{"id":17257,"date":"2023-11-06T12:55:33","date_gmt":"2023-11-06T12:55:33","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-40-installation-manual-90715-1-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2024-01-10T13:39:27","modified_gmt":"2024-01-10T13:39:27","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-40-installation-manual-90715-2\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.4.3  Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Locate and position 4 isolation gaskets (P\/N 10534) onto foundation beams (for metal to metal contacts only).<br>NOTE: A <strong>FILM<\/strong> OF SEALANT SHOULD BE APPLIED TO THE GASKET TO KEEP WATER FROM WICKING INTO THE JOINT.<\/li>\n\n\n\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto foundation beams and align over drilled holes.<\/li>\n\n\n\n<li>Install Mounting Bolts:<br>\n<ol class=\"wp-block-list\">\n<li>For <strong>Through-Bolt installations<\/strong> (P\/N 90086 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 40 Thru-Bolt Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16-2.0 fasteners to maintain a <strong>minimum of 2 threads protruding past nut.<\/strong> Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 6.<\/li>\n\n\n\n<li>For <strong>Blind-Hole installations<\/strong> (P\/N 90614 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 40 Bolt-In Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16-2.0 fasteners to maintain a minimum thread engagement of 0.95 in. (24 mm). Apply a moderate coat of nickel-based anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 7.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\"><strong>Torque all fasteners to 100 ft-lbs (136 N-m).<\/strong><\/mark><br>\n<ol class=\"wp-block-list\">\n<li>New bolts, matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification, must be used for each installation and reinstallation that meet the requirements listed above.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-IM-Mech-Install-Thru-Bolt-Detail.png\" alt=\"\" class=\"wp-image-12478\" width=\"600\" height=\"237\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-IM-Mech-Install-Thru-Bolt-Detail.png 1812w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-IM-Mech-Install-Thru-Bolt-Detail-768x303.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-IM-Mech-Install-Thru-Bolt-Detail-1536x607.png 1536w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 6<\/strong> &#8211; <span translate=\"no\">Seakeeper<\/span> 40 Thru-Bolt Details<\/em> <em>(Standard)<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-Blind-Bolt-Detail.png\" alt=\"\" class=\"wp-image-14996\" width=\"600\" height=\"199\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-Blind-Bolt-Detail.png 1816w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-Blind-Bolt-Detail-768x255.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK40-Blind-Bolt-Detail-1536x511.png 1536w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 7<\/em><\/strong><em> &#8211; <span translate=\"no\">Seakeeper<\/span> 40 Blind-Hole Details<em> (Optional)<\/em><\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":17251,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[318],"model":[],"document_type":[],"hidden":[],"class_list":["post-17257","page","type-page","status-publish","hentry","manual-seakeeper-40-installation-manual-90715-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=17257"}],"version-history":[{"count":2,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17257\/revisions"}],"predecessor-version":[{"id":17943,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17257\/revisions\/17943"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/17251"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=17257"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=17257"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=17257"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=17257"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=17257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}