{"id":4865,"date":"2021-07-30T15:59:12","date_gmt":"2021-07-30T15:59:12","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper-26-20hd-installation-manual-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2021-10-08T19:44:31","modified_gmt":"2021-10-08T19:44:31","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-35-installation-manual\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\"><li>Locate and position 4 isolation gaskets onto foundation beams (for metal to metal contacts only).<br>NOTE: A <strong>VERY SMALL<\/strong> AMOUNT OF SEALANT MAY BE APPLIED TO THE GASKET TO KEEP WATER FROM WICKING INTO THE JOINT.<\/li><li>Lower <span translate=\"no\">Seakeeper<\/span> into position onto foundation beams and align over drilled holes.<\/li><li>Install <span translate=\"no\">Seakeeper<\/span> supplied M16 fasteners as shown in figure below \u2013 <span class=\"has-inline-color has-vivid-red-color\">apply a moderate coat of nickel based anti-seize compound to the threads<\/span> of each bolt prior to installation and a small amount of sealant to the washer faces.<\/li><li><span class=\"has-inline-color has-vivid-red-color\">Torque all fasteners to 100 ft-lbs (136 N-m).<\/span><\/li><li>Proceed to electrical and cooling portion of the installation.<\/li><\/ol>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-35-Bolt-In-Installation-1.jpg\" alt=\"\" class=\"wp-image-4963\" width=\"511\" height=\"479\"\/><\/figure><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-35-Bolt-In-Installation-2.jpg\" alt=\"\" class=\"wp-image-4964\" width=\"532\" height=\"441\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-35-Bolt-In-Installation-2.jpg 947w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-35-Bolt-In-Installation-2-768x637.jpg 768w\" sizes=\"auto, (max-width: 532px) 100vw, 532px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Locate and position 4 isolation gaskets onto foundation beams (for metal to metal contacts only).NOTE: A VERY SMALL AMOUNT OF SEALANT MAY BE APPLIED TO THE GASKET TO KEEP WATER FROM WICKING INTO THE JOINT. Lower Seakeeper into position onto foundation beams and align over drilled holes. Install Seakeeper supplied M16 fasteners as shown in [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":4859,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[196],"model":[],"document_type":[],"hidden":[],"class_list":["post-4865","page","type-page","status-publish","hentry","manual-seakeeper-35-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4865","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=4865"}],"version-history":[{"count":2,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4865\/revisions"}],"predecessor-version":[{"id":7351,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4865\/revisions\/7351"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/4859"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=4865"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=4865"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=4865"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=4865"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=4865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}