{"id":17743,"date":"2023-12-05T15:20:38","date_gmt":"2023-12-05T15:20:38","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-10-5-installation-manual-90841-1-draft-copy\/start-up\/installation-checklist\/"},"modified":"2025-08-11T12:38:56","modified_gmt":"2025-08-11T12:38:56","slug":"installation-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-14-installation-manual-90873-1\/start-up\/installation-checklist\/","title":{"rendered":"6.2  Installation Checklist"},"content":{"rendered":"\n<p class=\"has-text-align-center has-medium-font-size\"><strong>Please Complete Checklist and E-mail to <\/strong><br><strong><a href=\"mailto:customerservice@seakeeper.com\">customerservice@seakeeper.com<\/a> or telefax to +1.410.326.1199<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-1ca82cd6-97cd-4e60-afb8-756507e70ead\" style=\"font-size:25px\">Mechanical Checklist<br>(Reference Installation Manual Section: Mechanical Installation)<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>_____     <span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span> foundation installed in hull<\/p>\n\n\n\n<p>_____     Foundation bolts torqued to specification<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-b292c5c6-87fc-4342-ba39-879dcd4cffcb\" style=\"font-size:25px\">Electrical Checklist<br>(Reference <span translate=\"no\">Seakeeper<\/span> Drawing No. 90257 \u2013 <span translate=\"no\">Seakeeper<\/span> 14 Cable Block Diagram &amp; Installation Manual Section: Electrical Installation)<\/h2>\n\n\n\n<p><strong>Mount Components<\/strong><\/p>\n\n\n\n<p>_____     Optional 5&#8243; Display (near helm)<\/p>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<p class=\"has-medium-font-size\"><strong><span style=\"text-decoration: underline;\">Connect Customer Supplied Cables<\/span><\/strong><\/p>\n\n\n\n<p><strong><span translate=\"no\">Seakeeper<\/span> Ground Cable <\/strong>(Customer supplied)<\/p>\n\n\n\n<p>     _____     Install lugs on both ends of customer-supplied 10 AWG (6 mm<sup>2<\/sup>) ground cable<\/p>\n\n\n\n<p>     _____     Connect one end of ground cable to nearest vessel ground and other end to <span translate=\"no\">Seakeeper<\/span> 14 rear  <br>                   brace<\/p>\n\n\n\n<p class=\"has-medium-font-size\"><strong><span style=\"text-decoration: underline;\">Connect <span translate=\"no\">Seakeeper<\/span> Supplied Cables<\/span><\/strong><\/p>\n\n\n\n<p><strong>Control Power Cable<\/strong><\/p>\n\n\n\n<p>     _____     Connect control power cable from <span translate=\"no\">Seakeeper<\/span> to 24 VDC power at customer-supplied connection <br>                   box or directly to circuit breaker<\/p>\n\n\n\n<p>     _____     Plug connector of control power cable into mating connector on <span translate=\"no\">Seakeeper<\/span> wire harness<\/p>\n\n\n\n<p><strong>AC Input Cable<\/strong><\/p>\n\n\n\n<p>     _____     Connect AC input cable from Drive Box to 230 VAC single phase at customer-supplied connection <br>                   box or directly to circuit breaker<\/p>\n\n\n\n<p><strong>DC Seawater Pump Power Cable<\/strong><\/p>\n\n\n\n<p>     _____     Connect DC seawater pump power input cable from <span translate=\"no\">Seakeeper<\/span> to 24 VDC \/10 A power at customer-<br>                   supplied connection box or directly to circuit breaker<\/p>\n\n\n\n<p>     _____     Plug connector of DC seawater pump power cable into mating connector on <span translate=\"no\">Seakeeper<\/span> wire <br>                   harness at <em>DC SW Pump In<\/em><\/p>\n\n\n\n<p><strong>DC Seawater Pump Output Cable<\/strong><\/p>\n\n\n\n<p>     _____     Connect seawater pump output cable from <em>DC SW Pump Out<\/em> to 24 VDC seawater pump<\/p>\n\n\n\n<p><strong>MFD Ethernet Adapter Cable<\/strong><\/p>\n\n\n\n<p>     _____     Connect male end of ethernet adapter cable to <em>Ethernet<\/em> connection on ConnectBox<\/p>\n\n\n\n<p>     _____     Route ethernet adapter cable to selected MFD compatibility cable towards helm<\/p>\n\n\n\n<p>     _____     Connect female end of ethernet adapter cable to MFD compatibility cable<\/p>\n\n\n\n<p>     _____     Connect MFD compatibility cable  to MFD Display<\/p>\n\n\n\n<p><strong>OPTIONAL <span translate=\"no\">Seakeeper<\/span> 5&#8243; Display CAN Cable<\/strong><\/p>\n\n\n\n<p>    _____     Connect female end of CAN communication cable to tee-adapter at ConnectBox<br>                  (at tee-adapter terminal resistor)<\/p>\n\n\n\n<p>    _____     Route CAN communication cable to <span translate=\"no\">Seakeeper<\/span> 5&#8243; display<\/p>\n\n\n\n<p>    _____     Connect male end of CAN communication cable to tee-adapter with terminal resistor at 5&#8243; display<\/p>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-0245f132-91ab-40b8-b9f4-7018ebd3a54e\" style=\"font-size:25px\">Cooling Checklist<br>(Reference Installation Manual Section: Cooling Installation)<\/h2>\n\n\n\n<p>_____     Verify coolant level in coolant reservoir<\/p>\n\n\n\n<p>_____     Connect seawater hoses \/ open sea cocks to heat exchanger and test seawater pump<\/p>\n\n\n\n<p>_____     Verify 4 GPM (15 LPM) minimum and 8 GPM (30 LPM) maximum seawater flow through heat<br>              heat exchanger under all  operating conditions of the boat<\/p>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"block-dccd80ca-bea0-49d6-9b1f-4b6c17f67c04\" style=\"font-size:25px\">Start Up Checklist<br>(Reference Installation Manual Section: Start Up &amp; Operation Manual Section: System Operation)<\/h2>\n\n\n\n<p>_____     Remove lifting eyebolts and install cover panels<\/p>\n\n\n\n<p>_____     Turn on 24 VDC circuit breakers<\/p>\n\n\n\n<p>_____     Turn on 230 VAC circuit breaker<\/p>\n\n\n\n<p>_____     Verify display works and no ALARMS are present<\/p>\n\n\n\n<p>          _____     If display does not work, turn off both circuit breakers immediately<\/p>\n\n\n\n<p>_____     Follow instructions in Installation Manual Section: Start Up Instructions to turn on the <span translate=\"no\">Seakeeper<\/span><\/p>\n\n\n\n<p>_____     Verify seawater pump turns on while the <span translate=\"no\">Seakeeper<\/span> is turned ON. The Seawater Pump operates <br>              intermittently when cooling is needed.<\/p>\n\n\n\n<p>_____     Verify no ALARMS are present<\/p>\n\n\n\n<p>_____     Follow instructions in Installation Manual Section: Startup Instructions to turn off the <span translate=\"no\">Seakeeper<\/span><\/p>\n\n\n\n<p>_____     AC &amp; DC power and seawater pump may be turned off after the <span translate=\"no\">Seakeeper<\/span> is turned off by placing the <br>              <span translate=\"no\">Seakeeper<\/span> in LOCK mode and turning the <span translate=\"no\">Seakeeper<\/span> off<\/p>\n\n\n\n<p>_____     <span translate=\"no\">Seakeeper<\/span> 14 takes 4+ hours to coast down to 0 RPM from full speed<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Please Complete Checklist and E-mail to customerservice@seakeeper.com or telefax to +1.410.326.1199 Mechanical Checklist(Reference Installation Manual Section: Mechanical Installation) _____ Seakeeper foundation installed in hull _____ Foundation bolts torqued to specification Electrical Checklist(Reference Seakeeper Drawing No. 90257 \u2013 Seakeeper 14 Cable Block Diagram &amp; Installation Manual Section: Electrical Installation) Mount Components _____ Optional 5&#8243; Display (near [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":17739,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[326],"model":[],"document_type":[],"hidden":[],"class_list":["post-17743","page","type-page","status-publish","hentry","manual-seakeeper-14-installation-manual-90873-1"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=17743"}],"version-history":[{"count":2,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17743\/revisions"}],"predecessor-version":[{"id":17832,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17743\/revisions\/17832"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17739"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=17743"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=17743"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=17743"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=17743"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=17743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}