Seakeeper 40 Installation Manual (90715-4) 40-254-0200 to Current
6.0 Installation and Start Up Checklist
6.1 Installation and Start Up Introduction
Reference Documents:
- 90437 – Seakeeper Commissioning Form
- SWI-105 – Commissioning Checklist
- Seakeeper 40 Operation Manual
The Installation and Start Up Checklists in this section provide an overview of the primary steps covered in the installation manual and should be referenced throughout the installation process. Upon completion of the Seakeeper 40 installation, the installer should commission each Seakeeper unit with the Seakeeper Commissioning Form (90437). The Commissioning Checklist Work Instruction (SWI-105) provides a checklist of items to inspect and verify during the commissioning process and serves as a supplement to the Seakeeper Commissioning Form (90437).
All Seakeeper stabilizers should be commissioned to verify installation specifications and requirements have been implemented properly. The commissioning process should include completion of the Seakeeper
Commissioning Form (90437), all the items in the Installation Checklist, and verification of Seakeeper 40 operation without alarms or abnormal behavior.
6.2 Installation Checklist
Please Complete Checklist and E-mail to support@seakeeper.com or emeasupport@seakeeper.com (outside of the Americas).
Mechanical Checklist
(Reference Installation Manual Section: Mechanical Installation)
Seakeeper foundation installed in hull
Foundation bolts torqued to specification
Electrical Checklist
(Reference Seakeeper Drawing No. 90710 – Seakeeper 40 Cable Block Diagram & Installation Manual Section: Electrical Installation)
Mount Components
Multifunction Display (at helm)
Remote ConnectBox mounting: ______________________ (location)
Connect Customer Supplied Cables
Ground Cable (Customer Supplied)
Install lugs on both ends of customer-supplied 10 AWG ground cable
Connect one end of Ground Cable to nearest vessel ground and other end to Seakeeper foundation frame
Connect Seakeeper Supplied Cables
DC Input Power Cable (Seakeeper supplied)
Connect the DC Input Power Cable from Seakeeper to 24 VDC power at customer-supplied connection box or directly to circuit breaker
Plug connector of DC Input Power Cable into mating connector on Seakeeper wire harness
AC Power Input Cable (Seakeeper Supplied)
Connect the AC Power Input Cable from Drive Box to 230 VAC single phase at customer-supplied connection box or directly to circuit breaker
CAN Communication Assembly (Seakeeper Supplied)
Connect female end of CAN communications Cable to mating connector on Seakeeper wire harness
Route CAN communications Cable from Seakeeper to helm (male end goes to helm)
Connect male end of CAN communications Cable at helm to CAN Tee Adapter
Connect Display and Seakeeper-supplied 24 in. (0.6 m) cable to CAN Tee Adapter with CAN Terminator
Seawater Pump Power Output Cable (Seakeeper Supplied)
Connect Seawater Pump Power Output Cable from Seakeeper wire harness to customer-supplied 24 VDC seawater pump
Seawater Pump Power Input Cable (Seakeeper supplied)
Connect the Seawater Pump Power Input Cable from Seakeeper DC SW Pump In to 24 VDC power at customer supplied connection box or directly to circuit breaker
Cooling Checklist
(Reference Installation Manual Section: Cooling Installation)
Verify coolant level in heat exchanger coolant reservoir.
Connect seawater hoses / open sea cocks to heat exchanger and test seawater pump.
Verify 13 GPM (49 LPM) minimum and 15 GPM (57 LPM) maximum seawater flow through heat exchanger under all operating conditions of the boat.
6.3 Start Up Checklist
(Reference Installation Manual Section: Start Up & Operation Manual Section: System Operation)
- Remove lifting eyes, install sealing fasteners in lifting holes, and install cover panels
- Check polarity of 24 VDC power per Section: Electrical Equipment Power Connections – DC Power and Seawater Pump Connection Instructions.
- Turn on 24 VDC circuit breakers for control power and DC Seawater Pump
- Turn on 230 VAC circuit breaker
- Verify display works and no ALARMS are present
- If display does not work, turn off both circuit breakers immediately.
- Follow instructions in Operations Manual Section: Start Up Instructions to turn on the Seakeeper
- Verify that no ALARMS are present
- Follow instructions in Section: Start Up Instructions to turn off the Seakeeper
- AC & DC power and seawater pump may be turned off after the Seakeeper is turned off by placing the Seakeeper in LOCK mode and turning the Seakeeper off.
- Seakeeper 40 takes 4+ hours to coast down to 0 RPM from full speed