Seakeeper 40 Installation Manual (90715-1)

1.0 Introduction

Seakeeper 40

Installation Manual

90715, Revision 1

This document is intended to give details and guidance to a boat builder or equipment installer to install the Seakeeper 40 (40-232-0001 to Current).

Referenced Documents


1.1 PRECAUTIONS

  • The Seakeeper must only be lifted from the supplied lifting eyes shown in Figure 1 (see Section: Transport and Unpacking).
  • The Seakeeper flywheel is supported by precision bearings. DO NOT drop or impart mechanical shock to the Seakeeper assembly when lifting or unpacking, as damage to bearings could result.
  • While handling / installing the Seakeeper assembly, do not allow electrical fittings that exit bottom of the Seakeeper enclosure to come in contact with any surface or object as this could damage the fittings and potentially affect the vacuum integrity of the enclosure.
  • Exercise care to protect the painted finish as damage to finish could lead to early appearance degradation of the installed Seakeeper.
Figure 1 Seakeeper 40

1.1.1 Safety

There is a large torque about the gimbal axis when the Seakeeper is precessing. Seakeeper cover panels are provided to prevent personnel or equipment from contacting the Seakeeper while it is in operation. These covers should not be stepped on or have anything placed on top. The covers should always be in place during operation. The cover side panels contain safety shields as shown below. Do not operate the Seakeeper without these safety shields in place.

If it is ever necessary to access the Seakeeper while the flywheel is spinning, the Seakeeper must be locked at the display to stop the Seakeeper from precessing. Seakeeper regular scheduled maintenance should not be attempted unless the Seakeeper is locked and the flywheel has stopped spinning.

______________________________________________________________________________________________

If it is ever necessary to access the Seakeeper while the flywheel is spinning, the Seakeeper must be locked at the display to stop the Seakeeper from precessing.

__________________________________________________________________________________________________

Stand clear of the Seakeeper and all moving parts when operating.

__________________________________________________________________________________________________

The unit may be started remotely. Assume it could move without warning.

__________________________________________________________________________________________________

The Seakeeper and related structure should be treated with the same respect one gives a high-speed rotating propeller or engine shaft.

__________________________________________________________________________________________________

The following must be true before accessing the Seakeeper for service:
* Input power must be disconnected for at least 10 minutes
* The Seakeeper must be locked (Not in Sea Mode)
* Flywheel must be at zero speed


1.2 TRANSPORT AND UNPACKING

Reference Documents

1.2.1 Transport

  1. Use a Seakeeper provided shipping crate for transport. Overall dimensions of a fully packed crate are
    58 L x 61 W x 53 H in. (1.32 L x 1.35 W x 1.19 H m) with a weight of 4,506 lbs (2,043 kg).
  2. Do not stack Seakeeper shipping crates.
  3. Both Air and Ground transport are acceptable.
  4. Seakeeper shipping crates must be transported in environmental conditions between -4°F and 140°F (-20°C and 60°C).

1.2.2 Unpacking Crate

  1. Reference Seakeeper Drawing No. 12552– Seakeeper 40 Crated Gyro for items that ship with the corresponding Seakeeper model.
  2. Remove electrical components, cables, and misc. items and set aside.
  3. Remove packing materials that secure Seakeeper assembly inside the crate.
  4. Remove top and angled face cover panels to access lifting eyes. Store panels and hardware for reassembly.
  5. Attach spreader bar (P/N 80029) to the two lifting eyes located on the top of the Seakeeper enclosure. Stay clear of any other parts on the Seakeeper. See image below.
  6. The Seakeeper 40 weighs 3,976 lbs (1,803 kg).
Figure 2 – Lifting Arrangement
Seakeeper 40 Spreader Bar – P/N 80029

2.0 Mechanical Installation

2.1 Mechanical Installation Introduction

The Seakeeper can produce loads up to 11,381 lbs (50.6 kN) at each of the four mounts and careful consideration should be given to foundation design to ensure it can transfer these loads into the hull. These loads do NOT include vessel motion accelerations, such as vertical slam loads which can be significant for high speed vessels. The responsible party for designing the supporting structure (boat builder, installer, or hired sub-contractor) must accommodate the above forces plus a reasonable factor of safety. Seakeeper recommends a minimum safety factor of 3.0 (yielding a Safety Margin of 2.0).” The Seakeeper 40 FRB only supports Bolt-In Installation methods.

It is assumed that the installer is familiar with mechanical fasteners to marine structures and has performed structural analysis to assure the structure to which the Seakeeper mounts, can properly transfer the loads the Seakeeper creates into the hull structure. If the installer has any doubt about the ability of the structure to transfer the loads to the hull, then a licensed naval architect or marine engineer should be contacted to do a structural analysis.

The installer should review the following list of reference drawings to ensure the installation procedure is fully understood.


Reference Documents & Drawings:

2.2 Selection of Installation Location

Selection of mounting location of the Seakeeper should consider the following desirable features:

The Seakeeper should be installed aft of amidships to minimize high acceleration loadings due to hull/wave impacts during operation at high speed or in large waves. If the only possible installation location is forward of amidships, then the installer should have Seakeeper review the installation location prior to finalizing the design.


Seakeeper can only assess installation location regarding its impact on Seakeeper operation and serviceability. Seakeeper cannot determine how the installation location will affect the vessel static or directional stability other than cyclic roll reduction. The Installer is responsible for considering the Seakeeper’s effect on the CG location, trim, overall stability, and performance of the vessel.

The Installer is solely responsible for ensuring that the Seakeeper is properly located and installed on the vessel foundation with an adequate margin of safety for the specified design loads and vessel operating characteristics.

Selection of mounting of the Seakeeper should consider the following desirable features:

  • Overhead access or sufficient clearance for removal / re-installation of the Seakeeper for overhaul in future years per Figure 2.
  • The Seakeeper should be installed in a dry space to minimize effects of corrosion.
  • Clearance for replacement of gimbal angle sensor on gimbal shaft (see Figure 2).
  • Clearance for filling / purging brake hydraulic oil (see Figure 2).
  • Clearance for filling water/glycol cooling circuit (see Figure 2).
  • Clearance for replacement of brake hydraulic cylinders (see Figure 2).

VIEWS SHOWING RECOMMENDED CLEARANCES AROUND THE SEAKEEPER FOR USE OF HANDTOOLS, EASE OF MAINTENANCE, INSTALLATION, AND PROPER OPERATION.

Figure 2 Seakeeper 40 Installed Clearance Considerations
6 in. (152 mm) on each side with one side having 28 in. (711 mm)
12.6 in. (320 mm) overhead service clearance


2.2.1 Noise/Soundproofing

Seakeeper noise has been measured under steady state conditions (no wave load) in Seakeeper‘s Engineering Lab. The steady state noise is typically < 73 dBC at 1 meter. As the frequencies emitting the highest sound pressures are low (like other marine machinery), it is recommended that the Seakeeper be installed in a machinery space that is already treated with soundproofing.

2.3 Bolt-In Installation

2.3.1 Preparation of Vessel Structure

Seakeeper provided mounting hardware is intended to apply to typical installation arrangements. However, each installation, especially custom aftermarket foundations, should be thoroughly reviewed to ensure the provided hardware meets the required thread engagement for the Seakeeper unit being installed. The mounting bolt thread engagement requirements are outlined in the Installation Manuals and Installation Details Drawings for each Seakeeper model. This also applies to Seakeeper model adapter kits and OEM built frames where the bolt hole depth should be checked to ensure the bolts will not bottom, preventing the bolts from achieving the intended preload.

When the Seakeeper provided hardware is not appropriate, the bolt specification (diameter and thread pitch) and grade should be matched in the required length and used with the Seakeeper provided washers. Mounting bolts should always be torqued to the Seakeeper specification. All Seakeeper provided bolts are metric course thread. Hardware specifications are also listed in the Installation Manuals and Installation Details Drawings.

Refer to Seakeeper Drawing No. 90714 – Seakeeper 40 Bolt-In Installation Details. Important dimensional and load information is given in this drawing that will impact the design details of the structure that will receive the Seakeeper. It is assumed that a proper structural analysis has been performed for the hull structure to which the Seakeeper will be fastened to ensure proper strength margins for the loads the Seakeeper will create during operation.

The hull structure supporting the Seakeeper should be arranged so the Seakeeper is parallel to the waterline in the forward-aft and port-starboard directions (with up to 2° allowance for trim). In addition, the four areas on top of the beams on which the isolation mounts will rest, need to be co-planar within 0.12 in. (3 mm) to minimize potential distortion of Seakeeper support frame when installed.

Seakeeper provides an installation fixture assembly (P/N 90089), which contains four plates that mimic the mating surfaces of the four isolation mounts located on the Seakeeper’s foundation. These plates have 8 holes located at the same centers as the holes in the isolation mounts. These smaller holes can be used to locate the holes in the ship’s structure through use of a transfer punch or drill. The fixture locates the hole patterns at the proper spacing, both in the fore-aft direction and the port-starboard direction. See Figures 4 & 5 below. Once assembled, the fixture can be used to check clearances and alignment of the hull structure.

Note: Do NOT use the installation fixture to establish Seakeeper envelope dimensions. Refer to Drawing No. 90714 – Seakeeper 40 Bolt-In Installation Details, for envelope dimensions. A 3-D model of the Seakeeper is available on the Seakeeper website (www.seakeeper.com) to aid in designing the Seakeeper foundation and the space around the Seakeeper.

Figure 4 – Exploded View of Installation Fixture, P/N 90089
Figure 5 – Notice for Checking Square of Assembly

CAUTION: Tight clearances from cable guide bands to hull structure. See above figure for dimensions and reference Seakeeper Drawing No. 90714 – Seakeeper 40 Bolt-In Installation Details, for complete envelope.

2.3.2 Transfer of Holes to Boat Structure

  1. Lower assembled fixture onto hull structure.
  2. The four areas where the isolation mounts will rest should be coplanar to within 0.12 in. (3 mm). See figure below. Do not use the fixture to check co-planarity as it is not stiff enough.
  3. Align fixture in desired location and transfer holes from fixture plate to the hull structure. A transfer punch is recommended for this step. Note that holes in fixture plate are ø.257 in. (6.5 mm).
  4. Remove fixture and drill holes in hull structure at marked locations to mate with holes in Seakeeper isolation mounts. A ø.689 in. (17.5 mm) hole is recommended for the provided M16 fasteners.

NOTE: Certain foundation designs that employ threaded blind holes in thick plates may require the installer to obtain alternate fasteners.

2.3.3 Installation of Seakeeper

  1. Locate and position 4 isolation gaskets (P/N 10534) onto foundation beams (for metal to metal contacts only).
    NOTE: A FILM OF SEALANT SHOULD BE APPLIED TO THE GASKET TO KEEP WATER FROM WICKING INTO THE JOINT.
  2. Lower Seakeeper into position onto foundation beams and align over drilled holes.
  3. Install Mounting Bolts:
    1. For Through-Bolt installations (P/N 90086 – Seakeeper 40 Thru-Bolt Kit), install the Seakeeper supplied M16-2.0 fasteners to maintain a minimum of 2 threads protruding past nut. Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 6.
    2. For Blind-Hole installations (P/N 90614 – Seakeeper 40 Bolt-In Kit), install the Seakeeper supplied M16-2.0 fasteners to maintain a minimum thread engagement of 0.95 in. (24 mm). Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 7.
  4. Torque all fasteners to 100 ft-lbs (136 N-m).
    1. New bolts, matching the Seakeeper specification, must be used for each installation and reinstallation that meet the requirements listed above.
  5. Proceed to electrical and cooling portion of the installation.
Figure 6Seakeeper 40 Thru-Bolt Details (Standard)
Figure 7Seakeeper 40 Blind-Hole Details (Optional)

3.0 Electrical Installation

3.1 Electrical Installation Introduction

This section for electrical installation explains how to mount the electrical equipment and how to connect the electrical cables.

Reference Documents & Drawings:


24 VDC Control Power Input Cable, 16.4 ft (5 m),
P/N 20248
Terminator, Female, P/N 30249
Tee Adapter, P/N 30244
Touch Screen Display, P/N 30298
USB Extension Cable,
6.5 ft (2 m), P/N 30300
CAN Cable, 2 ft (0.6 m),
P/N 30301
24 VDC DC SW Pump In,
16.4 ft (5 m), P/N 20248
CAN Cable, 82 ft (25 m),
P/N 30332
24 VDC DC SW Pump Out,
16.4 ft (5 m), P/N 20455

Figure 1 – Electrical Equipment for Seakeeper 40

3.2 Electrical Equipment Power Connections

230 VAC Power Source Requirements

  1. 230 VAC (nominal), 1 Phase, 50/60 Hz, 30 A
  2. With installations of more than one Seakeeper, a dedicated circuit breaker should be used for each Seakeeper Motor Drive Box.

Drive Box AC Power Input Connection Instructions

  1. AC Power Input Cable: 3 x 10 AWG (3 x 6 mm2 CSA), 10 ft (3 m) length, Seakeeper supplied pre-installed.
Figure 2 – Motor Drive VAC Input & Drive Power Output Cable Glands
Figure 3 – AC Power Input Cable Wire Connections at AC Power Distribution Panel
  1. For Seakeeper 40, connect 230 VAC wires in AC Input Cable to a 30 A, double-pole Circuit Breaker at an AC power distribution panel according to Figure 3 above.

24 VDC Power Input

  1. One 24 VDC, 15 A (Customer supplied breaker) for Seakeeper Control Power, AND
  2. One 24 VDC, 20 A (Customer supplied breaker) for DC Seawater Pump.
  3. A dedicated breaker breaker should be used for each Seakeeper control power and DC Seawater Pump source.

DC Power Connection Instructions

Reversing polarity on the DC power input to the Seakeeper can result in damaging the electronics in the control system.

  1. 24 VDC, 2 x 12 AWG (3 x 4 mm2 CSA) Seakeeper supplied.
    1. Install Seakeeper provided DC Power Input Cable (P/N 20248),
      as shown in Drawing No. 90710 – Seakeeper 40 Cable Block Diagram.
      1. Route DC Power Input Cable to DC Power Distribution Panel.
      2. Terminate positive (B+, Red) conductor through dedicated over-current protection device (customer supplied) and a dedicated Seakeeper isolation switch (customer supplied) then directly to battery plus terminal.
      3. Terminate negative (B-, Black) conductor directly to battery negative terminal or negative bus.
    2. Before connecting DC Input Cable to Seakeeper, check for proper voltage and polarity with a DC multimeter using Figure 4 below.
    3. Connect DC Input Cable to 24 VDC input receptacle on Seakeeper.
Figure 4 – DC Power Input Connector Contact Assignments (front)

When energizing DC power for the first time, if Display does not power up immediately then disconnect and inspect connector polarity.


DC Seawater Pump 24 VDC Power Input Connection Instructions

Connecting the DC Seawater Pump in any other manner than recommended by Seakeeper may cause internal failure.

  1. Install Seawater Pump Input Cable (P/N 20248) to overcurrent protection corresponding to Seawater Pump selected as follows:
    1. Connect the 12 AWG positive conductor (Red) through dedicated overcurrent protection device (Customer supplied), maximum of 20 A, to dedicated battery isolation switch.
    2. Connect 12 AWG negative conductor (Black) directly to battery negative terminal or DC main negative bus bar.
  2. Before connecting Seawater Pump Input Cable to Seakeeper, check for proper voltage and polarity with a DC multimeter using Figure 5 below.
Figure 5 – 24 VDC Seawater Pump Power Input
  1. Connect Seawater Pump Input Cable to “SW Pump 24 VDC In” connector on the Seakeeper.

DC Seawater Pump 24 VDC Power Output Connection Instructions

  1. Connect Seawater Pump Output Cable (P/N 20594) to the Seakeeper 40 “SW Pump 24 VDC Out” for DC power output to the Seawater Pump.
    1. Seawater Pump Output Cable is a 2 x 12 AWG cable, 16 ft (5 m) length, with a size 12 female Deutsch plug.
    2. Cable P/N 20594 has two ring terminals for connection to DC Seawater Pump P/N 30529. A cable option exists for attaching a Deutsch connector (as shown below). See 90710 notes for details.
  2. Customer-supplied pumps rated at 24 VDC, 20 A maximum, customer supplied, must be configured with a Deutsch DTP-04 series, 2-pin male receptacle (Figure 6) to mate with the Seawater Pump Output Cable female connector.
Figure 6 – SW Pump Connector
(DTP04-2P)
  1. Seawater Pump Output Cable must be routed and installed in the vessel from the Seakeeper 40 “SW Pump 24 VDC Out” Deutsch connector to the DC Seawater Pump cable.
Figure 7 – Seawater Pump Output Cable Details

Display, CAN Cable, & USB Extender Cable Connection Instructions

  1. 5″ Touch Display Mounting Instructions, Surface Mount
    1. Console space required: Approx. 5.24 W x 3.750 H in. (133 x 94 mm)
    2. Mounting Instructions, Surface Mount: See Drawing No. 90438 – 5″ Operator Display Envelope and Mounting Details, for dimensions and template.
  2. CAN Communications Tee Adapter and Terminator Mounting Instructions
    1. Console space required, Rear: Approx. 4 W x 3 H in. (102 x 76 mm)
    2. Mounting Instructions: Rear mount on vessel control panel, within 1 ft (.3 m) of Display/
    3. Hardware required: One mounting screw for 0.197 in. (5 mm) diameter mounting hole on Tee Adapter.
  3. USB Extension Cable Assembly Mounting Instructions
    1. Console space required: Approx. 2 W x 2 H in. (51 x 51 mm), within 5 ft (1.5 m) from Touch Display.
    2. Mounting instructions, Surface Mount: Use panel cutout as shown in Drawing No. 90438 – 5″ Touch Display Envelope and Mounting Details. Maximum panel thickness 1/8 in. (3.2 mm),
    3. Install sealed USB connector end of the extender cable assembly in panel from rear and secure with hex jam nut (provided) on front.
    4. Connect M12 connector end of extender cable assembly to the rear of the Touch Display on receptacle AUX.

3.3 Electrical Equipment Ground Connections

Seakeeper to Vessel Ground Connection Instructions

  1. Connect the Seakeeper foundation to vessel ground.
    1. Install Ground Cable (10 AWG or 6.0 mm2, Customer supplied) from the M6 brass ground stud on the Seakeeper rear foundation to a suitable vessel ground. The ground cable should be installed on the inside rear of the foundation as shown below. If possible, install the ground cable prior to installing the Seakeeper into the vessel. If there is no access to the ground stud from below the rear of the Seakeeper once installed, the rear cover, upper rear cover, and ECM bracket will need to be removed to access the ground stud from above the Seakeeper.
Figure 8 – Seakeeper Ground Stud on Inside Rear Foundation (View from below Seakeeper)

3.4 Operator Station

This section explains the connection between the Operator Station equipment and the Seakeeper.

Reference Documents & Drawings


3.4.1 Determine Location of Operator Station

  1. The desired location of the Operator Station must be determined with respect to the vessel arrangement.
  2. The operator display should be located on the bridge console.
  3. Figure 9 below shows the CAN bus communications link for the Operator Station. The Terminator goes on the far end of the Tee Adapter from the Seakeeper.
Figure 9 – Serial Communications Link for Operator Station

3.4.2 Route Serial Communications Cable

  1. The CAN Cable Assembly (P/N 30332) is a 82 FT (25 m) shielded cable and the largest connector is a molded plug with maximum outer diameter of .58 in. (14.8 mm).
  2. The CAN Cable Assembly must be routed and installed in the vessel from the Seakeeper (female end) to the Tee Adapter (male end) at the Operator Station.

3.4.3 Install Operator Station Equipment

  1. The Operator Station equipment is installed at the selected location using instructions found in Section: Electrical Equipment Power Connections.

3.4.4 Connect Operator Station Equipment

  1. The Operator Station equipment is electrically connected in accordance with Drawing No. 90710 – Seakeeper 40 Cable Block Diagram.

3.4.5 Optional 2nd Operator Station

  1. The desired location of the 2nd Operator Station must be determined with respect to the 1st Operator Station and the vessel arrangement.
  2. Typical locations include:
    1. Flybridge
    2. Engine room

Determine Cabling Arrangement

  1. Figure 10 shows the entire serial communications link for the optional 2nd Operator Station. The Terminator must be installed on the Tee Adapter farthest from the Seakeeper.
Figure 10 – Cabling for two Operator Stations
  1. The Operator Station nearest the Seakeeper should be connected to the CAN Cable Assembly.

Route 2nd Operator Station Cable

  1. A second CAN Cable Assembly (P/N 30332), also a 25 m shielded cable, and the largest connector is a molded plug with maximum outer diameter of .58 in. (14.8 mm).
  2. The additional CAN Cable Assembly must be routed in the vessel from the 1st Operator Station (female end) to the 2nd (male end) Operator Station.

Install 2nd Operator Station

  1. The 2nd Operator Station equipment is installed at the determined location using instructions found in Section: Electrical Equipment Mounting.

Connect 2nd Operator Station Equipment

  1. The 2nd Operator Station equipment is connected in accordance with Figure 10 and Drawing No. 90467 – Helm Display 2nd Operator Station.

3.5 Multifunction Display (MFD) Connection

Reference Documents


  1. The Seakeeper can be connected to a variety of available MFD systems. Refer to the Technical Bulletins Section of the Seakeeper Technical Library for manufacturer specific MFD compatibility technical bulletins.
    1. MFD specific Technical Bulletins will be updated regularly as new MFD systems become compatible. Currently GARMIN, RAYMARINE, SIMRAD, and FURUNO offer compatible MFD models.
    2. Once a compatible MFD has been selected, refer to the appropriate manufacturer specific Technical Bulletin for integration instructions.
  2. Connect Ethernet D-Code Adapter Cable 32.8 ft (10 m) cable, (P/N 30330), to MFD manufacturer-specific Ethernet adapter cable. Custom Ethernet cables for specific MFD manufacturers are available through Seakeeper and must be purchased if connecting to an MFD. Connect the Ethernet D-Code Adapter Cable according to Figure 11. The ethernet port on the back of the display is shown in Figure 12.
Figure 11 – Cabling for MFD
Figure 12 – Ethernet Port on Operator Station (circled in red)

4.0 Cooling Installation

4.1 Cooling Installation Introduction

The Seakeeper 40 is shipped with the cooling circuit filled and ready for use. Only a quick confirmation of glycol level is required.

Reference Documents

Figure 1 – Seakeeper 40 Cooling Components

4.2 Installation Considerations

  1. Installer is responsible for supplying a dedicated seawater pump and associated plumbing. Seawater connections on the heat exchanger mate with 1 in. (25.4 mm) hose. An optional seawater pump can be purchased through Seakeeper (P/N 30490).
  2. There is no need to disconnect hose from glycol pump except to replace the pump. In this case, provision will need to be made to catch draining glycol as plumbing is disconnected. Use caution to avoid breaking plastic hose connections on pump casing.
  3. An output is available from the Seakeeper 40 wire harness to power and automatically control seawater pump. This pump must operate on 24 VDC and consume less than 20 A. Pumps requiring other voltages or higher current can still be controlled by using this supply from the wire harness to trigger an installer-supplied contactor, but a separate source of power must be provided.
  4. The seawater pump is powered by Seawater Pump Output Cable, via “SW Pump 24 VDC Out” on the Seakeeper 40, as outlined in Electrical Installation section.
  5. A dedicated through-hull fitting should be installed for each Seakeeper unit onboard the vessel to ensure sufficient seawater flow to each unit.
  6. It is recommended the seawater pump be installed below the waterline, as close to baseline of the vessel as practically possible, to maintain positive inlet pressure on the pump in all operating conditions.
  7. A self-priming seawater pump may be required to maintain water flow in all underway conditions. Cavitation can occur at the seawater inlet and potentially cause an air-lock condition restricting seawater flow to the heat exchanger.
  8. Maximum seawater pressure in heat exchanger is 20 psi (1.4 bar).
  9. Seawater flow requirement through heat exchanger is 13 GPM (49 LPM) minimum and 15 GPM (57 LPM) maximum under all operating conditions of the boat. When sizing seawater pump, installer should factor in losses for raw water plumbing. In addition to initial operation at dock, new Seakeeper installations should be checked to be within the flow requirements while vessel is at speed. Flows higher than 15 GPM (57 LPM) could affect heat exchanger life.
  10. Vented loops (shown in Figure 3) are optional and should only be considered with centrifugal style pumps. Self-priming or positive displacement style pumps do not require a vented loop, including Seakeeper supplied optional pump (P/N 30490).
Figure 2 – Seakeeper 40 Cooling Components
Figure 3Seakeeper 40 Typical Seawater Plumbing Arrangement

4.3 Connecting Seawater to Heat Exchanger

4.3.1 Connecting Seawater Pump to Heat Exchanger

  1. Connect seawater from installer-supplied pump to lower 1 in. (25.4 mm) hose barb on heat exchanger. Use the same practices as other below waterline seawater plumbing. Required flow rate is 13 GPM (49 LPM) minimum and 15 GPM (57 LPM) maximum.
  2. Connect seawater discharge (upper hose barb) to overboard drain. Use the same practices as typical below waterline seawater plumbing.
  3. In addition to initial operation at dock, new installations should be checked with a flow meter for minimum 13 GPM (49 LPM) and maximum of 15 GPM (56.8 LPM) flow under all normal operating conditions.
    1. If no other method of confirming flow is available, discharge line may be temporarily diverted to a bucket. Flow is calculated from time to fill a known volume.
    2. A self-priming seawater pump (customer/installer supplied) may be required due to installation location to maintain water flow in all underway conditions where cavitation near the intake may occur and potentially cause an air-lock condition restricting seawater flow to the heat exchanger.
  4. Inspect raw water plumbing after sea trial for any signs of leakage.
  5. Heat exchanger contains removable end-caps to provide access for cleaning the tube bundle.
Figure 4 – Seakeeper 40 Seawater Connections and Cooling Components

4.3.2 Seakeeper Optional DC Seawater Pump (P/N 30529)

  1. Seakeeper offers a self-priming DC Seawater Pump as an optional addition, P/N 30529 – 24 VDC Seawater Pump, shown in Figure 5.
  2. Pump fittings are 3/4 in. NPT. To connect to Seakeeper 40 heat exchanger, a 3/4 to 1 in. barbed adapter will be necessary. DO NOT use bronze or brass fittings on the optional DC Seawater Pump. Use pipe sealant on the threads and other connections.
  3. The base does not require direct mounting if one of the pipe flanges is rigid mounted. Do not rigid mount both the flanges and the base to avoid mounting tolerances that may distort the motor base. Install the pump with the shaft in a horizontal direction. NEVER install the pump vertical with the motor below the pump.
  4. Figure 5 provides a mounting hole dimensions for mounting the DC Seawater Pump.
  5. The pump assembly is pre-wired for connection to the Seakeeper 40 wire harness through Cable 5. The pump specifications are as follows:
Voltage24 VDC
Overcurrent Protection Rating20 A
Suction Lift26 FT
Flow Rate23 GPM with 10 FT suction head
Ignition ProtectionISO 8846 or equivalent
Figure 5 – 24 VDC SW Pump P/N 30529

4.4 Adding Coolant

  1. Cooling system is filled to proper level when shipped, with a mixture of 50% ethylene glycol and 50% distilled water. The clear tube between the thermostat housing and reservoir should be filled with green coolant mixture. If level has dropped, check for evidence of leaks at all connections before adding fluid as described below. If coolant is at the correct level, skip to Section: Connecting Seawater to Heat Exchanger.
Figure 6 – Seakeeper 40 Coolant Level
  1. Mix 50% ethylene glycol with 50% distilled water in a clean container. Refer to Table 1 or glycol manufacturer’s literature for freezing points.
  1. Remove pressure cap on top of reservoir. Pour mixture in until level is 1 – 2 inches from top of reservoir as shown in Figure 3 and 6. Filling reservoir above this level will not cause any damage but coolant may be expelled from pressure relief port below cap due to normal thermal expansion of coolant.
  2. Connect 24 V to controller.
    1. At the Display check for any ALARMS

    2. Press the POWER ON/OFF button.
    3. The flywheel will start to spin and the glycol pump will start.
    4. Recheck glycol level with fluid circulating in coolant circuit. Sight down inside reservoir and check that coolant level is above upper port on reservoir as shown in Figure 6. Replace cap.
    5. After several minutes of running, press POWER ON/OFF button to turn power off to the flywheel and glycol pump.
  3. The cooling system is self-purging. If small amounts of air are in the system, they will most likely be dislodged during the first sea trial. Re-check level after sea trial and add fluid if required.

5.0 Installation Requirements

5.1 Installation Requirements Introduction

The Installation Requirements section outlines the components and tools needed for the Seakeeper 40 Installation that are not included within the scope of supply.

5.2 Required Supplies for Seakeeper Installation

Required Supplies Needed for Seakeeper Installation
(Not Supplied With the Seakeeper)

ItemDescriptionQtyInstallation Manual Reference SectionOther ReferenceSystem
1Adhesive and cleaning supplies for bonding to hullMechanical InstallationMechanical
2Soundproofing ConsiderationsSelection of Installation LocationMechanical
3Spreader bar for lifting Seakeeper1Transport and UnpackingP/N 80029Mechanical
4Hose clamps for seawater plumbing to 1 in. (25.4 mm) hose barb (2 per hose barb)4Connecting Seawater to Heat ExchangerCooling
53/4″ to 1″ Hose Adapter1Connecting Seawater to Heat ExchangerCooling
6Circuit Breaker, AC, 2-Pole, 20 A1Electrical Equipment Power ConnectionsDwg 90710Electrical
7Circuit Breaker, DC, 1-Pole,
15 A for control power
1Electrical Equipment Power ConnectionsDwg 90710Electrical
8Circuit Breaker, DC, 1-Pole,
20 A for seawater pump
1Electrical Equipment Power Connections Dwg 90710Electrical
9M6 terminal lug for grounding Seakeeper at rear of foundation1Electrical Equipment Ground ConnectionsElectrical
10Cable, 10 AWG, for grounding Seakeeper at rear brace to vessel ground ARElectrical Equipment Ground Connections Dwg 90710Electrical
11Seawater pump, 24 VDC1Electrical Equipment Power Connections P/N 30490 availableElectrical
12Relay for seawater pump control (Optional)1Electrical Equipment Power Connections Electrical
13Sili-Thane 803 Sealant (or equivalent)ARMechanical InstallationMechanical
14Nickel-based Anti-SeizeARMechanical InstallationMechanical

AR = As Required
Dwg = Drawing

5.3 Tools Required for Installation

List of Common Tools That May Be Required for Installation

ItemDescriptionUse
1Wire cutterDC Power, AC Power cables
2Wire stripperDC Power, AC Power cables
3Phillips head screwdriverCover Panels
413 mm Socket WrenchCover Panels
53 mm hex keyGimbal sensor mount plate
62.5 mm hex keyGimbal angle sensor
7¼ in. nut driver/flat tip screwdriverHose clamps
8Terminal or quick disconnect crimperPower cables
9Utility knifeScoring cable jackets
1010 mm Socket WrenchGround stud & panels
11Hoist, Forklift, or CraneUnpacking and lifting Seakeeper into position
12Drill/Drill PressBolt hole penetrations
13Threaded Insert Installation Kit (Blind Hole Installation only)Tap and install threaded inserts for M16-2.0. 1-inch length
141/2 in. Drive Torque WrenchFoundation fastener torqueing
1524 mm Socket, 1/2 in. driveFoundation mounting screws
16Fish tapeCable pulls
17Hole SawThrough-hull fittings

6.0 Installation and Start Up Checklist

6.1 Installation and Start Up Introduction

Reference Documents:

The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of the
Seakeeper 40 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist Work Instruction (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the Seakeeper Commissioning Form (90437).

All Seakeeper stabilizers should be commissioned to verify installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Seakeeper
Commissioning Form (90437), all the items in the Installation Checklist, and verification of Seakeeper 40 operation without alarms or abnormal behavior.

6.2 Installation Checklist

Please Complete Checklist and E-mail to customerservice@seakeeper.com.

6.2.1 Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)

  • Seakeeper foundation installed in hull
  • Foundation bolts torqued to specification

6.2.2 Electrical Checklist
(Reference Seakeeper Drawing No. 90710 – Seakeeper 40 Cable Block Diagram & Installation Manual Section: Electrical Installation)

Mount Components

  • Display (near helm)

Connect Customer Supplied Cables

  • Ground Cable (Customer Supplied)
    • Install lugs on both ends of customer-supplied 10 AWG ground cable
    • Connect one end of Ground Cable to nearest vessel ground and other end to Seakeeper foundation frame

Connect Seakeeper Supplied Cables

  • DC Input Power Cable (Seakeeper supplied)
    • Connect the DC Input Power Cable from Seakeeper to 24 VDC power at customer-supplied connection box or directly to circuit breaker
    • Plug connector of DC Input Power Cable into mating connector on Seakeeper wire harness
  • AC Power Input Cable (Seakeeper Supplied)
    • Connect the AC Power Input Cable from Drive Box to 230 VAC single phase at customer-supplied connection box or directly to circuit breaker
  • CAN Communication Assemblyt (Seakeeper Supplied)
    • Connect female end of CAN communications Cable to mating connector on Seakeeper wire harness
    • Route CAN communications Cable from Seakeeper to helm (male end goes to helm)
    • Connect male end of CAN communications Cable at helm to CAN Tee Adapter
    • Connect Display and Seakeeper-supplied 24 in. (0.6 m) cable to CAN Tee Adapter with CAN Terminator
  • Seawater Pump Power Output Cable (Seakeeper Supplied)
    • Connect Seawater Pump Power Output Cable from Seakeeper wire harness to customer-supplied 24 VDC seawater pump
  • Seawater Pump Power Input Cable (Seakeeper supplied)
    • Connect the Seawater Pump Power Input Cable from Seakeeper DC SW Pump In to 24 VDC power at customer supplied connection box or directly to circuit breaker

6.2.3 Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)

  • Verify coolant level in heat exchanger coolant reservoir.
  • Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump.
  • Verify 13 GPM (49 LPM) minimum and 15 GPM (57 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.

6.3 Start Up Checklist

(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)

  • Remove lifting eyes, install sealing fasteners in lifting holes, and install cover panels
  • Turn on 24 VDC circuit breakers for control power and DC Seawater Pump
  • Turn on 230 VAC circuit breaker
  • Verify display works and no ALARMS are present
    • If display does not work, turn off both circuit breakers immediately.
    • Check polarity of 24 VDC power per Section: Electrical Equipment Power Connections – DC Power and Seawater Pump Connection Instructions.
  • Follow instructions in Operations Manual Section: Start Up Instructions to turn on the Seakeeper
  • Verify that no ALARMS are present
  • Follow instructions in Section: Start Up Instructions to turn off the Seakeeper
  • AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the Seakeeper in LOCK mode and turning the Seakeeper off.
  • Seakeeper 40 takes 5+ hours to coast down to 0 RPM from full speed

7.0 Revision History

RevisionDescriptionDate
1Initial release09SEP2023