3.1 Electrical Installation Introduction

This section for electrical installation explains how to mount the electrical equipment and how to connect the electrical cables.

Reference Documents & Drawings:


12 VDC Power Connector,
16.4 ft (5 m), P/N 20248
M12 D-Code Ethernet Cable
33 ft (10 m), P/N 30330
ConnectBox User Interface (Installed on Seakeeper),
P/N 20415
NMEA CAN Cable,
19.7 ft (6 m), P/N 30332
DC Seawater Pump Power Out,
16.4 ft (5 m), P/N 20455
DC Seawater Pump Power In,
16.4 ft (5 m), P/N 20454

Figure 16 – Electrical Equipment for Seakeeper 7.5