{"id":1276,"date":"2020-08-10T13:54:42","date_gmt":"2020-08-10T13:54:42","guid":{"rendered":"http:\/\/manuals.test\/?page_id=1276"},"modified":"2022-01-10T21:28:34","modified_gmt":"2022-01-10T21:28:34","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-2-installation-manual-rev3\/mechanical-installation\/longitudinal-bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\"><li>Locate and position 4 isolation gaskets onto foundation beams (for metal to metal contacts only). NOTE: Sealant or caulk is recommended to be applied. Apply a small bead (approximately 4 mm wide) of sealant (silicone or caulk) between both mating surfaces of each isolation gasket where it contacts the beam and the <span translate=\"no\">Seakeeper<\/span>. This will prevent water from wicking between the parts and setting up corrosion. Check isolation gasket alignment by test fitting bolts without any obstructions.<\/li><li>Lower <span translate=\"no\">Seakeeper<\/span> into position onto the hull foundation beams and align over drilled holes.<\/li><li>Install <span translate=\"no\">Seakeeper<\/span> supplied M14 fasteners Or Grade 10.9, M14-2.0 bolts to maintain a <span class=\"has-inline-color has-vivid-red-color\">minimum thread engagement of .83 in. (21 mm) \u2013 apply a moderate coat of removable thread locker to the threads<\/span> of each bolt and include a small bead of sealant under each washer before installation.<\/li><li><span class=\"has-inline-color has-vivid-red-color\">Torque all fasteners to 135 ft-lbs (183 N-m). New <span translate=\"no\">Seakeeper<\/span> supplied bolts must be used for each installation and reinstallation.<\/span><\/li><li>Proceed to electrical and cooling portion of the installation.<\/li><\/ol>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-2-Longitudinal-Installation-of-Seakeeper.jpg\" alt=\"\" class=\"wp-image-2022\" width=\"366\" height=\"400\"\/><figcaption><em><strong>Figure 8 \u2013 <\/strong><span translate=\"no\">Seakeeper<\/span> 2 Longitudinal Bolt-In Installation<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-2-Longitudinal-Installation-of-Seakeeper-.jpg\" alt=\"\" class=\"wp-image-2023\" width=\"705\" height=\"500\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-2-Longitudinal-Installation-of-Seakeeper-.jpg 1005w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-2-Longitudinal-Installation-of-Seakeeper--768x545.jpg 768w\" sizes=\"auto, (max-width: 705px) 100vw, 705px\" \/><figcaption><em><strong>Figure 9 \u2013 <\/strong><span translate=\"no\">Seakeeper<\/span> 2 Bolt Stack Arrangement<\/em><\/figcaption><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Locate and position 4 isolation gaskets onto foundation beams (for metal to metal contacts only). NOTE: Sealant or caulk is recommended to be applied. Apply a small bead (approximately 4 mm wide) of sealant (silicone or caulk) between both mating surfaces of each isolation gasket where it contacts the beam and the Seakeeper. This will [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":1267,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[4],"model":[],"document_type":[],"hidden":[],"class_list":["post-1276","page","type-page","status-publish","hentry","manual-seakeeper-2-installation-manual-rev3"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/1276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=1276"}],"version-history":[{"count":22,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/1276\/revisions"}],"predecessor-version":[{"id":8418,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/1276\/revisions\/8418"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/1267"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=1276"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=1276"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=1276"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=1276"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=1276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}