{"id":10524,"date":"2022-07-08T15:55:49","date_gmt":"2022-07-08T15:55:49","guid":{"rendered":"https:\/\/manuals-dev.seakeeper.com\/ride\/qs2-105-1-seakeeper-ride-installation-manual-electrical-install\/wiring-and-terminating-cables\/8-4-keypad-optional\/"},"modified":"2022-11-21T16:35:23","modified_gmt":"2022-11-21T16:35:23","slug":"8-4-keypad-optional","status":"publish","type":"page","link":"https:\/\/manuals.seakeeper.com\/ride\/seakeeper-ride-electrical-installation-manual\/wiring-and-terminating-cables\/8-4-keypad-optional\/","title":{"rendered":"8.4. Keypad Wiring (Optional)"},"content":{"rendered":"\n<p>Connect a NMEA 2000 cable to the Keypad and <span translate=\"no\">Seakeeper<\/span> Ride CAN Bus Tee (E in <a href=\"https:\/\/manuals.seakeeper.com\/ride\/seakeeper-ride-electrical-installation-manual\/wiring-and-terminating-cables\/8-1-1-seakeeper-can-bus-tee\/#Fig10\">Figure 11<\/a>) using the 3 m (6.6 ft) cable supplied.<\/p>\n\n\n\n<p>You have now completed the electrical installation of the <span translate=\"no\">Seakeeper<\/span> Ride system. Follow the instructions in <a href=\"https:\/\/manuals.seakeeper.com\/ride\/seakeeper-ride-commissioning-instructions\/1-introduction\/\">the <span translate=\"no\">Seakeeper<\/span> Ride Commission Instructions<\/a> for the first start and calibration of the system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Connect a NMEA 2000 cable to the Keypad and Seakeeper Ride CAN Bus Tee (E in Figure 11) using the 3 m (6.6 ft) cable supplied. You have now completed the electrical installation of the Seakeeper Ride system. Follow the instructions in the Seakeeper Ride Commission Instructions for the first start and calibration of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":10507,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"manual":[270],"model":[],"document_type":[],"hidden":[],"class_list":["post-10524","page","type-page","status-publish","hentry","manual-seakeeper-ride-electrical-installation-manual"],"acf":[],"_links":{"self":[{"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/pages\/10524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/comments?post=10524"}],"version-history":[{"count":8,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/pages\/10524\/revisions"}],"predecessor-version":[{"id":12320,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/pages\/10524\/revisions\/12320"}],"up":[{"embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/pages\/10507"}],"wp:attachment":[{"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/media?parent=10524"}],"wp:term":[{"taxonomy":"manual","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/manual?post=10524"},{"taxonomy":"model","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/model?post=10524"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/document_type?post=10524"},{"taxonomy":"hidden","embeddable":true,"href":"https:\/\/manuals.seakeeper.com\/ride\/wp-json\/wp\/v2\/hidden?post=10524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}