{"id":12732,"date":"2023-02-28T16:17:42","date_gmt":"2023-02-28T16:17:42","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-26-20hd-installation-manual-90265-7-copy\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/"},"modified":"2023-04-19T13:29:56","modified_gmt":"2023-04-19T13:29:56","slug":"installation-of-seakeeper","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-26-installation-manual-90265-8\/mechanical-installation\/bolt-in-installation\/installation-of-seakeeper\/","title":{"rendered":"2.4.3  Installation of Seakeeper"},"content":{"rendered":"\n<ol class=\"wp-block-list\">\n<li>Locate and position 4 isolation gaskets onto foundation beams (for metal to metal contacts only).<br>NOTE: A <strong>VERY SMALL<\/strong> AMOUNT OF SEALANT MAY BE APPLIED TO THE GASKET TO KEEP WATER FROM WICKING INTO THE JOINT. Isolation gaskets are only required when mounting to a structure other than aluminum or GRP.<\/li>\n\n\n\n<li>Lower <span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span> into position onto foundation beams and align over drilled holes.<\/li>\n\n\n\n<li>Install Mounting Bolts:<br>\n<ol class=\"wp-block-list\">\n<li>For <strong>Through-Hole installation<\/strong> (P\/N 90086 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 26 Thru-Bolt Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16 fasteners as shown in figure below to maintain a <strong>minimum of two (2) threads protruding past nut<\/strong>. Apply a moderate coat of nickel-based anti-seize(e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803or equivalent) under each bolt head and washer before installation. See Figure 4 below.<\/li>\n\n\n\n<li>For <strong>Blind-Hole installations<\/strong> (P\/N 90614 &#8211; <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> 26 Bolt-In Kit), install the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> supplied M16 fasteners as shown in figure below to maintain a minimum thread engagement of 0.89 in. (23 mm). Apply a moderate coat of nickel-based anti-seize(e.g., SAF-T-EZE nickel grade anti-seize, SBT-4N or equivalent) to the threads of each bolt and include a small bead of marine grade sealant (e.g., SILI-THANE 803 or equivalent) under each bolt head and washer before installation. See Figure 5 below.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-red-color\">Torque all fasteners to 100 ft-lbs (136 N-m).<\/mark><br>\n<ol class=\"wp-block-list\">\n<li>New bolts matching the <span translate=\"no\"><span translate=\"no\"><span translate=\"no\"><span translate=\"no\">Seakeeper<\/span><\/span><\/span><\/span> specification must be used for each installation and reinstallation that meet the requirements listed above.<\/li>\n<\/ol>\n<\/li>\n\n\n\n<li>Proceed to electrical and cooling portion of the installation.<\/li>\n<\/ol>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-1.jpg\" alt=\"\" class=\"wp-image-4672\" width=\"464\" height=\"373\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-1.jpg 796w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-1-768x617.jpg 768w\" sizes=\"auto, (max-width: 464px) 100vw, 464px\" \/><\/figure>\n<\/div>\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"735\" height=\"689\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-Through-Bolt.jpg\" alt=\"\" class=\"wp-image-4673\"\/><figcaption class=\"wp-element-caption\"><em><strong>Figure 4<\/strong> &#8211; Thru-Bolt Details<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/manuals.seakeeper.com\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-Blind-Hole.jpg\" alt=\"\" class=\"wp-image-4674\" width=\"392\" height=\"347\" srcset=\"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-Blind-Hole.jpg 779w, https:\/\/manuals.seakeeper.com\/seakeeper\/wp-content\/uploads\/SEAKEEPER-26-Bolt-In-Installation-Blind-Hole-768x681.jpg 768w\" sizes=\"auto, (max-width: 392px) 100vw, 392px\" \/><figcaption class=\"wp-element-caption\"><strong><em>Figure 5<\/em><\/strong><em> &#8211; Blind Hole Details<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":0,"parent":12726,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[277],"model":[],"document_type":[],"hidden":[],"class_list":["post-12732","page","type-page","status-publish","hentry","manual-seakeeper-26-installation-manual-90265-8"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=12732"}],"version-history":[{"count":7,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12732\/revisions"}],"predecessor-version":[{"id":14657,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12732\/revisions\/14657"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/12726"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=12732"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=12732"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=12732"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=12732"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=12732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}