{"id":10244,"date":"2022-08-02T18:28:12","date_gmt":"2022-08-02T18:28:12","guid":{"rendered":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-5-6-installation-manual-90402-3-copy\/installation-checklist-and-supplies\/required-supplies-needed-for-seakeeper-installation\/"},"modified":"2023-02-22T17:44:51","modified_gmt":"2023-02-22T17:44:51","slug":"required-supplies-needed-for-seakeeper-installation","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/seakeeper\/seakeeper-5-6-installation-manual-rev4\/installation-checklist-and-supplies\/required-supplies-needed-for-seakeeper-installation\/","title":{"rendered":"6.2  Required Supplies Needed for Seakeeper Installation"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"block-cc9a261a-6fb8-4cea-b93c-3c7300df6803\" style=\"font-size:25px\">6.2.1  (Not Supplied With the <span translate=\"no\">Seakeeper<\/span>)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Item<\/th><th>Description<\/th><th>Qty<\/th><th>Installation Manual Reference Section<\/th><th>Other Reference<\/th><th>System<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>Adhesive and cleaning supplies for bonding to hull<\/td><td><\/td><td><a href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/\" target=\"_blank\" rel=\"noreferrer noopener\">Mechanical Installation<\/a><\/td><td><\/td><td>Mechanical<\/td><\/tr><tr><td>2<\/td><td>Soundproofing Considerations<\/td><td><\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/selection-of-installation-location\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/selection-of-installation-location\" target=\"_blank\">Selection of Installation Location<\/a><\/td><td><\/td><td>Mechanical<\/td><\/tr><tr><td>3<\/td><td>Spreader bar for lifting <span translate=\"no\">Seakeeper<\/span><\/td><td><\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/transport-and-unpacking\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/mechanical-installation\/transport-and-unpacking\" target=\"_blank\">Transport and Unpacking<\/a><\/td><td><\/td><td>Mechanical<\/td><\/tr><tr><td>4<\/td><td>Hose clamps for seawater plumbing to \u00be in. (19 mm) hose barb (2 per hose barb)<\/td><td>4<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/cooling-installation\/connecting-seawater-to-heat-exchanger\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/cooling-installation\/connecting-seawater-to-heat-exchanger\" target=\"_blank\">Connecting Seawater to Heat Exchanger<\/a><\/td><td><\/td><td>Cooling<\/td><\/tr><tr><td>5<\/td><td>Circuit Breaker, AC, 2-Pole, (30 A to be used with 110-120 VAC, <strong>OR<\/strong> Nominal (\u00b1 10%), 20 A to be used with 208-230 VAC Nominal (\u00b1 10%))<\/td><td>1<\/td><td><a href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" target=\"_blank\" rel=\"noreferrer noopener\">Electrical Equipment Power Connections<\/a><\/td><td>Dwg 90396<\/td><td>Electrical<\/td><\/tr><tr><td>6<\/td><td>Circuit Breaker, DC, 1-Pole, 15 A<\/td><td>2<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" target=\"_blank\">Electrical Equipment Power Connections<\/a><\/td><td>Dwg 90396<\/td><td>Electrical<\/td><\/tr><tr><td>7<\/td><td>M6 terminal lug for grounding <span translate=\"no\">Seakeeper<\/span> at rear brace<\/td><td>1<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-ground-connections\/\" target=\"_blank\">Electrical Equipment Ground Connections<\/a><\/td><td><\/td><td>Electrical<\/td><\/tr><tr><td>8<\/td><td>Cable, 10 AWG, for grounding <span translate=\"no\">Seakeeper<\/span> at rear brace to vessel ground<\/td><td>AR<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" target=\"_blank\">Electrical Equipment Power Connections<\/a><\/td><td>Dwg 90396<\/td><td>Electrical<\/td><\/tr><tr><td>9<\/td><td>Seawater pump, 12 VDC<\/td><td>1<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-ground-connections\/\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-ground-connections\/\" target=\"_blank\">Electrical Equipment Ground Connections<\/a> <\/td><td><\/td><td>Electrical<\/td><\/tr><tr><td>10<\/td><td>Relay for seawater pump control (Not required if using <span translate=\"no\">Seakeeper<\/span> output 12 VDC pump)<\/td><td>1<\/td><td><a rel=\"noreferrer noopener\" href=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" data-type=\"URL\" data-id=\"https:\/\/manuals.seakeeper.com\/seakeeper-5-6-installation-manual\/electrical-installation\/electrical-equipment-power-connections-2\/\" target=\"_blank\">Electrical Equipment Power Connections<\/a> <\/td><td><\/td><td>Electrical<\/td><\/tr><tr><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><strong><br>AR = As Required<br>Dwg = Drawing<\/strong><\/figcaption><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:25px\">6.2.2  List of Common Tools That May Be Required for Installation<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Item<\/th><th>Description<\/th><th>Use<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>Wire cutter<\/td><td>DC Power, AC Power cables<\/td><\/tr><tr><td>2<\/td><td>Wire stripper<\/td><td>DC Power, AC Power cables<\/td><\/tr><tr><td>3<\/td><td>13 mm Socket Wrench<\/td><td>Cover Panels<\/td><\/tr><tr><td>4<\/td><td>Phillips head screwdriver, 5\/64 inch<\/td><td>Cover Panels<\/td><\/tr><tr><td>5<\/td><td>Slot screwdriver, 5\/64 inch<\/td><td>Field assembly connectors<\/td><\/tr><tr><td>6<\/td><td>\u00bc in. nut driver<\/td><td>Hose clamps<\/td><\/tr><tr><td>7<\/td><td>Terminal or quick disconnect crimper<\/td><td>Power cables<\/td><\/tr><tr><td>8<\/td><td>Utility knife<\/td><td>Scoring cable jackets<\/td><\/tr><tr><td>9<\/td><td>10 mm Socket Wrench<\/td><td>Ground Stud<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>6.2.1 (Not Supplied With the Seakeeper) Item Description Qty Installation Manual Reference Section Other Reference System 1 Adhesive and cleaning supplies for bonding to hull Mechanical Installation Mechanical 2 Soundproofing Considerations Selection of Installation Location Mechanical 3 Spreader bar for lifting Seakeeper Transport and Unpacking Mechanical 4 Hose clamps for seawater plumbing to \u00be in. [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":10240,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[259],"model":[],"document_type":[],"hidden":[],"class_list":["post-10244","page","type-page","status-publish","hentry","manual-seakeeper-5-6-installation-manual-rev4"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/10244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/comments?post=10244"}],"version-history":[{"count":4,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/10244\/revisions"}],"predecessor-version":[{"id":11945,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/10244\/revisions\/11945"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/pages\/10240"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/media?parent=10244"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/manual?post=10244"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/model?post=10244"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/document_type?post=10244"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/seakeeper\/wp-json\/wp\/v2\/hidden?post=10244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}