Seakeeper 18 Installation Manual (90672-2); S/N 18-234-2475 to Current
6.3 Start Up Checklist
Startup Checklist (reference Installation Manual Section 4 & Operation Manual Sec. 2)
CHECK | ACTION |
Remove lifting eye-bolts and install cover panels | |
Turn on Seakeeper, 24 VDC circuit breaker | |
Turn on Seawater pump, 24 VDC circuit breaker | |
Turn on 230 VAC circuit breaker | |
Verify MFD app / 5″ touch display works and no ALARMS are present | |
Follow instructions in Operation Manual to turn on the Seakeeper | |
Verify seawater pump turns on while the Seakeeper is turned ON (It will run only as needed) | |
Verify that no ALARMS are present | |
Follow instruction in Section 4.1 of Installation Manual to turn off the Seakeeper | |
The Seakeeper is powered off by switching off the AC & DC power and seawater pump. The Seakeeper will automatically be in LOCK mode once the system is turned off | |
Seakeeper 18 takes 4.5+ hours to coast down to 0 RPM from full speed |