{"id":13892,"date":"2023-03-15T09:21:31","date_gmt":"2023-03-15T09:21:31","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-4-5-installation-manual\/6-0-installation-and-start-up-checklist\/6-3-start-up-checklist\/"},"modified":"2023-08-08T14:50:24","modified_gmt":"2023-08-08T14:50:24","slug":"6-3-start-up-checklist","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-4-4-5-installation-manual\/6-0-installation-and-start-up-checklist\/6-3-start-up-checklist\/","title":{"rendered":"6.3  Start Up Checklist"},"content":{"rendered":"\n<p>Refer to <span translate=\"no\">Seakeeper<\/span> 4 \/ 4.5 Operation Manual for detailed start up instructions.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/CAUTION.png\" alt=\"\" class=\"wp-image-10247\" width=\"155\" height=\"137\"\/><\/figure>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p class=\"has-vivid-red-color has-text-color\"><br><strong>Prior to beginning the start up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete. <\/strong><br><br><strong>Before continuing, the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span> cover must be installed and the operating clearances must be clear of personnel and equipment.<\/strong><\/p>\n<\/div>\n<\/div>\n\n\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>CHECK<\/strong><\/td><td><strong>REQUIREMENT TO BE MET<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Remove lifting eyebolts and install sealing bolts (M10-1.25 X 12 mm) and flat washers into lifting eyeholes and install cover.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td><strong>FOR SEAKEEPER 4:<\/strong> Energize battery isolation switch, high-current 100 A breaker.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td><strong>FOR SEAKEEPER 4.5:<\/strong> Supply 110-230 VAC to Motor Drive Box at customer-supplied electrical disconnect.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Energize low-current 15 A breaker, and seawater pump breaker.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Verify <span translate=\"no\">Seakeeper<\/span> display is active and no alarms present.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Check that battery voltage exceeds 12 VDC. <br><br><strong>FOR SEAKEEPER 4:<\/strong> A minimum battery voltage of 11 VDC is required for the duration of <span translate=\"no\">Seakeeper<\/span> spool-up.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Override seawater pump \u201cON\u201d and verify flow at seawater outlet.<br>(To activate override, at 0 RPM flywheel speed, hold down SERVICE button wrench icon for 5 seconds to reveal override screen)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Deactivate seawater pump when completed obtaining seawater flow rate.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Press <span translate=\"no\">Seakeeper<\/span> ON\/OFF Button and follow instructions in <span translate=\"no\">Seakeeper<\/span>  Operation Manual for complete start-up instructions.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Verify no alarms are present.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td>Power <span translate=\"no\">Seakeeper<\/span> down, the <span translate=\"no\">Seakeeper<\/span> flywheel will take 2+ hours to coast down<br>to 0 RPM.<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Refer to Seakeeper 4 \/ 4.5 Operation Manual for detailed start up instructions. Prior to beginning the start up sequence all previous Sections of the Installation Manual for Mechanical, Electrical, and Cooling installation must be complete. Before continuing, the Seakeeper cover must be installed and the operating clearances must be clear of personnel and equipment. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":13840,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[289],"model":[],"document_type":[],"hidden":[],"class_list":["post-13892","page","type-page","status-publish","hentry","manual-seakeeper-4-4-5-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/13892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=13892"}],"version-history":[{"count":4,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/13892\/revisions"}],"predecessor-version":[{"id":15985,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/13892\/revisions\/15985"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/13840"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=13892"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=13892"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=13892"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=13892"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=13892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}