{"id":9664,"date":"2022-02-28T13:46:21","date_gmt":"2022-02-28T13:46:21","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-18-installation-manual-90672-1-draft-copy\/1-0-mechanical-installation-2\/introduction\/"},"modified":"2022-03-01T20:16:22","modified_gmt":"2022-03-01T20:16:22","slug":"introduction","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-16-18-installation-manual\/1-0-mechanical-installation-2\/introduction\/","title":{"rendered":"Mechanical Installation Introduction"},"content":{"rendered":"\n<p>The <span translate=\"no\">Seakeeper<\/span> 16\/18 can produce vertical loads up to 5,965 lbs (26.5 kN), longitudinal loads up to 3,409 lbs (15.61 kN), and transvers loads of 500 lbs (2.22 kN) at each of the four mounts. Careful consideration should be given to foundation design to insure it is capable of transferring these loads into the hull. These loads do NOT include vessel motion accelerations, such as vertical slam loads which can be significant for high speed vessels and vary based upon the longitudinal location.<\/p>\n\n\n\n<p>There are two methods of installing the <span translate=\"no\">Seakeeper<\/span> 16\/18:<br>1. Bolt-In Installation<br>2. Bond-In (Saddle) Installation<\/p>\n\n\n\n<p><span class=\"has-inline-color has-vivid-red-color\">It is assumed that the installer is familiar with bonding using high strength adhesives or mechanical fasteners to marine structures and has performed structural analysis to assure the structure to which the <span translate=\"no\">Seakeeper<\/span> mounts can properly transfer the loads the <span translate=\"no\">Seakeeper<\/span> creates into the hull structure. If the installer has any doubt about the ability of the structure to transfer the loads to the hull, then a licensed naval architect or marine engineer should be contacted to do a structural analysis.<\/span><\/p>\n\n\n\n<p>The installer should review the following list of reference drawings to ensure the installation procedure is fully understood.<\/p>\n\n\n\n\n\n<p><strong>Reference Documents &amp; Drawings:<\/strong><br><a rel=\"noreferrer noopener\" href=\"https:\/\/www.seakeeper.com\/technical-library\/?type=&amp;product=seakeeper-16,seakeeper-18,seakeeper-12-HD&amp;search=\" data-type=\"URL\" data-id=\"https:\/\/www.seakeeper.com\/technical-library\/?type=&amp;product=seakeeper-16,seakeeper-18,seakeeper-12-HD&amp;search=\" target=\"_blank\">Link to <span translate=\"no\">Seakeeper<\/span> 16\/18 Reference Documents<\/a> <\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>90243 \u2013 <span translate=\"no\">Seakeeper<\/span> 16 Hardware Scope of Supply<\/li><li>90538 \u2013 <span translate=\"no\">Seakeeper<\/span> 18 Hardware Scope of Supply<\/li><li>90544 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Bolt-In Installation Guide<\/li><li>90545 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Bond-In Installation Guide<\/li><li>90540 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Cooling Water Schematic<\/li><li>90282 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18\/12HD Installation Template Kit<\/li><li>90539 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Cable Block Diagram<\/li><li>90548 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Bolt-In Kit<\/li><li>90547 \u2013 <span translate=\"no\">Seakeeper<\/span> 16\/18 Bond-In Kit<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Seakeeper 16\/18 can produce vertical loads up to 5,965 lbs (26.5 kN), longitudinal loads up to 3,409 lbs (15.61 kN), and transvers loads of 500 lbs (2.22 kN) at each of the four mounts. Careful consideration should be given to foundation design to insure it is capable of transferring these loads into the hull. [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":9662,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[254],"model":[],"document_type":[],"hidden":[],"class_list":["post-9664","page","type-page","status-publish","hentry","manual-seakeeper-16-18-installation-manual-90549-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=9664"}],"version-history":[{"count":4,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9664\/revisions"}],"predecessor-version":[{"id":10130,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9664\/revisions\/10130"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/9662"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=9664"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=9664"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=9664"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=9664"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=9664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}