{"id":8513,"date":"2022-01-12T17:09:50","date_gmt":"2022-01-12T17:09:50","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-1-installation-manual-90519-1-copy\/installation-and-start-up-checklist\/startup-checklist\/"},"modified":"2025-04-11T14:11:19","modified_gmt":"2025-04-11T14:11:19","slug":"startup-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-1-installation-manual-90519-2\/installation-and-start-up-checklist\/startup-checklist\/","title":{"rendered":"6.3 Start Up Checklist"},"content":{"rendered":"\n<p>Refer to <span translate=\"no\">Seakeeper<\/span> 1 Operation Manual, Section 2 for detailed start up instructions.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"400\" height=\"253\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/warning-icon.jpg\" alt=\"\" class=\"wp-image-1505\" style=\"width:219px;height:132px\"\/><\/figure>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p class=\"has-vivid-red-color has-text-color\"><br><strong>Prior to beginning the start up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete. Before continuing, the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span> 1 cover must be installed and the operating clearances must be clear of personnel and equipment.<\/strong><\/p>\n<\/div>\n<\/div>\n\n\n\n<ul class=\"wp-block-list checkboxes\">\n<li>Remove lifting bolts and install sealing bolts and washers into lifting eye holes and install cover.<\/li>\n\n\n\n<li>Energize battery isolation switch, high current 80 A breaker, and seawater pump breaker.<\/li>\n\n\n\n<li>Verify display is active and no alarms are present.\n<ul class=\"wp-block-list\">\n<li>If the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 1 display does not activate, turn off both circuit breakers immediately and check all wiring connections.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Override seawater pump \u201con\u201d (at 0 RPM hold down SERVICE Button, wrench icon, for 5 seconds) and verify flow at seawater outlet.<\/li>\n\n\n\n<li>Press <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> ON\/OFF Button and follow instructions in <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> 1 Operation Manual, Section 2 for complete start up instructions.<\/li>\n\n\n\n<li>Verify that no ALARMS are present.<\/li>\n\n\n\n<li>Power <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> 1 down. The <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> 1 flywheel will take 2+ hours to coast down to 0 RPM.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Refer to Seakeeper 1 Operation Manual, Section 2 for detailed start up instructions. Prior to beginning the start up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete. Before continuing, the Seakeeper 1 cover must be installed and the operating clearances must be clear of personnel and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":8507,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[239],"model":[],"document_type":[],"hidden":[],"class_list":["post-8513","page","type-page","status-publish","hentry","manual-seakeeper-1-installation-manual-90519-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/8513","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=8513"}],"version-history":[{"count":5,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/8513\/revisions"}],"predecessor-version":[{"id":19913,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/8513\/revisions\/19913"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/8507"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=8513"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=8513"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=8513"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=8513"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=8513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}