{"id":12760,"date":"2023-02-28T16:17:43","date_gmt":"2023-02-28T16:17:43","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-26-20hd-installation-manual-90265-7-copy\/electrical-installation\/electrical-equipment-ground-connections\/"},"modified":"2025-04-04T12:19:49","modified_gmt":"2025-04-04T12:19:49","slug":"electrical-equipment-ground-connections","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-26-installation-manual-90265-8\/electrical-installation\/electrical-equipment-ground-connections\/","title":{"rendered":"3.3  Electrical Equipment Ground Connections"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Connect the <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> foundation to vessel ground.<br>\n<ol class=\"wp-block-list\">\n<li>Install properly sized ring terminals on (10 AWG or 6 mm<sup>2<\/sup>, customer supplied) Ground Cable. <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> connection requires ring terminal for M6 screw.<\/li>\n\n\n\n<li>Install Ground Cable (10 AWG or 6 mm<sup>2<\/sup>, Customer supplied) from the M6 brass ground stud at the rear of the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> frame to a suitable vessel ground.<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"760\" height=\"805\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-26-Ground-Stud-on-Rear-of-Frame-1.jpg\" alt=\"\" class=\"wp-image-4766\" style=\"width:518px;height:548px\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Ground-Stud-on-Rear-of-Frame-1.jpg 760w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Ground-Stud-on-Rear-of-Frame-1-725x768.jpg 725w\" sizes=\"auto, (max-width: 760px) 100vw, 760px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Figure 8 \u2013 <\/strong><span translate=\"no\">Seakeeper<\/span> Ground Stud on Rear of Frame<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<ol start=\"3\" class=\"wp-block-list\">\n<li>Connect 10 AWG (6 mm<sup>2<\/sup>) conductor with ring terminal to vessel grounding bus to comply with:<br>\n<ul class=\"wp-block-list\">\n<li><strong>EN\/IEC 60204-1:2016, CLAUSES 6.3.3 &amp; 8.2.3<\/strong><\/li>\n\n\n\n<li><strong>ABYC E-11, JULY 2021, CLAUSES 11.5.2 &amp; 11.17<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":12752,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[277],"model":[],"document_type":[],"hidden":[],"class_list":["post-12760","page","type-page","status-publish","hentry","manual-seakeeper-26-installation-manual-90265-8"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=12760"}],"version-history":[{"count":10,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12760\/revisions"}],"predecessor-version":[{"id":19870,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12760\/revisions\/19870"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12752"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=12760"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=12760"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=12760"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=12760"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=12760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}