Seakeeper 7.5 Installation Manual (90992-1)
6.2 Installation Checklist
Please Complete Checklist and E-mail to support@seakeeper.com or emeasupport@seakeeper.com.
Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)
- Seakeeper foundation installed in hull
- Foundation bolts torqued to specification
Electrical Checklist
(Reference Seakeeper Drawing No. 90951 – Seakeeper 7.5 Cable Block Diagram & Installation Manual Section: Electrical Installation)
Mount Components
- Display (near helm)
Connect Customer Supplied Cables
- Seakeeper Ground Cable (Customer Supplied)
- Install lugs on both ends of customer-supplied 10 AWG ground cable
- Connect one end of Cable 3 to nearest vessel ground and other end to Seakeeper rear brace
Connect Seakeeper Supplied Cables
- DC Control Power Input Cable (Seakeeper Supplied)
- Connect other end of cable to 12 VDC power at customer-supplied connection box or directly to circuit breaker
- Plug connector of cable into mating connector on Seakeeper wire harness
- DC Seawater Pump Input Cable (Seakeeper Supplied)
- Connect cable from SW PUMP VDC IN directly to circuit breaker
- DC Seawater Pump Output Cable and Y-Branch SW Pump & Valve Cable (Seakeeper Supplied)
- Connect cable from SW PUMP VDC OUT to Y-Branch SW Pump Output & Valve Cable.
- Connect customer-supplied DC seawater pump to Y-Branch SW Pump Output & Valve Cable.
- Connect inline fuse connector to DTM Deutsch connector and the electric ball valve to the inline fuse connector.
- Ethernet Cable (Seakeeper Supplied)
- Connect end of cable to mating connector on Seakeeper ConnectBox.
- Route Ethernet cable from Seakeeper to helm.
- Connect appropriate MFD-specific cable to end of Ethernet cable from ConnectBox.
- Connect Ethernet MFD-specific cable into compatible MFD or Ethernet bus.
- NMEA 2000 drop cable (Seakeeper Supplied)
- Attach NMEA 2000 drop cable to appropriate connector in ConnectBox.
- Connect other end of NMEA 2000 drop cable into NMEA backbone.
Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)
- Verify glycol coolant level just below filler neck in heat exchanger coolant reservoir.
- Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump.
- Verify 4.5 GPM (17 LPM) minimum and 6 GPM (22.7 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.
Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)
- Remove lifting bolts and install cover panels
- Turn on 12 VDC circuit breakers (one for control power and one for 12 VDC SW Pump)
- Turn on 110 or 230 VAC circuit breaker
- Verify display works and no ALARMS are present
- Follow instructions in Installation Manual Section: Start Up Instructions to turn on the Seakeeper
- Verify seawater pump eventually turns on when the Seakeeper is ON
- Verify that no ALARMS are present
- Follow instructions in Installation Manual Section: Start Up Instructions to turn off the Seakeeper
- AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the Seakeeper in LOCK mode and turning the Seakeeper off
- Seakeeper may take 4 or more hours to coast down to 0 RPM from full speed