{"id":17699,"date":"2023-12-05T15:20:36","date_gmt":"2023-12-05T15:20:36","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-10-5-installation-manual-90841-1-draft-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2025-08-11T12:36:13","modified_gmt":"2025-08-11T12:36:13","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-14-installation-manual-90873-1\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.4.4  Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto the hull foundation beams and align over drilled holes. Apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent) between mating surfaces of <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> frame and hull structure to prevent moisture wicking into bolt holes.<br>\n<ol class=\"wp-block-list\">\n<li>For dissimilar metal foundations, locate and position the 4 isolation gaskets (P\/N 10860) onto foundation beams and apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span>.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Install Mounting Bolts, as shown in Figure 10 below:<br>\n<ol class=\"wp-block-list\">\n<li>For <strong>Blind-Hole installations<\/strong> (P\/N 90870 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 14 Blind-Hole Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M16-2.0 x 95 mm fasteners or alternative Grade 10.9, M16-2.0 bolts to maintain a <strong>minimum thread engagement of 0.94 in. (24 mm).<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel-based anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/li>\n\n\n\n<li>For <strong>Through-Bolt Installations<\/strong> (P\/N 90871 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 14 Through-Bolt Installation Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M16-2.0 x 120 mm fasteners or alternative Grade 10.9, M16-2.0 bolts to maintain a <strong>minimum of 2 threads protruding past nut.<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel-based anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>Torque all fasteners to 155 ft-lbs (210 N-m).<\/strong><\/mark><br>\n<ol class=\"wp-block-list\">\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">New bolts, matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification, must be used for each installation and reinstallation that meet the requirements listed above.<\/mark><\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-medium is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"353\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Blind-Bolt-In-Details-768x353.png\" alt=\"\" class=\"wp-image-18340\" style=\"width:760px;height:auto\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Blind-Bolt-In-Details-768x353.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Blind-Bolt-In-Details-1536x705.png 1536w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Blind-Bolt-In-Details.png 1720w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1731\" height=\"726\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Thru-Bolt-Details.png\" alt=\"\" class=\"wp-image-18341\" style=\"width:760px;height:auto\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Thru-Bolt-Details.png 1731w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Thru-Bolt-Details-768x322.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK14-Thru-Bolt-Details-1536x644.png 1536w\" sizes=\"auto, (max-width: 1731px) 100vw, 1731px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 10<\/em><\/strong><em> &#8211; Blind-hole installation details (TOP) and <\/em><br><em>through-hole installation details (BOTTOM)<\/em><\/figcaption><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":17691,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[326],"model":[],"document_type":[],"hidden":[],"class_list":["post-17699","page","type-page","status-publish","hentry","manual-seakeeper-14-installation-manual-90873-1"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=17699"}],"version-history":[{"count":3,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17699\/revisions"}],"predecessor-version":[{"id":18343,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17699\/revisions\/18343"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17691"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=17699"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=17699"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=17699"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=17699"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=17699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}