{"id":4897,"date":"2021-07-30T15:59:13","date_gmt":"2021-07-30T15:59:13","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-26-20hd-installation-manual-copy\/electrical-installation\/second-operator-station-connection\/"},"modified":"2021-08-04T14:33:49","modified_gmt":"2021-08-04T14:33:49","slug":"second-operator-station-connection","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-35-installation-manual\/electrical-installation\/second-operator-station-connection\/","title":{"rendered":"Second Operator Station Connection"},"content":{"rendered":"\n<p>This section explains how to connect the 2<sup>nd<\/sup> Operator Station Kit.<\/p>\n\n\n\n<p><strong>Reference Documents &amp; Drawings<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>90467 \u2013 Helm Display 2<sup>nd<\/sup> Operator Station Kit<\/li><li>90288 \u2013 <span translate=\"no\">Seakeeper<\/span> 35\/30HD Cable Block Diagram (includes detail of 2<sup>nd<\/sup> Operator Station)<\/li><\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">Determine Location of 2<sup>nd<\/sup> Operator Station<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>The desired location of the 2<sup>nd<\/sup> Operator Station must be determined with respect to the 1<sup>st<\/sup> Operator Station and the vessel arrangement.<\/li><li>Typical locations include:<ol><li>Flybridge<\/li><li>Engine room<\/li><\/ol><\/li><\/ol>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">Determine Cabling Arrangement<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>Figure 10 below shows the entire serial communications link for 2 Operator Stations. The Terminator must be installed on the Tee Adapter <strong>farthest <\/strong>from the <span translate=\"no\">Seakeeper<\/span>.<\/li><\/ol>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-35-Cabling-for-2-Operator-Stations.jpg\" alt=\"\" class=\"wp-image-5048\" width=\"889\" height=\"366\"\/><figcaption><em><strong>Figure 10 \u2013<\/strong> Cabling for 2 Operator Stations<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\"><li>The Operator Station nearest the <span translate=\"no\">Seakeeper<\/span> should be connected to Cable 3.<\/li><\/ol>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">Route 2<sup>nd<\/sup> Operator Station Cable<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>A second CAN Cable Assembly (P\/N 30243), also a 25 m shielded cable, and the largest connector is a molded plug with maximum outer diameter of .58 in. (14.8 mm).<\/li><li>The additional CAN Cable Assembly must be routed in the vessel from the 1<sup>st<\/sup> Operator Station (female end) to the 2<sup>nd<\/sup> (male end) Operator Station.<\/li><\/ol>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">Install 2<sup>nd<\/sup> Operator Station Equipment<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>The 2<sup>nd<\/sup> Operator Station equipment is installed at the determined location using instructions found in Section: Electrical Equipment Mounting.<\/li><\/ol>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">Connect 2<sup>nd<\/sup> Operator Station Equipment<\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li>The 2<sup>nd<\/sup> Operator Station equipment is connected in accordance with Drawing No. 90288 \u2013 <span translate=\"no\">Seakeeper<\/span> 35\/30HD Cable Block Diagram.<\/li><\/ol>\n","protected":false},"excerpt":{"rendered":"<p>This section explains how to connect the 2nd Operator Station Kit. Reference Documents &amp; Drawings 90467 \u2013 Helm Display 2nd Operator Station Kit 90288 \u2013 Seakeeper 35\/30HD Cable Block Diagram (includes detail of 2nd Operator Station) Determine Location of 2nd Operator Station The desired location of the 2nd Operator Station must be determined with respect [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":4885,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[196],"model":[],"document_type":[],"hidden":[],"class_list":["post-4897","page","type-page","status-publish","hentry","manual-seakeeper-35-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=4897"}],"version-history":[{"count":3,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4897\/revisions"}],"predecessor-version":[{"id":5051,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4897\/revisions\/5051"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4885"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=4897"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=4897"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=4897"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=4897"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=4897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}