Maintenance Introduction

Updated 06/07/2023

A regular inspection and cleaning of the Seakeeper Ride system is recommended. Zinc sacrificial anodes should be monitored and replaced as needed or according to the schedule below. Bottom paint should be applied in applications where the Controllers will be submerged for more than two (2) weeks at a time. Refer to the following sections for details on cleaning, removing broken or exhausted parts, and reinstalling components on the Seakeeper Ride system.

Follow the table below for recommended scheduled maintenance.

System / ComponentTaskIntervalParts / Special Tools
Mechanical / CorrosionInspect/replace sacrificial anode. 2. Zinc Sacrificial Anode Replacement – Seakeeper Manuals6 Months or 500 HoursSacrificial Anode Part Number: 60816
Mechanical / FastenersCheck Seal Plate bolts are still at torque spec for 450, 525, 600 or 7503 Months or 250 HoursTorque wrench
Actuator FrictionCheck Actuator is held tightly in place by Seal Plate. Seakeeper Ride | Check Actuator Friction – Seakeeper Manuals3 Months or 250 Hours
Electrical / ConnectorsInspect all connectors for corrosion, replace if necessary.12 Months or 1000 Hours 
Electrical / GroundsInspect all ground points for corrosion, clean as necessary, and treat with corrosion inhibitor.12 Months or 1000 Hours 
Electrical / CablesCheck all cables and wire harness branches for cracks or chafing.12 Months or 1000 Hours 

Note: Recommended scheduled maintenance is not covered under warranty.