6.0 Installation and Start Up Checklist

6.1 Checklists Introduction

This section describes the first startup of the Seakeeper.

Reference Documents & Drawings:


  • Previous sections for mechanical, electrical and cooling installation must be completed before this startup sequence is initiated.
  • Before continuing, covers must be installed unless the Seakeeper is inaccessible and there is no risk to injury. Also, the area around the Seakeeper must be clear of personnel and equipment.

The Installation and Start Up Checklist section provides an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of the
Seakeeper 9 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist Work Instruction (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the Seakeeper
Commissioning Form (90437).

All Seakeeper stabilizers should be commissioned to verify installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Seakeeper
Commissioning Form (90437), all the items in the Installation Checklist, and verification of Seakeeper operation without alarms or abnormal behavior.

6.2 Installation Checklist

Please Complete Checklist and E-mail to
customerservice@seakeeper.com or telefax to +1.410.326.1199

5.1.1 Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)

_____ Seakeeper foundation installed in hull

_____ Foundation bolts torqued to specification


5.1.2 Electrical Checklist
(Reference Seakeeper Drawing No. 90257 – Seakeeper 9 Cable Block Diagram & Installation Manual Section: Electrical Installation)

Mount Components

_____ Display (near helm)


Connect Customer Supplied Cables

Seakeeper Ground Cable (Customer supplied)

_____ Install lugs on both ends of customer-supplied 10 AWG (6 mm2) ground cable

_____ Connect one end of ground cable to nearest vessel ground and other end to Seakeeper 9 rear
brace

Connect Seakeeper Supplied Cables

Control Power Cable

_____ Connect control power cable from Seakeeper to 24 VDC power at customer-supplied connection
box or directly to circuit breaker

_____ Plug connector of control power cable into mating connector on Seakeeper wire harness

AC Input Cable

_____ Connect AC input cable from Drive Box to 230 VAC single phase at customer-supplied connection
box or directly to circuit breaker

DC Seawater Pump Power Cable

_____ Connect DC seawater pump power input cable from Seakeeper to 24 VDC /10 A power at customer-
supplied connection box or directly to circuit breaker

_____ Plug connector of DC seawater pump power cable into mating connector on Seakeeper wire
harness at DC SW Pump In

DC Seawater Pump Output Cable

_____ Connect seawater pump output cable from DC SW Pump Out to 24 VDC seawater pump

MFD Ethernet Adapter Cable

_____ Connect male end of ethernet adapter cable to Ethernet connection on ConnectBox

_____ Route ethernet adapter cable to selected MFD compatibility cable towards helm

_____ Connect female end of ethernet adapter cable to MFD compatibility cable

_____ Connect MFD compatibility cable to MFD Display

OPTIONAL Seakeeper 5″ Display CAN Cable

_____ Connect female end of CAN communication cable to tee-adapter at ConnectBox
(at tee-adapter terminal resistor)

_____ Route CAN communication cable to Seakeeper 5″ display

_____ Connect male end of CAN communication cable to tee-adapter with terminal resistor at 5″ display


5.1.3 Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)

_____ Verify coolant level in coolant reservoir

_____ Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump

_____ Verify 4 GPM (15 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat
heat exchanger under all operating conditions of the boat


5.1.4 Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)

_____ Remove lifting eyebolts and install cover panels

_____ Turn on 24 VDC circuit breakers

_____ Turn on 230 VAC circuit breaker

_____ Verify display works and no ALARMS are present

_____ If display does not work, turn off both circuit breakers immediately

_____ Check polarity of 24 VDC power per Section 3.4

_____ Follow instructions in Installation Manual Section: Start Up Instructions to turn on the Seakeeper

_____ Verify seawater pump turns on while the Seakeeper is turned ON

_____ Verify no ALARMS are present

_____ Follow instructions in Installation Manual Section: Startup Instructions to turn off the Seakeeper

_____ AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the
Seakeeper in LOCK mode and turning the Seakeeper off

_____ Seakeeper 9 takes 4+ hours to coast down to 0 RPM from full speed

6.3 Start Up Checklist

Refer to Seakeeper 9 Operation Manual for detailed start up instructions.


Prior to beginning the start up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete.

Before continuing, the Seakeeper cover must be installed and the operating clearances must be clear of personnel and equipment.

CHECKREQUIREMENT TO BE MET
Remove lifting eyebolts and install sealing bolts and flat washers into lifting eyeholes and install top cover panels.
Supply 230 VAC to Motor Drive Box at customer-supplied electrical disconnect.
Energize control power and seawater pump breaker.
Verify ConnectBox and MFD / 5″ Touch Display is active and no alarms present.
Override seawater pump β€œON” for 5 seconds) and verify flow at seawater outlet.
(To activate override, at 0 RPM flywheel speed, hold down SERVICE button wrench icon for 5 seconds to reveal override screen)
Deactivate seawater pump when completed obtaining seawater flow rate.
Press Seakeeper ON/OFF Button and follow instructions in Seakeeper Operation Manual for complete start-up instructions.
Verify no alarms are present.
Power Seakeeper down, the Seakeeper flywheel will take 4+ hours to coast down
to 0 RPM.