{"id":20531,"date":"2025-11-12T14:24:12","date_gmt":"2025-11-12T14:24:12","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-9-installation-manual-90222-11-s-n-9-233-4900-to-current-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2025-11-12T15:14:24","modified_gmt":"2025-11-12T15:14:24","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-9-installation-manual-90222-12-s-n-9-254-5731-to-current\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.4.4  Installation of Seakeeper"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1208\" height=\"1112\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-Isol-Gaskets.png\" alt=\"\" class=\"wp-image-12031\" style=\"width:302px;height:278px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-Isol-Gaskets.png 1208w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-Isol-Gaskets-768x707.png 768w\" sizes=\"auto, (max-width: 1208px) 100vw, 1208px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 13 &#8211; <\/em><\/strong><em>Placing isolation gaskets<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<ol class=\"wp-block-list\">\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto the hull foundation beams and align over drilled holes. Apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent) between mating surfaces of <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> frame and hull structure to prevent moisture wicking into bolt holes.<br>\n<ol class=\"wp-block-list\">\n<li>For dissimilar metal foundations, locate and position the 4 isolation gaskets (P\/N 10860) onto foundation beams and apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span>.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Install Mounting Bolts, as shown in Figure 14:<br>\n<ol class=\"wp-block-list\">\n<li>For <strong>Blind-Hole installations<\/strong> (P\/N 90642 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 9 Bolt-In Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M14-2.0 x 85 mm fasteners or alternative Grade 10.9, M14-2.0 bolts to maintain a <strong>minimum thread engagement of 0.90 in. (23 mm).<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel-based anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/li>\n\n\n\n<li>For <strong>Through-Bolt Installations<\/strong> (P\/N 90643 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 9 Through-Bolt Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M14-2.0 x 100 mm fasteners or alternative Grade 10.9, M14-2.0 bolts to maintain a <strong>minimum of 2 threads protruding past nut.<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel-based anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>Torque all fasteners to 100 ft-lbs (135.6 N-m).<\/strong><\/mark><br>\n<ol class=\"wp-block-list\">\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">New bolts, matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification, must be used for each installation and reinstallation that meet the requirements listed above.<\/mark><\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1603\" height=\"802\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-CBRO-Install-Details.png\" alt=\"\" class=\"wp-image-15484\" style=\"width:802px;height:401px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-CBRO-Install-Details.png 1603w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-CBRO-Install-Details-768x384.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK9-CBRO-Install-Details-1536x768.png 1536w\" sizes=\"auto, (max-width: 1603px) 100vw, 1603px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 14 &#8211; <\/em><\/strong><em>Blind Hole (Left) and Through<\/em>&#8211;<em>Bolt (Right) Details Shown<\/em><br><em>(Measurements in brackets are in inches; measurements not in brackets are in millimeters)<\/em><\/figcaption><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":20523,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[363],"model":[],"document_type":[],"hidden":[],"class_list":["post-20531","page","type-page","status-publish","hentry","manual-seakeeper-9-installation-manual-90222-12-s-n-9-254-5731-to-current"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=20531"}],"version-history":[{"count":2,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20531\/revisions"}],"predecessor-version":[{"id":20601,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20531\/revisions\/20601"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20523"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=20531"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=20531"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=20531"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=20531"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=20531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}