{"id":9710,"date":"2022-02-28T13:46:22","date_gmt":"2022-02-28T13:46:22","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-18-installation-manual-90672-1-draft-copy\/5-0-installation-checklist-and-supplies\/5-1-installation-checklist\/"},"modified":"2022-03-01T19:58:57","modified_gmt":"2022-03-01T19:58:57","slug":"5-1-installation-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-16-18-installation-manual\/5-0-installation-checklist-and-supplies\/5-1-installation-checklist\/","title":{"rendered":"Installation Checklist"},"content":{"rendered":"\n<p>The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completing the installation, the installer should commission each <span translate=\"no\">Seakeeper<\/span> unit with the <span translate=\"no\">Seakeeper<\/span> Commissioning Form (90437). The Commissioning Checklist (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the Commissioning Form.<\/p>\n\n\n\n<p>All <span translate=\"no\">Seakeeper<\/span> stabilizers should be commissioned to verify that installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Commissioning Form, all the items in the Installation Checklist, and verification of operation without alarms or abnormal behavior.<\/p>\n\n\n\n\n\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Please Complete Checklist and E-mail to <a href=\"mailto:customerservice@seakeeper.com\">customerservice@seakeeper.com<\/a> or telefax to +1.410.326.1199<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-1ca82cd6-97cd-4e60-afb8-756507e70ead\" style=\"font-size:25px\">Mechanical Checklist<br>(Reference Installation Manual Section: Mechanical Installation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li><span translate=\"no\">Seakeeper<\/span> foundation installed in hull<\/li><li>Foundation bolts torqued to specification<\/li><li>Clearances around the <span translate=\"no\">Seakeeper<\/span> meet service and operating specifications and no obstructions are within the <span translate=\"no\">Seakeeper<\/span> envelope<\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-b292c5c6-87fc-4342-ba39-879dcd4cffcb\" style=\"font-size:25px\">Electrical Checklist<br>(Reference <span translate=\"no\">Seakeeper<\/span> Drawing No. 90539 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Cable Block Diagram &amp; Installation Manual Section: Electrical Installation)<\/h2>\n\n\n\n<p><strong>Mount Components<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Display (near helm)<\/li><\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Connect Customer Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Cable 6 (Customer Supplied)<ul><li>Install lugs on both ends of customer-supplied 10 AWG ground cable<\/li><li>Connect one end of Cable 6 to nearest vessel ground and other end to <span translate=\"no\">Seakeeper<\/span> rear brace<\/li><\/ul><\/li><\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Connect <span translate=\"no\">Seakeeper<\/span> Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Cable 1 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 1 from <span translate=\"no\">Seakeeper<\/span> 24 VDC power at customer-supplied connection box or directly to circuit breaker<\/li><li>Plug connector of Cable 1 into mating connector on <span translate=\"no\">Seakeeper<\/span> wire harness<\/li><\/ul><\/li><li>Cable 2 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 2 from Drive Box to 230 VAC single phase at customer-supplied connection box or directly to circuit breaker<\/li><\/ul><\/li><li>Cable 3 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect female end of CAN communications Cable 3 to mating connector on <span translate=\"no\">Seakeeper<\/span> wire harness<\/li><\/ul><ul><li>Route CAN communications Cable 3 from <span translate=\"no\">Seakeeper<\/span> to helm (male end goes to helm)<\/li><li>Connect male end of CAN communications Cable 3 at helm to CAN Tee Adapter<\/li><\/ul><\/li><li>Cable 4 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Display and <span translate=\"no\">Seakeeper<\/span>-supplied Cable 4 to CAN Tee Adapter with CAN Terminator<\/li><\/ul><\/li><li>Cable 5 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 5 DC Seawater Pump Output Power Cable Male-Female connection to the DC &#8220;Seawater Pump-Out&#8221; from the Wire Harness<\/li><\/ul><\/li><li>Cable 8 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 8 DC Seawater Pump Input Power Cable, Female Only connection to the DC &#8220;Seawater Pump-In&#8221; from the Wire Harness Stripped end to be connected to a 24 VDC power source<\/li><\/ul><\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-0245f132-91ab-40b8-b9f4-7018ebd3a54e\" style=\"font-size:25px\">Cooling Checklist<br>(Reference Installation Manual Section: Cooling Installation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Verify coolant level in heat exchanger coolant reservoir.<\/li><li>Connect seawater hoses \/ open sea cocks to heat exchanger and test seawater pump.<\/li><li>Verify 4 GPM (15 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.<\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-dccd80ca-bea0-49d6-9b1f-4b6c17f67c04\" style=\"font-size:25px\">Start Up Checklist<br>(Reference Installation Manual Section: Start Up &amp; Operation Manual Section: System Operation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Remove lifting eye bolts and install cover panels<\/li><li>Turn on <span translate=\"no\">Seakeeper<\/span>, 24 VDC circuit breaker<\/li><li>Turn on Seawater Pump, 24 VDC circuit breaker<\/li><li>Turn on 230 VAC circuit breaker<\/li><li>Verify display works and no ALARMS are present<ul><li>If display does not work, turn off both circuit breakers immediately.<\/li><\/ul><\/li><li>Follow instructions in Section: Start Up Instructions to turn on the <span translate=\"no\">Seakeeper<\/span><\/li><li>Verify seawater pump turns on when the <span translate=\"no\">Seakeeper<\/span> is turned ON<\/li><li>Verify that no ALARMS are present<\/li><li>Follow instructions in Section: Start Up Instructions to turn off the <span translate=\"no\">Seakeeper<\/span><\/li><li>The <span translate=\"no\">Seakeeper<\/span> is powered off by switching off the AC &amp; DC power and seawater pump. The <span translate=\"no\">Seakeeper<\/span> will automatically be in LOCK mode once the system is turned off.<\/li><\/ul>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li><span translate=\"no\">Seakeeper<\/span> 16\/18 takes 4.5+ hours to coast down to 0 RPM from full speed<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completing the installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist (SWI-105) provides a checklist of items [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":9706,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[254],"model":[],"document_type":[],"hidden":[],"class_list":["post-9710","page","type-page","status-publish","hentry","manual-seakeeper-16-18-installation-manual-90549-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=9710"}],"version-history":[{"count":3,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9710\/revisions"}],"predecessor-version":[{"id":10124,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9710\/revisions\/10124"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9706"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=9710"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=9710"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=9710"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=9710"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=9710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}