{"id":20393,"date":"2025-11-06T18:01:54","date_gmt":"2025-11-06T18:01:54","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-5-6-installation-manual-90402-5-6-5-233-5847-to-current-copy\/installation-checklist-and-supplies\/installation-checklist\/"},"modified":"2026-01-05T18:40:36","modified_gmt":"2026-01-05T18:40:36","slug":"installation-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-6-installation-manual-90402-6-6-254-8146-to-current\/installation-checklist-and-supplies\/installation-checklist\/","title":{"rendered":"6.2  Installation Checklist"},"content":{"rendered":"\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Please Complete Checklist and E-mail to <a href=\"mailto:support@seakeeper.com\">support@seakeeper.com<\/a> or <a href=\"mailto:emeasupport@seakeeper.com\">emeasupport@seakeeper.com<\/a>.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-1ca82cd6-97cd-4e60-afb8-756507e70ead\" style=\"font-size:25px\">6.1.1  Mechanical Checklist<br>(Reference Installation Manual Section: Mechanical Installation)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> foundation installed in hull<\/li>\n\n\n\n<li>Foundation bolts torqued to specification<\/li>\n<\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-b292c5c6-87fc-4342-ba39-879dcd4cffcb\" style=\"font-size:25px\">6.1.2 Electrical Checklist<br>(Reference <span translate=\"no\">Seakeeper<\/span> Drawing No. 90396 \u2013 <span translate=\"no\">Seakeeper<\/span> 6 Cable Block Diagram &amp; Installation Manual Section: Electrical Installation)<\/h2>\n\n\n\n<p><strong>Mount Components<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Display (near helm)<\/li>\n<\/ul>\n\n\n\n<p><strong>Connect Customer Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Ground Cable (Customer Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Install lugs on both ends of customer-supplied 10 AWG ground cable<\/li>\n\n\n\n<li>Connect one end of Cable 3 to nearest vessel ground and other end to <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> rear brace<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p><strong>Connect <span translate=\"no\">Seakeeper<\/span> Supplied Cables<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>DC Control Power Input Cable (<span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Connect other end of cable to 12 VDC power at customer-supplied connection box or directly to circuit breaker<\/li>\n\n\n\n<li>Plug connector of cable into mating connector on <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> wire harness<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>DC Seawater Pump Input Cable (<span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Connect cable from <em>SW PUMP VDC IN<\/em> directly to circuit breaker<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>DC Seawater Pump Output Cable and Y-Branch SW Pump &amp; Valve Cable (<span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Connect cable from <em>SW PUMP VDC OUT<\/em> to Y-Branch SW Pump Output &amp; Valve Cable.<\/li>\n\n\n\n<li>Connect customer-supplied DC seawater pump to Y-Branch SW Pump Output &amp; Valve Cable.<\/li>\n\n\n\n<li>Connect inline fuse connector to DTM Deutsch connector and the electric ball valve to the inline fuse connector.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Ethernet Cable (<span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Connect end of cable to mating connector on <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> ConnectBox.<\/li>\n\n\n\n<li>Route Ethernet cable from <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> to helm.<\/li>\n\n\n\n<li>Connect appropriate MFD-specific cable to end of Ethernet cable from ConnectBox.<\/li>\n\n\n\n<li>Connect Ethernet MFD-specific cable into compatible MFD or Ethernet bus.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>NMEA 2000 drop cable (<span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Supplied)<br>\n<ul class=\"wp-block-list\">\n<li>Attach NMEA 2000 drop cable to appropriate connector in ConnectBox.<\/li>\n\n\n\n<li>Connect other end of NMEA 2000 drop cable into NMEA backbone.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-0245f132-91ab-40b8-b9f4-7018ebd3a54e\" style=\"font-size:25px\">6.1.3  Cooling Checklist<br>(Reference Installation Manual Section: Cooling Installation)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verify coolant level just below filler neck in heat exchanger coolant reservoir.<\/li>\n\n\n\n<li>Connect seawater hoses \/ open sea cocks to heat exchanger and test seawater pump and electric valve.<\/li>\n\n\n\n<li>Verify 2.5 GPM (9.5 LPM) minimum and 5 GPM (19 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.<\/li>\n<\/ul>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-dccd80ca-bea0-49d6-9b1f-4b6c17f67c04\" style=\"font-size:25px\">6.1.4  Start Up Checklist<br>(Reference Installation Manual Section: Start Up &amp; Operation Manual Section: System Operation)<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Remove lifting bolts and install cover panels<\/li>\n\n\n\n<li>Turn on 12 VDC circuit breakers (one for control power and one for 12 VDC SW Pump)<\/li>\n\n\n\n<li>Turn on 110 or 230 VAC circuit breaker<\/li>\n\n\n\n<li>Verify display works and no ALARMS are present<\/li>\n\n\n\n<li>Follow instructions in Installation Manual Section: Start Up Instructions to turn on the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/li>\n\n\n\n<li>Verify seawater pump eventually turns on when the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> is ON<\/li>\n\n\n\n<li>Verify that no ALARMS are present<\/li>\n\n\n\n<li>Follow instructions in Installation Manual Section: Start Up Instructions to turn off the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/li>\n\n\n\n<li>AC &amp; DC power and seawater pump may be turned off after the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> is turned off by placing the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> in LOCK mode and turning the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> off<\/li>\n\n\n\n<li><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> takes 4 or more hours to coast down to 0 RPM from full speed<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Please Complete Checklist and E-mail to support@seakeeper.com or emeasupport@seakeeper.com. 6.1.1 Mechanical Checklist(Reference Installation Manual Section: Mechanical Installation) 6.1.2 Electrical Checklist(Reference Seakeeper Drawing No. 90396 \u2013 Seakeeper 6 Cable Block Diagram &amp; Installation Manual Section: Electrical Installation) Mount Components Connect Customer Supplied Cables Connect Seakeeper Supplied Cables 6.1.3 Cooling Checklist(Reference Installation Manual Section: Cooling Installation) 6.1.4 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":20389,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[361],"model":[],"document_type":[],"hidden":[],"class_list":["post-20393","page","type-page","status-publish","hentry","manual-seakeeper-6-installation-manual-90402-6-6-254-8146-to-current"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=20393"}],"version-history":[{"count":7,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20393\/revisions"}],"predecessor-version":[{"id":21176,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20393\/revisions\/21176"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/20389"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=20393"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=20393"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=20393"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=20393"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=20393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}