{"id":12970,"date":"2023-03-02T14:06:55","date_gmt":"2023-03-02T14:06:55","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-2-installation-manual-90488-3-copy\/mechanical-installation\/longitudinal-bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2023-05-04T12:23:16","modified_gmt":"2023-05-04T12:23:16","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-2-installation-manual\/mechanical-installation\/longitudinal-bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.3.3  Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto the hull foundation beams and align over drilled holes. Apply a small bead of marine sealant (e.g., SILI-THANE 803 or equivalent)between mating surfaces of <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> frame and hull structure to prevent moisture wicking into bolt holes.<br>\n<ol class=\"wp-block-list\">\n<li>For dissimilar metal foundations locate and position 4 isolation gaskets onto foundation beams and apply a small bead of marine sealant (e.g., SILI-THANE 803or equivalent) between both mating surfaces of each isolation gasket where it contacts the beam and the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> (See Figure 7).<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull.png\" alt=\"\" class=\"wp-image-14787\" width=\"425\" height=\"499\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull.png 2192w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull-654x768.png 654w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull-768x902.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull-1308x1536.png 1308w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-CBRO-Over-Hull-1743x2048.png 1743w\" sizes=\"auto, (max-width: 425px) 100vw, 425px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 7 \u2013 <\/strong><span translate=\"no\">Seakeeper<\/span> 2 Longitudinal Bolt-In Installation<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li>Install mounting bolts:<br>\n<ol class=\"wp-block-list\">\n<li>For Blind Hole Installations, install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied Grade 10.9, M14-2.0 x90 mm fasteners or alternative Grade 10.9, M14-2.0 bolts to maintain a minimum thread engagement of 0.83 in (21 mm). If <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied bolts do not achieve the minimum thread engagement because of the lamination thickness or structure, longer bolts of the same specification (M14-2.0, Grade10.9) should be sourced. If tapping directly into a metal frame shorter bolts maybe required. <strong>Apply a moderate coat of marine anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/strong> See Figure 8 below.<\/li>\n\n\n\n<li>For Through-Bolt installation install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> optional Thru-Bolt Kit (P\/N 90636) Grade 10.9, M14-2.0 x 100 mm fasteners with a minimum of 2 threads passing through the nut If <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied bolts do not pass entirely through the Extra Wide \/ Heavy Hex Nut because of the frame thickness, longer bolts of the same specification (M14-2.0, Grade 10.9) should be sourced. <strong>Apply a moderate coat of marine anti-seize (e.g., SAF-T-EZE nickel grade anti-seize, SBT-4Nor equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation.<\/strong> See Figure 9 below.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Blind-Hole.png\" alt=\"\" class=\"wp-image-14777\" width=\"705\" height=\"359\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Blind-Hole.png 1756w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Blind-Hole-768x391.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Blind-Hole-1536x783.png 1536w\" sizes=\"auto, (max-width: 705px) 100vw, 705px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 8 \u2013 <\/strong><span translate=\"no\">Seakeeper<\/span> 2 Blind Hole Bolt Stack Arrangement<\/em><\/figcaption><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Thru-Hole.png\" alt=\"\" class=\"wp-image-14779\" width=\"716\" height=\"258\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Thru-Hole.png 1792w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Thru-Hole-768x277.png 768w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SK2-PCBL-Thru-Hole-1536x554.png 1536w\" sizes=\"auto, (max-width: 716px) 100vw, 716px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 9<\/em><\/strong><em> &#8211; <span translate=\"no\">Seakeeper<\/span> 2 Thru-Hole Bolt Stack Arrangement<\/em><\/figcaption><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":7,"featured_media":0,"parent":12964,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[279],"model":[],"document_type":[],"hidden":[],"class_list":["post-12970","page","type-page","status-publish","hentry","manual-seakeeper-2-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=12970"}],"version-history":[{"count":5,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12970\/revisions"}],"predecessor-version":[{"id":14788,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12970\/revisions\/14788"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12964"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=12970"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=12970"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=12970"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=12970"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=12970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}