5.3 Tools Required for Installation

Table 2 outlines the tools and equipment required for the Seakeeper 3 installation:

Table 2: Tools Required for Installation

ItemDescriptionUse
1Hoist, Forklift, or CraneUnpacking and lifting Seakeeper 3 into position
2Transfer Punch KitLocate foundation hole penetrations
3Drill / Drill PressBolt hole penetrations
4Threaded Insert Installation KitTap and install threaded inserts (M14-2 X 1.5)
51/2″ Drive Torque WrenchFoundation Bolts (155 ft-lbs/210 Nm)
612 – 18″ Extension, 1/2″ DriveFoundation Bolts
724mm Socket, 1/2″ DriveFoundation Bolts
8Utility KnifeScoring Cable Jackets
9Wire cutterDC Power cables
10Wire stripperDC Power cables
11Greenlee K05-Synchro Crimp Tool or equivalent12 VDC High-Current Input Cables, 2AWG Ground Cable, 4 AWG
12Heat GunFor cables 1, 2, and 6 heat shrink
13¼ in. (7mm) Nut Driver / Flat Head ScrewdriverHose clamps
14Fish TapeCable Pulls
15Hole SawThru-hull fittings

NOTE: Additional tools may be required for the installation of customer supplied components.