{"id":17291,"date":"2023-11-06T12:55:34","date_gmt":"2023-11-06T12:55:34","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-40-installation-manual-90715-1-copy\/installation-checklist-and-supplies\/installation-checklist\/"},"modified":"2024-01-10T13:38:52","modified_gmt":"2024-01-10T13:38:52","slug":"installation-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-40-installation-manual-90715-2\/installation-checklist-and-supplies\/installation-checklist\/","title":{"rendered":"6.1  Installation and Start Up Introduction"},"content":{"rendered":"\n<p>Reference Documents:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.seakeeper.com\/dealer-access\/?type=&amp;product=&amp;search=90437\" target=\"_blank\" rel=\"noreferrer noopener\">90437 &#8211; <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> Commissioning Form<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.seakeeper.com\/dealer-access\/?type=&amp;product=&amp;search=SWI-105\" target=\"_blank\" rel=\"noreferrer noopener\">SWI-105 &#8211; Commissioning Checklist<\/a><\/li>\n\n\n\n<li><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> 40 Operation Manual<\/li>\n<\/ul>\n\n\n\n<p>The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of the<br><span translate=\"no\">Seakeeper<\/span> 40 installation, the installer should commission each <span translate=\"no\">Seakeeper<\/span> unit with the <span translate=\"no\">Seakeeper<\/span> Commissioning Form (90437). The Commissioning Checklist Work Instruction (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the <span translate=\"no\">Seakeeper<\/span> Commissioning Form (90437).<\/p>\n\n\n\n<p>All <span translate=\"no\">Seakeeper<\/span> stabilizers should be commissioned to verify installation specifications and requirements have been implemented properly. The commissioning process should include completion of the <span translate=\"no\">Seakeeper<\/span><br>Commissioning Form (90437), all the items in the Installation Checklist, and verification of <span translate=\"no\">Seakeeper<\/span> 40 operation without alarms or abnormal behavior.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reference Documents: The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of theSeakeeper 40 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist Work Instruction [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":17289,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[318],"model":[],"document_type":[],"hidden":[],"class_list":["post-17291","page","type-page","status-publish","hentry","manual-seakeeper-40-installation-manual-90715-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17291","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=17291"}],"version-history":[{"count":1,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17291\/revisions"}],"predecessor-version":[{"id":17936,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17291\/revisions\/17936"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17289"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=17291"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=17291"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=17291"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=17291"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=17291"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}