{"id":14191,"date":"2023-03-17T12:13:01","date_gmt":"2023-03-17T12:13:01","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-3-installation-manual-90378-7-sk3-cbro-draft\/2-0-mechanical-installation\/2-3-bolt-in-installation\/2-3-3-installation-of-seakeeper\/"},"modified":"2023-06-15T11:15:57","modified_gmt":"2023-06-15T11:15:57","slug":"2-3-3-installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-3-installation-manual-90378-7\/2-0-mechanical-installation\/2-3-bolt-in-installation\/2-3-3-installation-of-seakeeper\/","title":{"rendered":"2.3.3  Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto the hull foundation beams and align over drilled holes. Apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent)between mating surfaces of <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> frame and hull structure to prevent moisture wicking into bolt holes.<br>\n<ol class=\"wp-block-list\">\n<li>For dissimilar metal foundations locate and position 4 isolation gaskets onto foundation beams and apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> (See Figure 9).<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK3-IM-Mech-Fig-8-CBRO.png\" alt=\"\" class=\"wp-image-14719\" width=\"507\" height=\"570\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK3-IM-Mech-Fig-8-CBRO.png 1725w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK3-IM-Mech-Fig-8-CBRO-684x768.png 684w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK3-IM-Mech-Fig-8-CBRO-768x862.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK3-IM-Mech-Fig-8-CBRO-1368x1536.png 1368w\" sizes=\"auto, (max-width: 507px) 100vw, 507px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 9 &#8211;<\/strong> Isolation Gaskets (P\/N 11671)<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li>Install mounting bolts:<br>\n<ol class=\"wp-block-list\">\n<li>For Blind Hole Installations, install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M16-2.0 x110 mm fasteners or alternative Grade 10.9, M16-2.0 bolts to maintain a minimum thread engagement of .94 in (24 mm). If <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied bolts do not achieve the minimum thread engagement because of the lamination thickness or structure, longer bolts of the same specification (M16-2.0, Grade10.9) should be sourced. If tapping directly into a metal frame shorter bolts maybe required. <strong>Apply a moderate coat of marine anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/strong> See Figure 10 below.<\/li>\n\n\n\n<li>For Through-Bolt installation install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> optional Thru-Bolt Kit (P\/N 90641) Grade 10.9, M16-2.0 x 120 mm fasteners with a minimum of 2 threads passing through the nut If <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied bolts do not pass entirely through the Extra Wide \/ Heavy Hex Nut because of the frame thickness, longer bolts of the same specification (M16-2.0, Grade 10.9) should be sourced. <strong>Apply a moderate coat of marine anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/strong> See Figure 11 below.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Blind-Hole.png\" alt=\"\" class=\"wp-image-11826\" width=\"690\" height=\"334\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Blind-Hole.png 1700w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Blind-Hole-768x373.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Blind-Hole-1536x746.png 1536w\" sizes=\"auto, (max-width: 690px) 100vw, 690px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 10 &#8211;<\/em><\/strong><em> Blind Hole Installation Detail<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Thru-Bolt.png\" alt=\"\" class=\"wp-image-11828\" width=\"695\" height=\"407\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Thru-Bolt.png 1478w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/90374-5-Thru-Bolt-768x451.png 768w\" sizes=\"auto, (max-width: 695px) 100vw, 695px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 11 &#8211;<\/em><\/strong><em> Thru-Bolt Installation Detail<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<ol start=\"3\" class=\"has-vivid-red-color has-text-color wp-block-list\">\n<li><strong>Torque all fasteners to 155 ft-lbs (210 Nm).<br><\/strong>\n<ol class=\"wp-block-list\">\n<li><strong>New bolts matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification must be used for each installation.<\/strong><\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":14181,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[293],"model":[],"document_type":[],"hidden":[],"class_list":["post-14191","page","type-page","status-publish","hentry","manual-seakeeper-3-installation-manual-90378-7"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=14191"}],"version-history":[{"count":6,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14191\/revisions"}],"predecessor-version":[{"id":15275,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14191\/revisions\/15275"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/14181"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=14191"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=14191"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=14191"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=14191"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=14191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}