3.1 Electrical Installation Introduction

This section for electrical installation explains how to mount the electrical equipment and connect the electrical cables.

Reference Documents:


The following images show the electrical equipment included with the Seakeeper 5 Hardware Scope of Supply (Drawing No. 90944):

12 VDC Power Input Cable,
16.4 ft (5 m), P/N 20248
Seawater Pump Power In,
16.4 ft (5 m), P/N 30327
Seawater Pump Power Out,
16.4 ft (5 m), P/N 20334
NMEA CAN Cable,
19.7 ft (6 m), P/N 30332
M12 D-Code Ethernet Cable,
32.8 ft (10 m), P/N 30330
ConnectBox