and connect the electrical cables.

Reference Documents:


Because of the different motor power requirements between Seakeeper 4 and Seakeeper 4.5, the Motor Power Connections are separated into independent subsections (Sect. 3.2.1 and 3.2.2). The Control Power, Seawater Power, Ground, and ConnectBox connection requirements (Sect. 3.3 through 3.6) are the same for both models.


The following images show the electrical equipment included with the Seakeeper 4 and 4.5 Hardware Scope of Supply (Drawing No. 90737):

12 VDC Power Input Cable,
16.4 ft (5 m), P/N 20248
Seawater Pump Power In,
16.4 ft (5 m), P/N 30327
Seawater Pump Power Out,
16.4 ft (5 m), P/N 20334
NMEA CAN Cable,
19.7 ft (6 m), P/N 30332
M12 D-Code Ethernet Cable,
32.8 ft (10 m), P/N 30330
ConnectBox