1. Introduction
2. Safety Notices
2.1 Stability
2.2. Forces Applied to Hull
2.3. Installation Personnel
2.4. Installation Tools
3. Tools Needed
4. Inventory Parts
5. Identify Installation Location
Installation Location Introduction
5.1. Longitudinal Location
5.2. Vertical Location
5.3. Beam-Wise Location
5.4. Overhead Clearance
5.5. Loading and Storage Details
5.6. Asymmetrical Details
5.7. Cable Entry
6. Measure Transom Angle
Measure Transom Angle Introduction
6.1. Measurement Steps
6.2. Hulls with Unique Stern Features
7. Assemble Wedge Pack
Assemble Wedge Pack Introduction
7.1. Determine Wedges to Use
7.2. Bolt Parts Together
8. Prepare Hull
Prepare Hull Introduction
8.1. Trace Template Outline
8.2. Drill Holes
8.3. Wipe Area with Solvent
8.4. Mask Area with Tape
8.5. Fiberglass Hulls – Abrading Gel Coat
8.6. Fiberglass Hulls – Removing Gel Coat
8.7. Aluminum Hulls
8.8. Insert Positioning Screws
9. Test Fit
Test Fit Introduction
9.1. Test Fit the Seal Plate
10. Drill for Cable Entry
Drill for Cable Entry Introduction
10.1. Concealed Cable Entry
10.2. Exposed Cable Entry
11. Mount Wedge Pack
Mount Wedge Pack Introduction
11.1. Prepare Parts and Hull
11.2. Sand Adhered Surface
11.3. Clean Adhered Surfaces
11.4. Mount Wedge Pack
11.5. Confirm Location
11.6. Fair in Excess Glue
12. Actuator and Blade Installation
Actuator and Blade Installation Introduction
12.1. Concealed Cable Entry
12.2. Exposed Cable Entry