{"id":20694,"date":"2025-11-12T17:56:37","date_gmt":"2025-11-12T17:56:37","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-10-installation-manual-90841-1-copy\/start-up\/introduction\/"},"modified":"2025-11-25T15:39:01","modified_gmt":"2025-11-25T15:39:01","slug":"introduction","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-10-installation-manual-90841-2\/start-up\/introduction\/","title":{"rendered":"6.1  Checklists Introduction"},"content":{"rendered":"\n<p>This section describes the first startup of the <span translate=\"no\">Seakeeper<\/span>.<\/p>\n\n\n\n<p><strong>Reference Documents &amp; Drawings:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"http:\/\/manuals.seakeeper.com\/seakeeper\/\" target=\"_blank\" rel=\"noreferrer noopener\">90842 \u2013 <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> 10 Operation Manual<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.seakeeper.com\/dealer-access\/?type=&amp;product=&amp;search=90437\" target=\"_blank\" rel=\"noreferrer noopener\">90437 &#8211; <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Commissioning Form<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.seakeeper.com\/technical-library\/?type=&amp;product=&amp;search=90569\" target=\"_blank\" rel=\"noreferrer noopener\">90569 &#8211; <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> ConnectBox and App Quick Start Guide<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.seakeeper.com\/dealer-access\/?type=&amp;product=&amp;search=SWI-105\" target=\"_blank\" rel=\"noreferrer noopener\">SWI-105 &#8211; Commissioning Checklist<\/a><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"406\" height=\"358\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/CAUTION.png\" alt=\"\" class=\"wp-image-10247\" style=\"width:130px;height:115px\"\/><\/figure>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<ul class=\"wp-block-list\">\n<li>Previous sections for mechanical, electrical, and cooling installation must be completed before initiating this startup sequence.<\/li>\n\n\n\n<li>Before continuing, covers must be installed unless the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> is inaccessible and there is no risk of injury. Also, the area around the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> must be clear of personnel and equipment.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<p>The Installation and Start-Up Checklist section provides an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. For the <span translate=\"no\">Seakeeper<\/span> 10 installation, the installer should commission each <span translate=\"no\">Seakeeper<\/span> unit with the <span translate=\"no\">Seakeeper<\/span> Commissioning Form (90437). The Commissioning Checklist Work Instruction (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the <span translate=\"no\">Seakeeper<\/span><br>Commissioning Form (90437).<\/p>\n\n\n\n<p>All <span translate=\"no\">Seakeeper<\/span> stabilizers should be commissioned to verify that installation specifications and requirements have been appropriately implemented. The commissioning process should include completing the <span translate=\"no\">Seakeeper<\/span> Commissioning Form (90437), reviewing all the items in the Installation Checklist, and verifying that the <span translate=\"no\">Seakeeper<\/span> operation is without alarms or abnormal behavior.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This section describes the first startup of the Seakeeper. Reference Documents &amp; Drawings: The Installation and Start-Up Checklist section provides an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. For the Seakeeper 10 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":20692,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[365],"model":[],"document_type":[],"hidden":[],"class_list":["post-20694","page","type-page","status-publish","hentry","manual-seakeeper-10-installation-manual-90841-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=20694"}],"version-history":[{"count":2,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20694\/revisions"}],"predecessor-version":[{"id":21127,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20694\/revisions\/21127"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20692"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=20694"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=20694"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=20694"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=20694"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=20694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}