6.1 Installation and Start Up Checklist Introduction

Reference Documents:

The Installation and Start Up Checklist section provides an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of the
Seakeeper 5 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). Commissioning forms may be submitted electronically to commissioning@seakeeper.com.

All Seakeeper stabilizers should be commissioned to verify installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Seakeeper
Commissioning Form (90437), all the items in the Installation Checklist, and verification of Seakeeper operation without alarms or abnormal behavior.