{"id":14265,"date":"2023-03-17T16:21:51","date_gmt":"2023-03-17T16:21:51","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-3-installation-manual-90378-7-sk3-cbro-draft\/5-0-installation-requirements\/5-3-tools-required-for-installation\/"},"modified":"2023-06-15T11:15:58","modified_gmt":"2023-06-15T11:15:58","slug":"5-3-tools-required-for-installation","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-3-installation-manual-90378-7\/5-0-installation-requirements\/5-3-tools-required-for-installation\/","title":{"rendered":"5.3  Tools Required for Installation"},"content":{"rendered":"\n<p>Table 2 outlines the tools and equipment required for the <span translate=\"no\">Seakeeper<\/span> 3 installation:<\/p>\n\n\n\n<h3 class=\"has-text-align-center wp-block-heading\">Table 2: Tools Required for Installation<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Item<\/strong><\/td><td><strong>Description<\/strong><\/td><td><strong>Use<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td>Hoist, Forklift, or Crane<\/td><td>Unpacking and lifting <span translate=\"no\">Seakeeper<\/span> 3 into position<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td>Transfer Punch Kit<\/td><td>Locate foundation hole penetrations<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td>Drill \/ Drill Press<\/td><td>Bolt hole penetrations<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">4<\/td><td>Threaded Insert Installation Kit<\/td><td>Tap and install threaded inserts (M14-2 X 1.5)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">5<\/td><td>1\/2\u2033 Drive Torque Wrench<\/td><td>Foundation Bolts (155 ft-lbs\/210 Nm)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">6<\/td><td>12 \u2013 18\u2033 Extension, 1\/2\u2033 Drive<\/td><td>Foundation Bolts<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">7<\/td><td>24mm Socket, 1\/2\u2033 Drive<\/td><td>Foundation Bolts<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">8<\/td><td>Utility Knife<\/td><td>Scoring Cable Jackets<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">9<\/td><td>Wire cutter<\/td><td>DC Power cables<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">10<\/td><td>Wire stripper<\/td><td>DC Power cables<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">11<\/td><td>Greenlee K05-Synchro Crimp Tool or equivalent<\/td><td>12 VDC High-Current Input Cables, 2AWG Ground Cable, 4 AWG<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">12<\/td><td>Heat Gun<\/td><td>For cables 1, 2, and 6 heat shrink<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">13<\/td><td>\u00bc in. (7mm) Nut Driver \/ Flat Head Screwdriver<\/td><td>Hose clamps<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">14<\/td><td>Fish Tape<\/td><td>Cable Pulls<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">15<\/td><td>Hole Saw<\/td><td>Thru-hull fittings<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>NOTE: <\/strong>Additional tools may be required for the installation of customer supplied components.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Table 2 outlines the tools and equipment required for the Seakeeper 3 installation: Table 2: Tools Required for Installation Item Description Use 1 Hoist, Forklift, or Crane Unpacking and lifting Seakeeper 3 into position 2 Transfer Punch Kit Locate foundation hole penetrations 3 Drill \/ Drill Press Bolt hole penetrations 4 Threaded Insert Installation Kit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":14256,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[293],"model":[],"document_type":[],"hidden":[],"class_list":["post-14265","page","type-page","status-publish","hentry","manual-seakeeper-3-installation-manual-90378-7"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=14265"}],"version-history":[{"count":3,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14265\/revisions"}],"predecessor-version":[{"id":15692,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14265\/revisions\/15692"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14256"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=14265"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=14265"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=14265"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=14265"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=14265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}