Seakeeper 18 Installation Manual (90672-2); S/N 18-234-2475 to Current
6.3 Start Up Checklist
Startup Checklist (reference Installation Manual Section 4 & Operation Manual Sec. 2)
CHECK | ACTION |
![]() | Remove lifting eye-bolts and install cover panels |
![]() | Turn on Seakeeper, 24 VDC circuit breaker |
![]() | Turn on Seawater pump, 24 VDC circuit breaker |
![]() | Turn on 230 VAC circuit breaker |
![]() | Verify MFD app / 5″ touch display works and no ALARMS are present |
![]() | Follow instructions in Operation Manual to turn on the Seakeeper |
![]() | Verify seawater pump turns on while the Seakeeper is turned ON (It will run only as needed) |
![]() | Verify that no ALARMS are present |
![]() | Follow instruction in Section 4.1 of Installation Manual to turn off the Seakeeper |
![]() | The Seakeeper is powered off by switching off the AC & DC power and seawater pump. The Seakeeper will automatically be in LOCK mode once the system is turned off |
![]() | Seakeeper 18 takes 4.5+ hours to coast down to 0 RPM from full speed |