Seakeeper 9 Installation Manual (90222-11); S/N 9-233-4900 to Current
7.0 Revision History
REVISION | DESCRIPTION | DATE |
1 | Initial release | 21APR2014 |
2 | Added isolation gaskets, removed PN 90264 (insert plate), added detail on drilling/tapping | 09OCT2014 |
3 | Minor edits | 09FEB2015 |
4 | Adhesive tip clamp removed, removed Plexus instructions, removed flush mount display instructions, display template change | 06MAR2015 |
5 | Saddle surface bonding area changed, reinserted plexus details, minor edits throughout | 01JUN2015 |
6 | Added 7HD, removed word gyro from body, Fixture plate changed (hole dia.), Plexus alternative offered, minor edits throughout | 26JAN2017 |
7 | Removed Plexus details, 5″ Touch screen intro | 20OCT2017 |
8 | Minor edits, replaced images of Pan World glycol pump | 02JUL2021 |
9 | Updated address, added installation dwg references, clearance changes, thru-bolt added | 24SEP2021 |
10 | Added updated cooling system. Deleted 7HD model. Added FRB changes. Minor edits throughout document. | 08MAR2023 |
11 | Added ConnectBox user interface. Removed 5″ Touch Display from Bill of Materials. Minor format edits throughout manual. Added crate stacking recommendations. | 25SEP2023 |