{"id":21304,"date":"2026-03-31T12:33:37","date_gmt":"2026-03-31T12:33:37","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-6-installation-manual-90402-6-6-254-8146-to-current-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2026-08-21T17:53:28","modified_gmt":"2026-08-21T17:53:28","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-7-5-installation-manual\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.3.3  Installation of Seakeeper"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>For dissimilar metal foundations, locate and position four isolation gaskets (P\/N 14306) (Fig. 15) onto foundation beams and apply a small bead of marine sealant (SILI-THANE 803 or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span>.<\/li>\n\n\n\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto foundation beams and align over drilled holes.<\/li>\n\n\n\n<li>Install Mounting Bolts:<br>\n\n\n<ol class=\"wp-block-list\">\n<li>For <strong>Blind-Hole installations<\/strong> (P\/N 90911 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 7.5 Blind-Hole Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16-2.0 fasteners to maintain a <strong>minimum thread engagement of 0.95 in. (24 mm).<\/strong> A<mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-black-color\">pply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent)<\/mark> <mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-black-color\">to the threads<\/mark> of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 14.<\/li>\n\n\n\n<li>For <strong>Through-Bolt installations<\/strong> (P\/N 90912 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 7.5 Through-Bolt Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16-2.0 fasteners to maintain a <strong>minimum of 2 threads protruding past nut.<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 15.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li class=\"has-vivid-red-color has-text-color has-link-color wp-elements-1\"><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>Torque all fasteners to <\/strong><\/mark><strong>155<\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong> ft-lbs (<\/strong><\/mark><strong>210<\/strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong> N-m).<\/strong><\/mark><br>\n<ol class=\"wp-block-list\">\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">New bolts, matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification, must be used for each installation and reinstallation that meet the requirements listed above.<\/mark><\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"905\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/7.5-MOCK-HULL-w-HSS.png\" alt=\"\" class=\"wp-image-22589\" style=\"object-fit:cover;width:565px;height:485px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/7.5-MOCK-HULL-w-HSS.png 1280w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/7.5-MOCK-HULL-w-HSS-768x543.png 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 13 <em><strong>\u2013<\/strong><\/em> <\/strong><span translate=\"no\">Seakeeper<\/span> 7.5 Bolt-In Installation<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1659\" height=\"676\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Blind-Bolt-Detail.png\" alt=\"\" class=\"wp-image-21745\" style=\"object-fit:cover;width:815px;height:320px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Blind-Bolt-Detail.png 1659w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Blind-Bolt-Detail-768x313.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Blind-Bolt-Detail-1536x626.png 1536w\" sizes=\"auto, (max-width: 1659px) 100vw, 1659px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 14<\/em><\/strong><em> &#8211; Blind Hole Details<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1646\" height=\"619\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Thru-Bolt-Image.png\" alt=\"\" class=\"wp-image-21746\" style=\"object-fit:cover;width:815px;height:300px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Thru-Bolt-Image.png 1646w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Thru-Bolt-Image-768x289.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/Thru-Bolt-Image-1536x578.png 1536w\" sizes=\"auto, (max-width: 1646px) 100vw, 1646px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 15<\/em><\/strong><em> &#8211; Thru-Bolt Details<\/em><\/figcaption><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":21298,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[373],"model":[],"document_type":[],"hidden":[],"class_list":["post-21304","page","type-page","status-publish","hentry","manual-seakeeper-7-5-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/21304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=21304"}],"version-history":[{"count":5,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/21304\/revisions"}],"predecessor-version":[{"id":22591,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/21304\/revisions\/22591"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/21298"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=21304"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=21304"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=21304"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=21304"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=21304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}