{"id":4921,"date":"2021-07-30T15:59:14","date_gmt":"2021-07-30T15:59:14","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-26-20hd-installation-manual-copy\/installation-checklist-and-supplies\/installation-checklist\/"},"modified":"2021-10-08T18:47:57","modified_gmt":"2021-10-08T18:47:57","slug":"installation-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-35-installation-manual\/installation-checklist-and-supplies\/installation-checklist\/","title":{"rendered":"Installation Checklist"},"content":{"rendered":"\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Please Complete Checklist and E-mail to <a href=\"mailto:customerservice@seakeeper.com\">customerservice@seakeeper.com<\/a> or telefax to +1.410.326.1199<\/strong><\/p>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-1ca82cd6-97cd-4e60-afb8-756507e70ead\" style=\"font-size:25px\">Mechanical Checklist<br>(Reference Installation Manual Section: Mechanical Installation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li><span translate=\"no\">Seakeeper<\/span> foundation installed in hull<\/li><li>Foundation bolts torqued to specification<\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-b292c5c6-87fc-4342-ba39-879dcd4cffcb\" style=\"font-size:25px\">Electrical Checklist<br>(Reference <span translate=\"no\">Seakeeper<\/span> Drawing No. 90288 \u2013 <span translate=\"no\">Seakeeper<\/span> 35\/30HD Cable Block Diagram &amp; Installation Manual Section: Electrical Installation)<\/h2>\n\n\n\n<p><strong>Mount Components<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Display (near helm)<\/li><\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Connect Customer Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Cable 6 (Customer Supplied)<ul><li>Install lugs on both ends of customer-supplied 10 AWG ground cable<\/li><li>Connect one end of Cable 6 to nearest vessel ground and other end to <span translate=\"no\">Seakeeper<\/span> foundation frame<\/li><\/ul><\/li><\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Connect <span translate=\"no\">Seakeeper<\/span> Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Cable 1<ul><li>Connect Cable 1 from <span translate=\"no\">Seakeeper<\/span> to 24 VDC power at customer-supplied connection box or directly to circuit breaker<\/li><\/ul><ul><li>Plug connector of Cable 1 into mating connector on <span translate=\"no\">Seakeeper<\/span> wire harness<\/li><\/ul><\/li><li>Cable 2 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 2 from Drive Box to 230 VAC single phase at customer-supplied connection box or directly to circuit breaker<\/li><\/ul><\/li><li>Cable 5 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect Cable 5 from Drive Box to customer-supplied 230 VAC seawater pump<\/li><\/ul><\/li><li>Cable 3 (<span translate=\"no\">Seakeeper<\/span> Supplied)<ul><li>Connect female end of CAN communications Cable 3 to mating connector on <span translate=\"no\">Seakeeper<\/span> wire harness<\/li><li>Route CAN communications Cable 3 from <span translate=\"no\">Seakeeper<\/span> to helm (male end goes to helm)<\/li><li>Connect male end of CAN communications Cable 3 at helm to CAN Tee Adapter<\/li><li>Connect Display and <span translate=\"no\">Seakeeper<\/span>-supplied Cable 4 to CAN Tee Adapter with CAN Terminator<\/li><\/ul><\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-0245f132-91ab-40b8-b9f4-7018ebd3a54e\" style=\"font-size:25px\">Cooling Checklist<br>(Reference Installation Manual Section: Cooling Installation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Verify coolant level in heat exchanger coolant reservoir.<\/li><li>Connect seawater hoses \/ open sea cocks to heat exchanger and test seawater pump.<\/li><li>Verify 10 GPM (38 LPM) minimum and 14 GPM (53 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.<\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-dccd80ca-bea0-49d6-9b1f-4b6c17f67c04\" style=\"font-size:25px\">Start Up Checklist<br>(Reference Installation Manual Section: Start Up &amp; Operation Manual Section: System Operation)<\/h2>\n\n\n\n<ul class=\"checkboxes wp-block-list\"><li>Remove lifting eyes, install sealing fasteners in lifting holes, and install cover panels<\/li><li>Turn on 24 VDC circuit breaker<\/li><li>Turn on 230 VAC circuit breaker<\/li><li>Verify display works and no ALARMS are present<ul><li>If display does not work, turn off both circuit breakers immediately.<\/li><li>Check polarity of 24 VDC power per Section: Electrical Equipment Power Connections &#8211; DC Power Connection Instructions.<\/li><\/ul><\/li><li>Follow instructions in Section: Start Up Instructions to turn on the <span translate=\"no\">Seakeeper<\/span><\/li><li>Verify seawater pump turns on when the <span translate=\"no\">Seakeeper<\/span> is turned ON<\/li><li>Verify that no ALARMS are present<\/li><li>Follow instructions in Section: Start Up Instructions to turn off the <span translate=\"no\">Seakeeper<\/span><\/li><li>AC &amp; DC power and seawater pump may be turned off after the <span translate=\"no\">Seakeeper<\/span> is turned off by placing the <span translate=\"no\">Seakeeper<\/span> in LOCK mode and turning the <span translate=\"no\">Seakeeper<\/span> off.<\/li><li><span translate=\"no\">Seakeeper<\/span> 35 takes 5+ hours to coast down to 0 RPM from full speed<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Please Complete Checklist and E-mail to customerservice@seakeeper.com or telefax to +1.410.326.1199 Mechanical Checklist(Reference Installation Manual Section: Mechanical Installation) Seakeeper foundation installed in hull Foundation bolts torqued to specification Electrical Checklist(Reference Seakeeper Drawing No. 90288 \u2013 Seakeeper 35\/30HD Cable Block Diagram &amp; Installation Manual Section: Electrical Installation) Mount Components Display (near helm) Connect Customer Supplied Cables [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":4919,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[196],"model":[],"document_type":[],"hidden":[],"class_list":["post-4921","page","type-page","status-publish","hentry","manual-seakeeper-35-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=4921"}],"version-history":[{"count":7,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4921\/revisions"}],"predecessor-version":[{"id":7341,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4921\/revisions\/7341"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4919"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=4921"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=4921"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=4921"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=4921"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=4921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}