6.3 Start-Up Checklist

Refer to Seakeeper 3 Operation Manual, Startup Section for detailed start-up instructions.

Prior to beginning the start-up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete. Before continuing, the Seakeeper 3 cover must be installed, and the operating clearances must be clear of personnel and equipment

CHECKREQUIREMENT TO BE MET
Remove lifting eyebolts and install sealing bolts and washers into lifting eyeholes and install cover.
Energize battery isolation switch, high-current 110 A breaker, low-current 15 A breaker, and seawater pump breaker.
Verify Seakeeper display is active and no alarms present.

* If the Seakeeper 3 display does not activate, turn off all circuit breakers immediately and check all wiring connections.
Check that battery voltage exceeds 12 VDC. A minimum battery voltage of11.2 VDC is required for the duration of Seakeeper spool-up.
Override seawater pump “ON” (at 0 RPM hold down SERVICE button (wrench icon) for 5 seconds) and verify flow at seawater outlet.
Press Seakeeper ON/OFF Button and follow instructions in Seakeeper 3 Operation Manual, Section 2 for complete start-up instructions.
Verify no alarms are present.
Power Seakeeper 3 down, the Seakeeper 3 flywheel will take 2+ hours to coast down to 0 RPM.